과제정보
이 논문은 삼성디스플레이(주) 지원을 받아 수행된 연구 결과입니다
참고문헌
- Choi, J.W., Mun, J.S., Kim, J.A., Won, J.I., and Park, H.C. (2000). "Health Hazardous Substances in Construction Work in Korea." Journal of Korean Society of Occupational and Environmental Hygiene, 10(1), pp. 74-92.
- Construction Safety Management Integrated Information (2022). Hazard Profile.
- Go, S.S., Kim, J.U., and Lee, J.B. (2004). "A Study on the Improvement Counterplan of Construction Safety Management According to the Construction Magnitude." Journal of the Korean Institute of Industrial Safety, 19(1), pp. 108-116.
- Goh, J.H., Lee, D.Y., and Park, C.S. (2016). "A study on BIM aided automated code checking for construction safety management." Proceedings of KICEM Annual Conference, KICEM, pp. 145-146.
- Hassan, M., Abdollah, A., Mohammad, H.S., and Rudi, S. (2016). "Construction safety risk drivers: A BIM approach." Safety Science, 82, pp. 445-455. https://doi.org/10.1016/j.ssci.2015.11.002
- Ju, H.W. (2017). "BIM safety management system using risk assesment." MS thesis, Sungkyunkwan University, Seoul.
- Kim, H.S., Lee, H.S., Park, M.S., Lee, K.P., and Pyeon, J.H. (2010). "Hazardous Area Identification Model using Automated Data Collection(ADC) based on BIM." Korean Journal of Construction Engineering and Management, KICEM, 11(6), pp. 14-23. https://doi.org/10.6106/KJCEM.2010.11.6.14
- Kim, I.H., Lee, Y.H., and Choi, J.S. (2019). "BIM-based Risk Assessment of Structural Occurrence Disaster for Construction Site Safety Management." Korean Journal of Computational Design and Engineering, 24(2), pp. 144-151. https://doi.org/10.7315/cde.2019.144
- Kim, T.H., Lee, D.H., Bae, S.I., Hong, Y.K., and Park, Z.S. (2013) "Proposal of field applied safety control process using BIM." Journal of the Regional Association of Architectural Institute of Korea, 15(5), pp. 243-249.
- Kim, Y.J., Kim, B.J., Kim, I.C., Lee, M.C., Choi, J.K., and Chin. S.Y. (2017). "Construction Safety Management using 4D BIM Tool." KIBIM Annual Conference, 7(1), pp. 101-102
- Korea Occupational Safety and Health Agency (2022). 2020 Industrial accident status analysis.
- Kwon, O.C., Cho, J.W., and Jo, C.W. (2013). "BIM Quality Assurance for DFS in Design Phase." Transactions of the Society of CAD/CAM Engineers, 18(5), pp. 348-358. https://doi.org/10.7315/CADCAM.2013.348
- Lee, C.J., and Ham, S.I. (2020). "Design Guide Systems of Safety Handrail based on DfS and BIM for Preventing of Fall Accidents." Journal of the Architectural Institute of Korea, 36(10), pp. 235-241. https://doi.org/10.5659/JAIK.2020.36.10.235
- Lee, H.S., Kim, H.S., Lee, K.P., Lee, S.B., and Park, M.S. (2009). "Construction Risk Assessment Methodology Using Site Risk Influence Factors." Korean Journal of Construction Engineering and Management, KICEM, 10(6), pp. 117-126.
- Meng, L., Hongliang, Y., Hongyu, J., and Ping, L. (2018). "Methodologies of safety risk control for China's metro construction based on BIM." Safety Science, 110(A), pp. 418-426. https://doi.org/10.1016/j.ssci.2018.03.026
- Park, H.P., and Han, J.G. (2018). "Development of Safety Risk Assessment Index and Risk Prediction System based on process in Construction Sites." Korea Institute of Construction Technology, KICT 2018-076.
- Sijie, Z., Kristiina, S., Markku, K., Ilkka, R., Charles, M.E., and Jochen, T. (2015). "BIM-based fall hazard identification and prevention in construction safety planning." Safety Science, 72, pp. 31-45. https://doi.org/10.1016/j.ssci.2014.08.001
- Son, C.B., Lee, D.C., and An, T.S. (2004). "A Study on the Subcontract Status and Its Development Directions of Domestic Construction Project." Journal of the Architectural Institute of Korea, 20(6), pp. 115-124.
- Song, J.T., and Lee, J.W. (2019). Risk Assessment and Analysis Techniques. SUNG AN DANG, INC. pp. 131-382.
- Yang, Z., Stephen, W.J., and Arto, K. (2017). "A review of risk management through BIM and BIM-related technologies." Safety Science, 97, pp. 88-98. https://doi.org/10.1016/j.ssci.2015.12.027