Acknowledgement
This study is a part of the research result conducted with research fund supporting in 2022 of Ministry of Science and ICT. The project code: 20220149-001
References
- ISO 9001:2015 Quality management systems-Requirements, [online] Available: https://www.iso.org/standard/62085.html.
- Vrijling, J. K., W. Van Hengel, and R. J. Houben(1998)."Acceptable risk as a basis for design." Reliability Engineering & System Safety 59.1 : 141-150. https://doi.org/10.1016/S0951-8320(97)00135-X
- Hanea, Daniela, and Ben Ale(2009)."Risk of human fatality in building fires: A decision tool using Bayesian networks." Fire Safety Journal 44.5 : 704-710. https://doi.org/10.1016/j.firesaf.2009.01.006
- Khan, Mustesin Ali, et al(2021)."Framework for fire risk assessment of bridges." Structures. Vol. 33. Elsevier.
- Brown, Gavin D., et al(2022). "Fire safety protection motivation and preparedness in Irish apartments: A Post-Grenfell analysis." Safety Science 148 : 105630. https://doi.org/10.1016/j.ssci.2021.105630
- The Enforcement Decree of the Building Act
- Rules on the Evacuation Fire Protection Structure of Buildings
- Lamont, Susan, and Sigurjon Ingolfsson(2018). "High Rise Buildings with Combustible Exterior Wall Assemblies: Fire Risk Assessment Tool." NFPA Research, February.
- FEMA. "Building performance: Hurricane Andrew in Florida." (1992).
- BRE Gkibak Client Report: BS 8414-1:2015 + A1:2017 Test referred to as DCLG test 7, Report No. B137611-1037 (DCLG test 7) Issue: 2.0
- "Guide to Exterior Insulation and Finish System Construction." 2000.
- RUME, K., and J. VIEHWEG(2018). "Assessing Fire Risks in Photovoltaic Systems and Developing Safety Concepts for Risk Minimization. Bundesministerium fur Wirtschaft und Technologie, TuV Rheinland, Fraunhofer."
- IBC. International Building Code. Washington, DC: International Code Council.
- Livkiss, Karlis, et al(2018). "Flame heights and heat transfer in facade system ventilation cavities." Fire technology 54.3 : 689-713. https://doi.org/10.1007/s10694-018-0706-2