Acknowledgement
본 연구는 2022년도 정부(과학기술정보통신부)의 재원으로 한국연구재단의 지원을 받아 수행된 기초연구사업임(No. 2019R1A2C2010794).
References
- AACE (2011). "Forensic Schedule Analysis." Recommended Practice No. 29R-03, TCM Framework: 6.4- Forensic Performance Assessment, Association for the Advancement of Cost Engineering.
- Arditi, D., and Pattanakitchamroon, T. (2006). "Selecting a delay analysis method in resolving construction claims." International Journal of Project Management, 24(2), pp. 145-155. https://doi.org/10.1016/j.ijproman.2005.08.005
- Braimah, N. (2013). Construction Delay Analysis Techniques-A Review of Application Issues and Improvement Needs. Buildings 2013, 3(3), pp. 506-531. https://doi.org/10.3390/buildings3030506
- Bramble, B.B., and Callahan, M.T. (2011). "Construction Delay Claims" 4th edition, Aspen Publishers, USA.
- Choi, S.K. (2016). "Legal Issues Relating to Acceleration in International Construction Contracts." Korea International Trade Law Association, KITLA, 25(1), pp. 205-243.
- Cushman, R.F., Carter, J.D., Gorman, P.J., and Coppi, D.F. (2021). "Proving and Pricing Construction Claims." Fourth Edition, Wolters Kluwer, New York, NY 10011. pp. 2-38.
- Jung, H.S., and Seok, G.H. (2017). "International Construction & Energy Law - Theory and Practice" Korean Society on International Construction & Energy Law Series, 1(1), Pakyoungsa ed. (in Korean).
- Kim, K.R. (2017). "Improvement of Imposition System of Liquidated Damages." Public Finance Forum, KIPF, l(252), pp. 24-50.
- MacMabon Construction Pty Ltd v. Crestwood Estates (1971). WAR 162.
- Miller v. London County Council (1934). All ER 657.
- Peak Construction (Liverpool) Ltd. V. McKinney Foundations Ltd. (1970). 1 BLR 111.
- ROHLIN CONSTRUCTION CO., INC. v. CITY OF HINTON, Supreme Court of Iowa, 1991. 476 N.W.2d 78.
- SCL (2017). "DELAY AND DISRUPTION PROTOCOL" 2nd edition, Society of Construction Law, February 2017.
- Sweet J. (1996). "Legal Aspects of Architecture Engineering and the Construction Process" West Pub. Co. 4th edition, USA.
- Shin, H.C. (2019). "An Analysis of Problems and Survey on the Application Method for Delay Analysis." M.S. Thesis, Chung-Ang University, Seoul, Republic of Korea (in Korean).
- The Trustees of Columbia University in the City of New York v. D'Agostino Supermarkets, 36 N.Y.3d 69 (2020).
- Wickwire J.M., Driscoll, T.J., and Hurlbut, S.B. (1991). "Construction scheduling: Preparation, Liability, and Claims." Wiley Law Publications, New York (NY).