Acknowledgement
본 연구는 2022년도 광주대학교 대학 연구비의 지원을 받아 수행되었음.
References
- Ahn, S. (2015). "A Case Study of the Risk Identification in Construction Project." Korean Journal of Construction Engineering and Management, KICEM, 16(1), pp. 15-23. https://doi.org/10.6106/KJCEM.2015.16.1.015
- California (2012). Project Risk Management Handbook, California Department of Transportation.
- Cha, H.S., and Shin, K.Y. (2011). "Predicting Project Cost Performance Level by Assessing Risk Factors of Building Construction in South Korea." Journal of Asian Architecture and Building Engineering, 10(2), pp. 437-444. https://doi.org/10.3130/jaabe.10.437
- Han, S.H., Park, H.K., Yeom, S.M., Chae, M.J., and Kim, U.Y. (2014). "Risk-Integrated Cash Forecasting for Overseas Construction Projects." KSCE Journal of Civil Engineering, 18(4), pp. 875-886. https://doi.org/10.1007/s12205-014-0464-8
- Kang, H.W., and Kim, Y.S. (2018). "A Model for Risk Cost and Bidding Price Prediction Based on Risk Information in Plant Construction Projects." KSCE Journal of Civil Engineering, 22(11), pp. 4215-4229. https://doi.org/10.1007/s12205-018-0587-4
- Kang, H.W., and Kim, Y.S. (2016). "Analysis of the Probabilistic Cost Variation Ranges According to the Effect of Core Quantitative Risk Factors for an Overseas Plant Project." KSCE Journal of Civil Engineering, 20(2), pp. 509-518. https://doi.org/10.1007/s12205-015-0497-7
- Kang, H.W., Lee, W.B., Kim, M.J., Kim, Y.S. (2020). "A Case Study on the Risk Impact and Loss Cost of Temporary Aircraft Runway Construction." Korean Journal of Construction Engineering and Management, KICEM, 21(1), pp. 32-39. https://doi.org/10.6106/KJCEM.2020.21.1.032
- Kim, Y.S., and Kang, H.W. (2017). "Development of a Model for Risk and Cost Analysis in Overseas Plant Construction Projects." KSCE Journal of Civil Engineering, 20(5), pp. 1549-1562.
- Kim, J.H. (2010). "Plans for Reducing Risk through a Case Study of Risk Factors at a Construction Site." Journal of the Korea Institute of Building Construction, 10(4), pp. 83-93. https://doi.org/10.5345/JKIC.2010.10.4.083
- Kim, K.K. (2007). "A Study for Major Cost Increaseing Factors in Skyscraper Construction using FMEA." Journal of Architectural Institute of Korea, 23(5), pp. 171-178.
- Lee, M.J. (2016). "The Case Study on Performance Measurement Weighting for Efficient Value Engineering Study of Sewage Treatment Facility." Korea Journal of Construction Engineering and Management, 17(3), pp. 125-133. https://doi.org/10.6106/KJCEM.2016.17.3.125
- Ovidiu, C. (2014). Risk Management for Design and Construction, Wiley.
- Park, Y.M., Kim, S.Y., Kim, K.Y. (2005). "An Analysis of Risk Factors of a Construction Project Through Execution Plan." Korean Journal of Construction Engineering and Management, KICEM, 6(2), pp. 139-149.
- Sousa, V. (2014). "Risk-Informed Time-Cost Relationship Models for Sanitation Projects." ASCE Journal of Construction and Engineering Management, 140(5).
- Texas. (2010). Risk-Based Construction Cost Estimating Reference Guide, Texas Department of Transportation.