참고문헌
- NEI, 2017, Industry standardized performance indicators, Nuclear Energy Institute, Washington, DC, Efficiency Bulletin 17-24.
- The JoongAng article, 2022, Consideration of raising the use of nuclear power plants from 70% to 90%.
- IAEA Power Reactor Information System - World statics, 2022, http://pris.iaea.org/pris/.
- KHNP, 2022, "21st Business Report of KHNP, Korea Hydro and Nuclear Power Co. Ltd., Kyeongju-si.
- Business Post article, 2022, Power sales and operation profits of KHNP(Unit: KRW 100 million).
- Maekyung article, 2022, Using 10% less electricity cuts the trade deficit in half.
- The JoongAng article, 2022, Simultaneous rise in electricity and gas rates, self-employed people only sigh.
- Seoul Economic Daily article, 2022, Electricity bill phobia... 50% more next year.
- Data Universe, 2006, IPCC(Intergovernmental Panel on Climate Change) Carbon Emission factor, https://slidesplayer.org/slide/14110741/.
- Maekyung article, 2022, Low-efficiency solar power pushes ahead, electricity bills boomerang.
- The JoongAng article, 2022, A blueprint for renewable energy without a strategy, opening the KEPCO power grid is the answer.
- MOTIE, 2022, The 10th basic plan for electricity supply and demand, Ministry of Trade, Industry and Energy, Sejong-si.
- MOTIE, 2021, 2030 national greenhouse gas reduction goal upward plan, Ministry of Trade, Industry and Energy, Sejong-si.
- Susan G., 2022, U.S. nuclear capacity factors ; A smaller fleet invested in the future, Nuclear News (http://ans.org/nn), pp. 26-33.
- Harazim, M. L. and Ferguson, B. J., 2004, Equipment reliability process based on the Institute of Nuclear Power Operations(INPO) AP-913 in conjunction with a preventative maintenance living, U.S. Department of Energy, Washington, DC.
- Jim C., 2019, Good to Great ; Why some companies make the leap...and others don't, 1st edition 104th printing, Gimmyoungsa, Paju-si.
- KHNP, 2017, KHNP Standard Engineering Model (K-SEM) based on ER Process of INPO, Korea Hydro and Nuclear Power Co. Ltd., Kyeongju-si.
- Nuclear Safety Act and Enforcement Decree of the Nuclear Safety Act, June 2022, Nuclear Safety and Security Commission, Seoul-si.
- William R., Brian S., Jim W., Marc D., Tim C., Richard C., Tom M., Mark S., Roger M., Frank M. and David N., 2014, No Undue Risk ; Regulating the safety of operating nuclear power plants, U.S. Nuclear Regulatory Commission, Washington, DC, NUREC/BR-0518(https://www.nrc.gov/docs/ML1418/ML14181A493.pdf).
- Byun, C. S., Kim, H. J., Na, J. H., Kim, D. H. and Yang, C. K., 2017, A study on trend analysis of NPP re-operation safety management process and optimization plan for domestic application, Korea Hydro and Nuclear Power Co. Ltd., Daejeon-si.
- USNRC, 2006 and 2014, Operating reactor assessment program and Reactor oversight process, U.S. Nuclear Regulatory Commission, Washington, DC, IMC-0350 and NUREC/BR-0508.
- USNRC, 2020, Integrated risk-informed decision-making process for emergent issues, U.S. Nuclear Regulatory Commission, Washington, DC, LIC-504.
- INPO, 2019, Staying on Top ; Advancing a culture of continuous improvement, International Nuclear Power Operations, Atalanta, 19-003.
- KHNP, 2022, Basic rules for maintenance engineers and Standard guidelines for operator behavior. Korea Hydro and Nuclear Power Co. Ltd., Kyeongju-si, SG-9680-02 and SG-3035-01.