Acknowledgement
이 논문은 2021년도 한국기술교육대학교 교수 교육연구진흥과제 및 정부(과학기술정보통신부)의 재원으로 한국연구재단의 지원(NO. 2021R1F1A1062967)에 의하여 연구되었음.
References
- Aggarwal. J.K., and Ryoo. M.S. (2011). "Human activity analysis: A Review" ACM Computing Surveys, CSUR, 43(3), pp. 1-43. https://doi.org/10.1145/1922649.1922653
- Azar, E.R,, Feng, C., and Kamat, V.R. (2015). "Feasibility of In-Plane Articulation Monitoring of Excavator Arm Using Planar Marker Tracking." Journal of Information Technology in Construction, ITcon, 20(15), pp. 213-229.
- Bolourian, N., and Hammad, A. (2020). "LIDAR-equipped UAV path planning considering potential locations of defects ofr bridge inspection, Automation in Construction, 117, 103250.
- Choi, B.K. (2015). A Study on status of productivity according to labor trend in construction sites.
- Choi, K.A. (2021). "A Coastal Garbage Monitoring System Using Drones and AI Technologies: Focusing on the Case of Jeju Province." Automation in Construction, 12, pp. 127-128.
- Choi, J.D. (2021). "Effects of aged consurction worker' s safety consciousness and safety climate on unsafe behaviors." Doctor's degree, University of Koreatech.
- Fangyu L., Sisi Z., Martiin K., Xueying B., and Abdoulaye D. (2018). "Universal path planning for and indoor drone." Automation in Construction, 95, pp. 275-283. https://doi.org/10.1016/j.autcon.2018.07.025
- Gong, J., and Caldas, C.H. (2011). "An Object recognition tracking and contexual reasoning-based video interpretation method ofr rapid productivity analysis of construction operations." Automation in Construction, 20(8), pp. 1211-1226. https://doi.org/10.1016/j.autcon.2011.05.005
- Han, S.H., Sohn, H.G., Kim, J.S., and Woo, S.K. (2008). "Examination of Construction Site Using 3D Laser scanner." The Journal of geographic information system association of Korea Spring Conference, pp. 525-528.
- Hwang E.K. (2015). Architecture & Society, Korea Architects Institute, pp. 12-18.
- Jeon R.E., Yu. Y.S., Jung. I.S., and Lee. C.S. (2012). "Analysis of Importance on the Inspection Task in Asbestos Dismantlement & Removal Work." Architectural Institute of Korea, pp, 629-630.
- Jeong K.Y., and Kim. K.J. (2018). "A Study on Developing an Automatic Model for Quantity Estimation of Seawater Desalination Plants Off-shore Structure." Master's degree, University of Chung Ang.
- Jo B.W., Lee. Y.S., Kim, D.K., Kim, J.H., and Choi, P.H. (2016). "Image-based Proximity Warning System for Excavator of Construction Sites." The Journal of the Korea Contents Association, 16(10), pp. 588-597.
- Jo H.M., and Kim. C.W. (2017). "Detection of moving objects from moving camera in construction site." Journal of the Architectural Institute of Korea, JAKI, 37(1), pp. 931-932.
- Kang. S.H., and Jeong. Y.S. (2012). "Progress Measurement Pattern and Data Acquisition Technology Selection Algorithm for Automated Progress Mangement." Proceedings of KICEM Annual Conference, KICEM, 12, pp. 87-89.
- Park. J.G., Sin. J.C., Hwang. J.H., Lee. K.H., Seo, H.J., and Lee, I.M. (2012). "Assessment of over/under-break of tunnel utilizing BIM and 3D laser scanner." Journal of Korean Tunnelling and Underground Space Association, 14(4), pp. 437-451. https://doi.org/10.9711/KTAJ.2012.14.4.437
- Park. S.M., Kim. Y.J., Jeong. Y.G., and Lee. I.S. (2017). "Trends in Drone Technology in Construction Industry." The Korean Steel Construction, 8, pp. 17-24.
- Kang S.C., Kim. C.S., Jung. J.I., Kim. U.J., and Park. J.W. (2021). "A Study on the Method of Facility Management and the Effectiveness of 3D Mapping using Drone in Large Areas." Journal of the Korean Society of Computer Education, 4, pp. 223-226.
