References
- Au-Yong, C. P., Azmi, N. F., and Mahassan, N. A. (2018). Maintenance of lift systems affecting resident satisfaction in low-cost high-rise residential buildings. Journal of Facilities Management, 16(1), 17-25 https://doi.org/10.1108/JFM-04-2017-0015
- Belmonte, M. and Trabucco, D. (2021). "The Ropeless Elevator: New Transportation System for High-rise Buildings (and Beyond). International Journal of High-Rise Buildings, 10(1), 55-62
- Cho, C. Y., Kwon, S. W., Shin, T. H. et al. (2011), A development of next generation intelligent liftcar toolkit for vertical material movement. Automation in Construction, 20(1), 14-27 https://doi.org/10.1016/j.autcon.2010.07.008
- Cho, C. Y., Shin, Y. S., Won, S. K. et al. (2011). An Algorithm for Hoisting Time Calculation in Super-tall Building Construction. Korean Journal of Construction Engineering and Management, 12(6), 120-129 https://doi.org/10.6106/KJCEM.2011.12.6.120
- Cho, C. Y., Cho, M. Y., Shin, Y. S. et al. (2012). Prediction Model for Hoisting Times of Tower Crane using DiscreteEvent Simulation in High-rise Building Construction. Journal of the Architectural Institute of Korea, 28(1), 151-158
- Ha, S. B., Park, M. S., Lee, H. S. et al. (2010). An Efficient Lifting Operation using Vertical Zoning of Temporary Lift-Car in the High-Rise Building Construction. The Architectural Institute of Korea, 30(1), 325-326
- Hwang, D. W., Kwon, O. K., and Choi, Y. K. (2017). Lifting Work Process Optimization Method in High-rise Building Construction Through Improvement of CYCLONE Modeling Method. Korean Journal of Construction Engineering and Management, 18(2), 58-70. https://doi.org/10.6106/KJCEM.2017.18.2.058
- Kim, N. G. and Kim, Y. S. (2013). An Analysis of the Critical Risk Factors in Failure Cases of Lifting Equipment Plans in High-rise Construction Project. Korean Journal of Construction Engineering and Management, 14(4), 73-83 https://doi.org/10.6106/KJCEM.2013.14.4.073
- Kwon, W. B., Lee, D. M., Cho, H. H. et al. (2019). Application of Deep Learning for Automated Operation of Construction Lift in High-rise Building Construction. Journal of the Architectural Institute of Korea, 39(1), 412-413
- Lan, C. and Cheuk, M. M. (2021). Integrated impacts of building height and upstream building on pedestrian comfort around ideal lift-up buildings in a weak wind environment. Building and Environment, 200, 107963
- Lee, M. D., Won, M. K., Lee, U. K. el al. (2014). Integrated lifting model of planning and operation for finishing materials in building construction. Journal of the Architectural Institute of Korea Structure & Construction, 30(5), 125-133 https://doi.org/10.5659/JAIK_SC.2014.30.5.125
- Moon, J. Y., Park, M. S., Lee, H. S. et al. (2014). Study on Optimization for Construction Vertical Lifting with Transfer Operation for Super High-rise Buildings. Korean Journal of Construction Engineering and Management, 15(6), 53-62 https://doi.org/10.6106/KJCEM.2014.15.6.053
- Shin, Y. S. (2011). Interactive lift operation planning system for finishing work in tall building construction. Korea University Doctoral thesis
- Soh, J. Y., Bae, J. H., Han, C. H. et al. (2015). A Study on Optimal Inspection Interval for the Major Components of Construction Lift. Korean Journal of Construction Engineering and Management, 16(3), 68-77 https://doi.org/10.6106/KJCEM.2015.16.3.068
- Won (2011). Interactive Decision-making Model of Lift Operation Planning in Tall Building Projects. Kyung Hee University Doctral thesis
- Zhang, P., Harris, F. C., Olomolaiye, P. O. et al. (2011). Location optimization for a group of tower cranes. Journal of construction Engineering and Management, 125(2), 115-122
- Zhiqian, Z. and Wei, P. (2020). Lift planning and optimization in construction: A thirty-year review. Automation in Construction, 118, 103271