참고문헌
- Cho, T. J., & Choi, J. S. (2011). Case studies: schedule delay factors and delay prevention program for concrete frame works in apartment construction project. Journal of the Korea Institute of Building Construction, 11(1), 9-17. https://doi.org/10.5345/JKIC.2011.02.1.009
- Chu, H. K., & Kim, S. G. (2003). A Development of the Risk Identification Checklist through the Re-establishment of Risk Breakdown Structure of Construction Project. Korean Journal of Construction Engineering and Management, 4(2), 109-117
- Dabirian, S., Abbaspour, S., Khanzadi, M., & Ahmadi, M. (2019). Dynamic modelling of human resource allocation in construction projects. International Journal of Construction Management, 1-10.
- El-Rayes, K., & Jun, D. H. (2009). Optimizing resource leveling in construction projects. Journal of Construction Engineering and Management, 135(11), 1172-1180. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000097
- Getuli, V., Ventura, S. M., Capone, P., & Ciribini, A. L. (2016). A BIM-based construction supply chain framework for monitoring progress and coordination of site activities. Procedia Engineering, 164, 542-549. https://doi.org/10.1016/j.proeng.2016.11.656
- Ham, N. H., Kim, W. G., & Kim, J. J. (2020). BIM based Construction Project Case Analysis for Facility Life Cycle Management from the Perspective of the Client. Journal of KIBIM, 10(3), 12-21. https://doi.org/10.13161/KIBIM.2020.10.3.012
- Ham, N. H., Yuh, O. K., & Ji, K. H. (2018). Empirical Evaluation of BIM Coordinator Performance using Queuing Model in Construction Phase. Journal of KIBIM, 8(3), 31-42. https://doi.org/10.13161/KIBIM.2018.8.3.031
- Ham, N., Moon, S., Kim, J. H., & Kim, J. J. (2020). Optimal BIM staffing in construction projects using a queueing model. Automation in Construction, 113, 103123. https://doi.org/10.1016/j.autcon.2020.103123
- Hegazy, T. (1999). Optimization of resource allocation and leveling using genetic algorithms. Journal of construction engineering and management, 125(3), 167-175. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:3(167)
- Hillier, F. S., & Hillier, M. S. (2014). Introduction to Management Science: A Modeling and Case Studies Approach With Spreadsheets, fiveth ed., McGraw-Hill Education, New York.
- Hillier, F. S., & Liebernman, G. J. (2013). Introduction to Operation Research, ninth ed., McGraw-Hill Education Korea Inc.
- Jeong, J., Seo, J., Park, H., & Choo, S. (2019). A Study on the Implementation and Verification of 4D and 5D Design Support Algorithm Using BIM Attribute Information-Focusing on Process Simulation and Quantity Calculation. Journal of the Korean Architectural Association, 21(4), 15-26.
- Kang, D., Shim, J., Kim, Y., Cho, K., & Hyun, C. (2010). A study on the productivity analysis of superstructure construction for multi-housing projects using construction simulation. Journal of the Architectural Institute of Korea, 26(4), 123-131.
- Kim, H. J., Yoo, M. Y., Kim, J. J., & Choi, C. S. (2017). Performance analysis of BIM labor using case analysis. Journal of KIBIM, 7(3), 31-39. https://doi.org/10.13161/KIBIM.2017.031
- Kim, H., & Kang, L. (2016). Development of Active 5D CAD System for Replaning Progress Schedule According to Change of Project Cost. Korean Journal of Construction Engineering and Management, 17(5), 54-61. https://doi.org/10.6106/KJCEM.2016.17.5.054
- Kim, M. W., Hwang, I. H., & Ock, J. H. (2013). A Study on Modular System Efficiency using 5D BIM Tool. In Proceedings of the Korean Institute of Building Construction Conference (pp. 208-209). The Korean Institute of Building Construction.
- Kim, S. K., Seo, J. M., & Ho, J. K. (2008). A study on the selection and stability of slings and lugs of mobile cranes. Korean Journal of Construction Engineering and Management, 9(6), 164-174.
