References
- B. Bahu, L. Bironneau, V. Hovelaque(2019), "Comprehension du DDMRP et de son adoption: Premiers elements empiriques." Logistique & Management, 27(1):20-32. https://doi.org/10.1080/12507970.2018.1547130
- J. Clement, A. Coldrick, J. Sari(1992), Manufacturing data structures; Building foundations for excellence with bills of materials and. John Wiley & Sons, Inc. Oliver Wight Publications.
- S. J. Hwang, M. H. Lee, H. I. Hwang(2020), Structural Tasks for the automobile industry: A general book of the parts industry. Research Book, pp. 1-227.
- D. M. Jang, M. S. Shin(2020), "Development of distributed MRP system for production planning and operation in Korean OEM/ODM cosmetics manufacturing company." Korean Society of Industrial and Systems Engineering, 43(4):133-141. https://doi.org/10.11627/jkise.2020.43.4.133
- G. S. Jang, J. D. Kim, C. K. Park(2005), "Implementation of EXCEL-based BOM management system for automobile part's companies." Korean Society of Industrial and Systems Engineering, 28(4):28-40.
- K. D. Kim, J. H. Choi, D. Y. Kim(2002), "Application of ERP and MES in case of automobile manufacturing company." Journal of Industrial Kangwon Natl. Korea, 22(B):51-60.
- C. J. Lee(2020), "A safety stock model for demand-driven inventory replenishment." Doctoral dissertation, University of Ajou.
- K. B. Lee(2017), "The problems of industry 4.0 and MRP." Korean Institute of Industrial Engineers, 2017(4):2253-2270.
- S. W. Lee, J. K. Lee(2010), "Design BOM, production BOM, and process BOM structure suitable for the automotive parts industry." The Korean Society of Automotive Engineers, 2010(5):1078-1082.
- H. Mather(1987), Bills of materials. Dow Jones-Irwin.
- T. S. Mun, S. S. Kim(2005), System implementation: Implementation of the precision one planning system for production-production-production-practice of national enterprises. Korea Association of Information Systems, pp. 389-397.
- H. B. Na(2014), "Multi-level job scheduling in a flexible discrete-part production environment." Doctoral dissertation, University of Seoul.
- J. W. Park, J. G. Gil(2021), "An empirical study on the effects of partnership factors in the supply chain of the automobile parts industry on SCM performance: Through partnership behavior factors." Journal of the Korean Business Association, 34(5):775-806.
- Naver Knowledge Encyclopedia, https://terms.naver.com/entry.naver?docId=1179740&cid=40942&categoryId=31912
- Wikipedia, https://ko.wikipedia.org/wiki/ADO
- Naver Knowledge Encyclopedia, https://terms.naver.com/entry.naver?docId=2274732&cid=42171&categoryId=51120