DOI QR코드

DOI QR Code

Pillar stability in very near-twin tunnels

초근접 병설터널의 필라 안정성 확보

  • Kim, Donggyou (Korea Institute of Civil Engineering and Building Technology) ;
  • Koh, Sungyil (SEOHA Engineering and Construction) ;
  • Lee, Jeongyong (Sambo Engineering Co., Ltd.) ;
  • Lee, Chulhee (Korea Institute of Civil Engineering and Building Technology)
  • Received : 2022.11.01
  • Accepted : 2022.11.24
  • Published : 2022.11.30

Abstract

The objective of this study is to suggest a safe and economical pillar reinforcement method when very near-twin tunnels with a minimum interval of 1 m passes through a soft zone such as weathered soil or weathered rock. A standard cross-sectional view of a two-lane road tunnel was applied to suggest a pillar reinforcement method for the very near-twin tunnels. The thickness of the pillar was 1 m. The ground condition around the tunnel was weathered soil or weathered rock. There were four reinforcement methods for pillar stability evaluation. These were rock bolt reinforcement, pre-stressed steel strand reinforcement, horizontal steel pipe grouting reinforcement, horizontal steel pipe grouting + prestressed steel strand reinforcement. When the ground condition was weathered soil, only the pillar reinforced the horizontal steel pipe grouting + prestressed steel strand did not failed. When the ground condition was weathered rock, there were no failure of the pillar reinforced the horizontal steel pipe grouting or the horizontal steel pipe grouting + prestressed steel strand. It is considered that the horizontal steel pipe grouting reinforcement played a role in increasing the stability of the upper part of the pillar by supporting the upper load applied to the upper part of the pillar.

본 연구의 목적은 2개 터널의 간격이 최소 1 m이내인 초근접 병설터널이 풍화토 또는 풍화암같은 연약대를 통과하는 경우에 대해 안전하며 경제적인 필라보강방법을 제시하는데 있다. 초근접 병설터널의 필라부 보강방법 제시를 위하여 2차로 도로터널 표준단면도를 적용하였다. 필라부의 두께는 1 m로 가정하였다. 터널 통과 주변 지반 조건으로 풍화토 또는 풍화암으로 가정하였다. 필라부 안정성 평가를 위하여 4가지 보강 방법, 록볼트 보강, pre-stress 강연선 보강, 필라부 상부 수평강관 보강 + 그라우팅 보강, 수평 강관 보강 + 그라우팅 + pre-stress 강연선 보강 조건에 대하여 검토하였다. 터널 주변 지반조건이 풍화토인 경우 수평강관 보강 + 그라우팅 + pre-stress 강연선 보강 조건만 필라부에서 파괴가 발생하지 않았다. 터널 주변 지반조건이 풍화암인 경우 수평강관 보강 + 그라우팅 조건과 수평강관 보강 + 그라우팅 + pre-stress 강연선 보강 조건인 경우에서만 필라부에서 파괴가 발생하지 않았다. 수평강관 보강 + 그라우팅은 필라부 상부에 가해지는 상부하중을 지지하여 필라부 상부의 안정성을 증가시키는 역할을 수행한 것으로 판단된다.

Keywords

Acknowledgement

본 논문은 한국건설기술연구원의 수요기반 중소·중견기업 애로기술 해결 지원사업(초근접 병설터널의 필라 보강 및 터널굴착기술 개발)의 지원으로 수행되었습니다. 이에 드립니다.