- Kim. J.M., and Jeong, Y.C. (2021). "A Study on the Improvement Measures of Safety Supervision System for Small and Medium-Sized Consturction Sites: Focusing on the Supervision System under the Building Act." Korean Society of Public Sociology, 11(2), pp. 86-109.
- Kim M.K., Cheng, J.C., Sohn, H., and Chang, C.C. (2015). "A framework for dimensional and surface." Automation in Construction, 49, pp. 225-238. https://doi.org/10.1016/j.autcon.2014.07.010
- Kim. S.K. (2017). "Drone Geospatial data use cases and Construction field use plans." The Korean Society for Geospatial Information Science, 5, pp. 3-46. https://doi.org/10.7319/kogsis.2017.25.1.003
- Kim. T.H. (2021). "Construction Site Monitoring using Vision Artificial Intelligence." Architectural Institute of Korea, 65(12), pp. 64-67.
- Kim Y.S., and Kim. A. (2008). "A study on Comparative Analysis for Improvement of Architectural Construction Supervisory System." Journal of the Architectural Institute of Korea Planning & Design, 24(11), pp. 47-56.
- KOSIS. (2022). 「Construction industry survey」, Statistical Office, (Jan. 19. 2022).
- Krchung., K.R., Lee, B.D., and Kim. T.H. (2019). "Engneering Construction With High-Precision Survey Equipment(3D laser scanner, 3D photo scanner, drone)" Proceedings of the Korean Institute of Building Construction Conference, 19(1), pp. 133-134.
- Kwon. S.W. (2009). "Object Recognition and Modelling Technology Using Laser Scanning and BIM for Construction Industry." Journal of the Architectural Institiute of Korea, JAIK, 53(4), pp. 31-38.
- Lee. D.W., and Yoon. H.S. (2016). "Improvement of Construction Management Process for the Site Manager in Small Scale Building Construction Project." Journal of the Korea Institute of Building Construction, 18(1), pp. 81-87.
- Lee. H.S. (1996). "A Method of Estimating the Construction Duration based on Rdpetitive Work Modules for Reinforced Concrete Buildings." Architectural Institute of Korea, 12(5), pp. 257-266.
- Lee. J.Y. (2005). "Direction of Systematic Reform action in Architectural Design, Management and Examination - Focusing on Small-scale Bulidings." Korean Architects, 5, pp. 64-71.
- Lee. S.J., and Kwon, S.W. (2021). "AI-based work support technology of member crack detection for precision construction of OSC(off site construction)" Masters degree', University of Sung Kyun Kwan.
- Luo. H., Xiong. C., Fang. W., Love. P.E.D., Zhang. B., and Quyang. X. (2018). "Convolutional neural networks: Computer vision-based workforce activity assessment in construction." Automation in Construction, 94, pp. 282-289. https://doi.org/10.1016/j.autcon.2018.06.007
- Luo. X., Li. H., Wu. Z., Dai. F., and Cao. D. (2018). "Recognizing Diverse Construction Activities in Site Images via Relevance Networks." J, Comput, Civ, Eng., 32(3), 04018012.
- Park J.H., Kim. H., and Choo. S.Y. (2020). "A Development on Deep Learning-based Detecting Technology of Rebar Placement ofr Improving Building Supervision Efficiency." Journal of the Architectural Institute of Korea Planning & Design, 36(5), pp. 93-103.
- Song S.M., Joo. H.J., and Choi. B.S. (2020). "Construction site drone technology use case." Korean Geosynthetics Scociety, 1, pp. 21-31.
- Yoon J.S., Yoo. B.E., and Han. C.P. (2006). "Measures to Implement Comprehensive Supervision for the Purpose of Bolstering Construction Management(CM)" Journal of the Korea Institute of Building Construction, 6(4), pp. 99-102.
- Turkan, Y., Bosche. F., and Haas. R. (2012). "Automated progress tracking using 4D schedule and 3D sensing technologies." Automation in Construction, 22, pp. 414-421. https://doi.org/10.1016/j.autcon.2011.10.003