Acknowledgement
본 논문은 한국건설기술연구원의 수요기반 중소·중견기업 애로기술 해결 지원사업(초근접 병설터널의 필라 보강 및 터널굴착기술 개발)의 지원으로 수행되었습니다. 이에 드립니다.
References
- An, Y.K., Kong, S.M., Lee, Y.J. (2014), "Assessment of minimum pillar width and reinforcement of parallel tunnel using numerical analysis and field monitoring", Journal of Korean Tunnelling and Underground Space Association, Vol. 16, No. 3, pp. 299-310. https://doi.org/10.9711/KTAJ.2014.16.3.299
- Hoek, E., Brown, E.T. (1980), "Empirical strength criterion for rock masses", Journal of the Geotechnical Engineering Division, Vol. 106, No. 9, pp. 1013-1035. https://doi.org/10.1061/AJGEB6.0001029
- Itasca Software Documentation Home page, http://docs.itascacg.com (October 14, 2022).
- Jo, Y.S., Kim, Y.H., Hong, J.Y., Kim, D.G., Kim, B.J. (2021), "Analysis of pillar stability according to reinforcement method for very near parallel tunnel", Journal of Korean Tunnelling and Underground Space Association, Vol. 23, No. 2, pp. 119-131. https://doi.org/10.9711/KTAJ.2021.23.2.119
- Kim, D.S., Kim, Y.G. (2007), "A study on the stability analysis for asymmetry parallel tunnel with rock pillar", Journal of Korean Tunnelling and Underground Space Association, Vol. 9, No. 4, pp. 387-401.
- Kim, J.H., Kim, J.W. (2017), "Stability estimation of the pillar between twin tunnels considering various site conditions", Tunnel and Underground Space, Vol. 27, No. 2, pp. 109-119. https://doi.org/10.7474/TUS.2017.27.2.109
- La, Y.S., Kim, B.J. (2016), "Effect of separation between main and divergent tunnels in divergence section of double-deck tunnel on the stability", Journal of the Korean Geosynthetics Society, Vol. 15, No. 2, pp. 45-54. https://doi.org/10.12814/jkgss.2016.15.2.045
- Lee, M.H., Kim, B., Jang, Y.S., Yun, J.N., Park, H.G. (2013), "Behavior and pillar stability of enlarged existing parallel tunnels", Journal of Korean Tunnelling and Underground Space Association, Vol. 15, No. 5, pp. 537-546. https://doi.org/10.9711/KTAJ.2013.15.5.537
- Lee, S.J., Park, S., Lee, J.H., Jin, H.S. (2018), "Numerical analysis study of reinforced method (loop type) at the double-deck tunnel junction", Journal of Korean Tunnelling and Underground Space Association, Vol. 20, No. 5, pp. 823-837. https://doi.org/10.9711/KTAJ.2018.20.5.823
- Matsuda, T., Toyosato, E., Igarashi, M., Nashimoto, Y., Sugiyama, K. (1997), "A design method of a center-drift and center-pillar type twin-bore tunnel", Proceedings of Tunnel Engineering, Vol. 7, pp. 1-6.
- Park, W.J., Jang, N., Kim, K., Choi, C.R. (2018), "A study on the stability analysis for double deck tunnel branch geometry", Journal of Korean Tunnelling and Underground Space Association, Vol. 20, No. 2, pp. 393-404. https://doi.org/10.9711/KTAJ.2018.20.2.393
- Park, Y.J., Choi, J.J. (2015), "A numerical study on the reinforcement method of a pillar using tension bolts at the connecting part between 2-arch tunnels and parallel tunnels", Tunnel and Underground Space, Vol. 25, No. 5, pp. 470-486. https://doi.org/10.7474/TUS.2015.25.5.470
- Peck, R.B. (1969), "Deep excavations and tunneling in soft ground", Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering, Mexico, State-of-the-Art Reports, pp. 225-290.
- Seo, H.J., Lee, K.H., Han, S.I., Lee, I.M. (2012), "A numerical study of pillar reinforcing effect in underground cavern underneath existing structures", Journal of Korean Tunnelling and Underground Space Association, Vol. 14, No. 5, pp. 453-467. https://doi.org/10.9711/KTAJ.2012.14.5.453
- You, K.H., Kim, J.G. (2011), "Evaluation of the influence of pillar width on the stability of a twin tunnel", Journal of Korean Tunnelling and Underground Space Association, Vol. 13, No. 2, pp. 115-131. https://doi.org/10.9711/KTAJ.2011.13.2.115