References

  1. An, Y.K., Kong, S.M., Lee, Y.J. (2014), "Assessment of minimum pillar width and reinforcement of parallel tunnel using numerical analysis and field monitoring", Journal of Korean Tunnelling and Underground Space Association, Vol. 16, No. 3, pp. 299-310. https://doi.org/10.9711/KTAJ.2014.16.3.299
  2. Hoek, E., Brown, E.T. (1980), "Empirical strength criterion for rock masses", Journal of the Geotechnical Engineering Division, Vol. 106, No. 9, pp. 1013-1035. https://doi.org/10.1061/AJGEB6.0001029
  3. Itasca Software Documentation Home page, http://docs.itascacg.com (October 14, 2022).
  4. Jo, Y.S., Kim, Y.H., Hong, J.Y., Kim, D.G., Kim, B.J. (2021), "Analysis of pillar stability according to reinforcement method for very near parallel tunnel", Journal of Korean Tunnelling and Underground Space Association, Vol. 23, No. 2, pp. 119-131. https://doi.org/10.9711/KTAJ.2021.23.2.119
  5. Kim, D.S., Kim, Y.G. (2007), "A study on the stability analysis for asymmetry parallel tunnel with rock pillar", Journal of Korean Tunnelling and Underground Space Association, Vol. 9, No. 4, pp. 387-401.
  6. Kim, J.H., Kim, J.W. (2017), "Stability estimation of the pillar between twin tunnels considering various site conditions", Tunnel and Underground Space, Vol. 27, No. 2, pp. 109-119. https://doi.org/10.7474/TUS.2017.27.2.109
  7. La, Y.S., Kim, B.J. (2016), "Effect of separation between main and divergent tunnels in divergence section of double-deck tunnel on the stability", Journal of the Korean Geosynthetics Society, Vol. 15, No. 2, pp. 45-54. https://doi.org/10.12814/jkgss.2016.15.2.045
  8. Lee, M.H., Kim, B., Jang, Y.S., Yun, J.N., Park, H.G. (2013), "Behavior and pillar stability of enlarged existing parallel tunnels", Journal of Korean Tunnelling and Underground Space Association, Vol. 15, No. 5, pp. 537-546. https://doi.org/10.9711/KTAJ.2013.15.5.537
  9. Lee, S.J., Park, S., Lee, J.H., Jin, H.S. (2018), "Numerical analysis study of reinforced method (loop type) at the double-deck tunnel junction", Journal of Korean Tunnelling and Underground Space Association, Vol. 20, No. 5, pp. 823-837. https://doi.org/10.9711/KTAJ.2018.20.5.823
  10. Matsuda, T., Toyosato, E., Igarashi, M., Nashimoto, Y., Sugiyama, K. (1997), "A design method of a center-drift and center-pillar type twin-bore tunnel", Proceedings of Tunnel Engineering, Vol. 7, pp. 1-6.
  11. Park, W.J., Jang, N., Kim, K., Choi, C.R. (2018), "A study on the stability analysis for double deck tunnel branch geometry", Journal of Korean Tunnelling and Underground Space Association, Vol. 20, No. 2, pp. 393-404. https://doi.org/10.9711/KTAJ.2018.20.2.393
  12. Park, Y.J., Choi, J.J. (2015), "A numerical study on the reinforcement method of a pillar using tension bolts at the connecting part between 2-arch tunnels and parallel tunnels", Tunnel and Underground Space, Vol. 25, No. 5, pp. 470-486. https://doi.org/10.7474/TUS.2015.25.5.470
  13. Peck, R.B. (1969), "Deep excavations and tunneling in soft ground", Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering, Mexico, State-of-the-Art Reports, pp. 225-290.
  14. Seo, H.J., Lee, K.H., Han, S.I., Lee, I.M. (2012), "A numerical study of pillar reinforcing effect in underground cavern underneath existing structures", Journal of Korean Tunnelling and Underground Space Association, Vol. 14, No. 5, pp. 453-467. https://doi.org/10.9711/KTAJ.2012.14.5.453
  15. You, K.H., Kim, J.G. (2011), "Evaluation of the influence of pillar width on the stability of a twin tunnel", Journal of Korean Tunnelling and Underground Space Association, Vol. 13, No. 2, pp. 115-131. https://doi.org/10.9711/KTAJ.2011.13.2.115