건설관리 (Construction Engineering and Management)
- 제23권5호
- /
- Pages.34-41
- /
- 2022
- /
- 1229-7534(pISSN)
A case study on the role of the Engineer to manage delay and disruption events in the Bagratashen bridge according to FIDIC Yellow book 1999
- 발행 : 2022.10.20