Acknowledgement
이 논문은 2023년도 정부(산업통상자원부)의 재원으로 한국에너지기술평가원의 지원을 받아 수행된 연구임(20214000000520, 자원순환(재제조)산업 고도화 인력양성). 그리고 한국연구재단의 국제협력사업의 연구비 지원으로 수행되었습니다(2022K2A9A2A06035391).
References
- Boysen, N., Briskorn, D., Meisel, F. (2017), "A generalized classification scheme for crane scheduling with interference", European Journal of Operational Research, 258(1) 343-357. https://doi.org/10.1016/j.ejor.2016.08.041
- Gharehgozli, A. H., Vernooij, F. G., Zaerpour, N. (2017), "A simulation study of the performance of twin automated stacking cranes at a seaport container terminal", European Journal of Operational Research, 261(1) 108-128. https://doi.org/10.1016/j.ejor.2017.01.037
- Han, X., Wang, Q., Huang, J. (2019), "Scheduling cooperative twin automated stacking cranes in automated container terminals", Computers & Industrial Engineering, 128, 553-558. https://doi.org/10.1016/j.cie.2018.12.039
- Hu, Z.H., Tian, X.D., Yin, Y.Q., Wei, C. (2021), "Positioning a Handshake Bay for Twin Stacking Cranes in an Automated Container Terminal Yard Block", Journal of Advanced Transportation. 2022, 1-17.
- Kang, B., Kim, B., Hong, S. (2022), "Sequential Optimization of a Temporary Storage Location for Cooperative Twin Overhead Shuttles in a Rail-Based Automated Container Terminal. Advances in Production Management Systems", Smart Manufacturing and Logistics Systems: Turning Ideas into Action (APMS), Gyeongju, Korea, pp. 285-292.
- Kim, D., Seo, Y. (2014), "Integrated Storage System For Automobile Production Line", Society of Korea Industrial and Systems Engineering, 37(2), 1-8. https://doi.org/10.11627/jkise.2014.37.2.01
- Kim, B., Park, J., Hong, S. (2023), "A Simulation Evaluation of Aisle Design and Operation Policies for an Automated Storage and Retrieval System with Narrow-/Wide- Width Racks", Journal of Korean Society of Industrial and Systems Engineering, 46 (1), 68-75. https://doi.org/10.11627/jksie.2023.46.1.068
- Kim, B., Fibrianto, H.Y., Hong, S. (2019), "The effect on a handshake operation between twin overhead shuttle cranes under demand uncertainty", 49th International Conference on Computers and Industrial Engineering, Beijing, China, pp.1496-1505.
- Ok, C.H., Kim, D.S., Gong, J.S., Seo, Y. (2012), "Study on Integrated Storage Systems for Automobile Production", Journal of the Korea Society for Simulation, 21(2), 91-101. https://doi.org/10.9709/JKSS.2012.21.2.091
- Tanaka, S., Araki, M., (2009), "Routing problem under the shared storage policy for unit-load automated storage and retrieval systems with separate input and output points", International Journal of Production Research, 47, 2391-2408. https://doi.org/10.1080/00207540701644177
- Zey, L., Briskorn, D., Boysen, N. (2021), "Twin-crane shceduling during seaside workload peaks with a dedicated handshake area", Journal of Scheduling, 25, 3-34.