과제정보
This work was supported by the National Research Foundation of Korea(NRF) grant funded by the Korea government (MSIT)(No. 2021R1F1A1059478).
참고문헌
- Bae JH, Han SU. Vision-based inspection approach using a projector-camera system for off-site quality control in modular construction: Experimental investigation on operational conditions. Journal of Computing in Civil Engineering. 2021 Sep;35(5):04021012. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000978
- Feigenbaum AV. Total quality control. Havard Business Review. 1956 Dec;34(6):93-101.
- Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK GUIDE). 6st ed. Pennsylvania: PMI ; 2017. 330 p.
- Lee MC, Hwang BS, Park SJ, Kim MG, Kim DC, Shin WS. A research on the development of quality cost management system for power industry. Journal of Korean Society for Quality Management. 2016 Dec;44(4):713-33. https://doi.org/10.7469/JKSQM.2016.44.4.713
- Song SH, Lee HS, Park MS. Activity-oriented quality costs measurement and analysis for construction projects. Journal of the Architectural Institute of Korea Structure & Construction. 2006 Mar;22(3):129-38.
- Jung SK, Park JE, Cha YW, Han SW, Hyun CT. Improvement of construction quality management through analyzing construction work's quality inspection results. Korean Journal of Construction Engineering and Management. 2016 Jan;17(1):110-8. https://doi.org/10.6106/KJCEM.2016.17.1.110
- Hong YK, Song SH, CHae YT, Lee HY. Quality control based on customer need in construction phase. Journal of the Architectural Institute of Korea. 2004 Oct;20(10):175-82.
- Lee CH, Kim BS. Improvement of personnel cost and placement scale of quality manager for construction. KSCE Journal of Civil and Environmental Engineering Research. 2018 Apr;38(2):327-35. https://doi.org/10.12652/KSCE.2018.38.2.0327
- Lee GS, Yun YW, Yang KY. Development of quality management in small and medium construction company. Journal of the Korea Institute of Building Construction. 2005 Sep;5(3):117-24. https://doi.org/10.5345/JKIC.2005.5.3.117
- Kim JS, Kim HJ, Byun EJ, Koo KJ, Hyun CT. A work process model for a quality management in steel frame work. Korean Journal of Construction Engineering and Management.2007 Jun;8(3):150-8.
- Ahn KH, Yoon CS, CHen BG, Kim YS. A Study on the Development of Quality Management System by utilizing the Defects Information - With checklist in focus. Journal of the Architectural Institute of Korea. 2002 Apr;18(4):105-12.
- Kim KT, Ahn BR, Park HG, Kim KJ. Improved estimating guideline for quality management cost. Korean Journal of Construction Engineering and Management. 2002 Sep;3(3):75-83.
- Park HD. Measures to improve construction quality management facilities and placement standards for construction engineers [Internet]. Seoul (Korea): Consstructrion and Economy Research Institute of Korea; 2020 Aug 20. Available from: http://www.cerik.re.kr/report/issue/detail/2407.
- Park HG. Satisfaction level of construction quality management by survey of the field staffs. Korean Journal of Construction Engineering and Management. 2009 Mar;10(2):34-45.
- Jung SY, Yu JH. Analysis of factors affecting job competency of quality management for a construction manager. Korean Journal of Construction Engineering and Management. 2017 Jan;18(1):65-73. https://doi.org/10.6106/KJCEM.2017.18.1.065
- Kim JC. A study on current status of landscaping supervision quality control and improvement measures in apartment house construction. Journal of the Korean Institute of Landscape Architecture. 2021 Feb;49(1):1-18. http://dx.doi.org/10.9715/KILA.2021.49.1.001.
- Lee JH, Park MS, Lee HS, Lee KP, Hyun HS. Application of activity-based costing(abc) for modular building construction indirect costs calculation at the manufacturing stage. Korean Journal of Construction Engineering and Management. 2015 Jul;16(4):139-45. https://doi.org/10.6106/KJCEM.2015.16.4.139