Acknowledgement
본 연구는 국토교통부의 스마트시티 혁신인재육성사업과 국토교통부/국토교통과학기술진흥원의 2023년도 지원으로 수행 되었음(과제번호: RS-2021-KA163269).
References
- Architecture & Urban Research Institute (2020). Architectural Service Industry Trends and Issues, p. 24.
- Cha. J. H., Choi. J. S., Bae. Y. S., Woo. Y. W. (2020). An Optimization Method of Spatial Placement for Effective Vehicle Loading, Journal of the Korea Institute of Information and Communication Engineering, 24(2), pp. 186-191. https://doi.org/10.6109/JKIICE.2020.24.2.186
- Chang. D. K., Park. J. H. (2022). The Multi-objective Optimization Using Evolutionary Algorithm to Design Architectural Layouts, Journal of the Architectural Institute of Korea, 38(11), pp. 37-48.
- Choi, M., Lee, K., Cho. T. (2004). Application of Expert System to Automatic Dimension Marking on Design Drawing, Journal of the Korea Society for Simulation, 13(4), pp. 31-42.
- Han. S. N., Lee. K. Y., Roh. M. L. (2001). A Study on the Optimal Facility Layout Design Using an Improved Genetic Algorithm, Transactions of the Society of CAD/CAM Engineers, 6(3), pp. 174-183.
- Heo. W. J. (2017). A Study on the Acceleration of an Overlap Avoidance Algorithm in Pipe Installation Drawing Using GPU, Master Thesis, Naval Architecture and Ocean Engineering, Chungnam National University.
- Hwang, I., Ruy, W., Park, I., Park, J. (2016). Application of Overlap Avoidance to Augment the Production Data in Pipe Installation Drawings, Journal of the Society of Naval Architects of Korea, 53(5), pp. 428-434. https://doi.org/10.3744/SNAK.2016.53.5.428
- Kim. Y. G., Park. K. (2022). Rule Based Facility Layout Optimization Using PSO Algorithm, The Korean Society of Mechanical Engineers Spring and Autumn Conference, 2022(5), p. 63.
- Malysh, K. (2020). Optimization of 2D Drawings in Architectural Engineering and Construction, Masters Thesis, Information Technology, Tampere University.
- Mangal. M., Li. M., Gan. V. J. L., Cheng. J. C. P. (2021). Automated Clash-free Optimization of Steel Reinforcement in RC Frame Structures Using Building Information Modeling and Two-stage Genetic Algorithm, Automation in Construction, 126(2021), 103676.
- Ministry of Land, Infrastructure, and Transport (2021). BIM-based Construction Industry Digital Transformation Roadmap.
- Ministry of Land, Infrastructure, and Transport (2022). Smart Construction Activation Plan S-Consturciton 2030.
- Park. S. E (2023). A Study on Securing Productivity Through Quantitative Analysis of Log Data-Based BIM Drawing Generation Process, Master Thesis, Sungkyunkwan University.
- Ruy, W., Yang, Y., Yun, Y., Ko, D. (2009). Overlap-Avoidance Algorithm for Automation of Drawing Generation, Journal of the Society of Naval Architects of Korea, 46(6), pp. 622-630. https://doi.org/10.3744/SNAK.2009.46.6.622
- Shin. J. H. (2023). Development of Interference Detection and Rearrangement Algorithm for BIM Drawing Annotation Objects, Master Thesis, Global Smart City, Sungkyunkwan University.
- Zhao, Z. B., Niu, Q. Z. (2014). The Research and Implementation of Autodimension in Engineering Drawing based on Pro/E. Applied Mechanics and Materials, 610, pp. 615-619. https://doi.org/10.4028/www.scientific.net/AMM.610.615