- Kim, W. G., Ham, N., & Kim, J. J. (2021). Enhanced Subcontractors Allocation for Apartment Construction Project Applying Conceptual 4D Digital Twin Framework. Sustainability, 13(21), 11784 https://doi.org/10.3390/su132111784
- Lee, D. U., & Yun, S. H. (2018). Improvement of Construction Management Process for the Site Manager in Small Scale Building Construction Project. Journal of the Korea Institute of Building Construction, 18(1), 81-87. https://doi.org/10.5345/JKIBC.2018.18.1.081
- Lee, J. C. (2016). Implementation of Customized 4D and 5D System based on BIM. Journal of the Korea Academia-Industrial cooperation Society, 17(8), 55-61. https://doi.org/10.5762/KAIS.2016.17.8.55
- Lee, J. S. (2006). Impacts of pre-construction design quality on construction durations and costs. Journal of the Architectural Institute of Korea Structure & Construction, Architectural Institute of Korea, 22(5), 219-226.
- Lee, J. S., Kwon, N., Ham, N. H., Kim, J. J., & Ahn, Y. H. (2019). BIM-based digital fabrication process for a free-form building project in South Korea. Advances in Civil Engineering, 2019.
- Lee, K., Shin, J., Kwon, S., & Park, J. (2016). A Study of the Establishment of Small and Medium Sized Architectural Design Firm BIM Environment based on Virtual Desktop Infrastructure. Korean Journal of Construction Engineering and Management, 17(5), 78-88. https://doi.org/10.6106/KJCEM.2016.17.5.078
- Lee, M. W., Park, H. P., Shin, E. Y., Kim, K. H., Lee, K. S., & Kang, T. K. (2006). A basic study on the application possibility of the RFID system in re-bar work. Journal of Architectural Institute of Korea, Architectural Institude of Korea, 22(10), 129-136.
- Lee, Y. S. (2003). Development of construction cost model through the analysis of critical work items. Korean Journal of Construction Engineering and Management, 4(4), 212-219.
- Park, M. (2005). Model-based dynamic resource management for construction projects. Automation in construction, 14(5), 585-598. https://doi.org/10.1016/j.autcon.2004.11.001
- Seo, J., & Kim, I. (2009). A Study on the basic directions for introducing and applying building information modeling in the public construction project delivery. Journal of the Architectural Institute of Korea, 25(9), 21-30.
- Shin, J., Choi, J., Kim, I., & Yoon, D. (2016). A study on development of integrated management system for BIM property information. Korean Journal of Computational Design and Engineering, 21(2), 130-142. https://doi.org/10.7315/CADCAM.2016.130
- Son, C. B., & Kim, B. L. (2006). Improvement of the field management work and operation system in the apartment construction. Journal of the Architectural Institute of Korea, 22(6), 165-72.
- Taghaddos, H., Hermann, U., AbouRizk, S., & Mohamed, Y. (2010, August). Simulation-based scheduling of modular construction using multi-agent resource allocation. In 2010 Second International Conference on Advances in System Simulation (pp. 115-120). IEEE.
- Teknomo, K. (2012). Queuing rule of thumb based on M/M/s queuing theory with applications in construction management. Civil Engineering Dimension, 14(3), 139-146.
- Wee, K. S., Noh, S. H., Ham, N. H., & Kim, J. J. (2021). A Study on the Improvement of the Large-scale Apartment Foundation Concrete Pouring Work in South Korea Resource Management using the Queueing Model. Journal of the Architectural Institute of Korea, 37(9), 227-235. https://doi.org/10.5659/JAIK.2021.37.9.227
- Wee, K., Ham, N., & Kim, J. J. (2022). Microscopical Resource Allocation for Large-Scale Apartment Foundation Work Using Queuing Systems. Buildings, 12(2), 89 https://doi.org/10.3390/buildings12020089
- Willis, E. M. (1986). Scheduling construction projects. John Wiley & Sons.
- Youn, C. S., & Kim, Y. B. (2012). Analysis of results and practical application trends for the application of BIM-based quantity calculation (5D) system. Construction Engineering and Management,13(3), 4-7