References
- Ahn T. H. and Erenguc S. S. 1998. The Resource Constrained Project Scheduling Problem with Multiple Crashable Modes: A Heuristic Procedure. European Journal of Operation Research 107(2):250-259. https://doi.org/10.1016/S0377-2217(97)00331-7
- Ahn T. H. and Min T. K. 2008. Project Portfolio Evaluation Problem : Based on the Multi-attribute Evaluation Using Simulation. Journal of Social Science 13(1):233-253.
- Ballestin F., Valls V., and Quintanilla S. 2008. Pre-emption in Resource-constrained Project Scheduling. European Journal of Operational Research 189(3):1136-1152. https://doi.org/10.1016/j.ejor.2006.07.052
- Blazewicz J. 1978. Complexity of computer scheduling algorithms under resource constraints. First meeting AFCETSMF on Applied Mathematics 16(6):169-178.
- Carolin K. and Helber S. 2015. Scheduling resource-constrained projects with a flexible project structure. European Journal of Operational Research 246(2):379-391. https://doi.org/10.1016/j.ejor.2015.05.003
- Cho S. W., Lee H. S., and Kang J. Y. 2022. A Study on the Common RPN Model of Failure Mode Evaluation Analysis(FMEA) and its Application for Risk Factor Evaluation. Journal of Korean Society for Quality Management 50(1):125-138. https://doi.org/10.7469/JKSQM.2022.50.1.125
- Chung I. H. 2019. Particle Swarm Optimization for Redundancy Allocation of Multi-level System considering Alternative Units. Journal of Korean Society for Quality Management 47(4):701-711. https://doi.org/10.7469/JKSQM.2019.47.4.701
- Debels D. and Vanhoucke M. 2007. A decomposition-based genetic algorithm for the resource-constrained project-scheduling problem. Operations Research 55(3):457-469. https://doi.org/10.1287/opre.1060.0358
- Duggan J., Byrne J., and Lyons G. J. 2004. A task allocation optimizer for software construction. IEEE Software 21(3):76-82. https://doi.org/10.1109/MS.2004.1293077
- Elham N. A., Najafi A. A., Roghanian E., and Mazinani M. 2014. A Multi-Objective Imperialist Competitive Algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations. Computers & Operations Research 50(1):80-96. https://doi.org/10.1016/j.cor.2014.04.003
- Hillier F. S. and Lieberman G. J. 2015. Operations Research: An Introduction, 10th Edition. NY: McGraw-Hill.
- Icmeli-Tukel O. 1992. Scheduling Problems in Project Management. Ph.D. Dissertation, University of Florida, Gainesville.
- Icmeli-Tukel O. and Walter O. T. 1997. Ensuring quality in resource constrained project scheduling. European Journal of Operational Research 103(3):483-496. https://doi.org/10.1016/S0377-2217(96)00305-0
- Kelley J. E. 1961. Critical Path Planning and Scheduling: Mathematical Basis. Operations Research 9(3):42-53. https://doi.org/10.1287/opre.9.3.296
- Kerzner H. 2013. PROJECT MANAGEMENT: A Systems Approach to Planning, Scheduling, and Controlling -11th edition. New York: John Wiley and Sons Inc.
- Kim G. S. 2016. A Study on the Tradeoffs of Quality, Time, and Cost for Activities in Resource Constrained Project Scheduling Problem. Ph.D. Dissertation, University of Soongsil.
- Kim S.Y., Yun W.Y., and Kim H.G. 2007. Reestablishment of RPN Evaluation Method in FMEA Procedure for Motors in Household Appliances. Journal of Korean Society for Quality Management 35(1):1-9.
- Kolisch R., Sprecher A., and Drexl A. 1995. Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science 41(10):1693-1703. https://doi.org/10.1287/mnsc.41.10.1693
- Lee S. W. 2011. Efficient Genetic Algorithm for Resource Constrained Project Scheduling Problem. JOURNAL OF THE KOREA CONTENTS ASSOCIATION 11(6):59-66. https://doi.org/10.5392/JKCA.2011.11.6.059
- Madjid T., Abtahi A. R., and Kaveh K. D. 2014. A new multi-objective multi-mode model for solving preemptive time-cost-quality trade-off project scheduling problems. Expert Systems with Applications 41(4):1830-1846. https://doi.org/10.1016/j.eswa.2013.08.081
- Masanori H., and Suzuki A. 2010. A Solution Method for Manpower Scheduling Problems by RCPSP/τ. The Ninth International Symposium on Operations Research and Its Applications 19(23):249-261.
- Robinson D. R. 1975. A Dynamic Programming Solution to Cost Time Trade-off for CPM. Management Science 22(2):158-166. https://doi.org/10.1287/mnsc.22.2.158
- Ryu M. A. 2017. Resource Constrained Multi-phase Project Scheduling Problem. Ph.D. Dissertation, University of Soongsil.
- Sprecher A. 2002. Network Decomposition Techniques for Resource Constrained Project Scheduling. Journal of the Operational Research Society 53(4):405-414. https://doi.org/10.1057/palgrave.jors.2601308
- Taha H. A. 2016. Operations Research: An Introduction, 10th Edition. Greenville, South Carolina: Pearson Education.
- Tormos P. and Lova A. 2003. An Efficient Multi-pass Heuristic for Project Scheduling with Constrained Resources. International Journal of Production Research 41(5):1071-1086. https://doi.org/10.1080/0020754021000033904
- Vikram T., Patterson J. H., and Mabert V. A. 2009. Scheduling projects with heterogeneous resources to meet time and quality objectives. European Journal of Operational Research 193(3):780-790. https://doi.org/10.1016/j.ejor.2007.11.005
- Yim D. S. 2011. Performance Analysis of Local Optimization Algorithms in Resource-Constrained Project Scheduling Problem. Journal of the Korean Institute of Industrial Engineers 37(4):408-414. https://doi.org/10.7232/JKIIE.2011.37.4.408
- Yoon C. S. and Jo D. H. 2022. A Study on the Effects of Risk Perception and Opportunism on the Project Performance. Journal of Korean Society for Quality Management 50(1):63-76. https://doi.org/10.7469/JKSQM.2022.50.1.63
- Yu Y. S., Jo D. H., and Choi H. S. 2019. The Effect of Conflict on Collaboration and Performance in Nuclear Power Plant Construction Projects. Journal of the Korean Society for Quality Management 47(3):553-569. https://doi.org/10.7469/JKSQM.2019.47.3.553