DOI QR코드

DOI QR Code

Characteristics of defect on segmental lining of TBM tunnel in operational subway

운용중인 국내 지하철 TBM터널의 세그먼트라이닝 결함특성 분석

  • 추진호 (국토안전관리원 터널실) ;
  • 이동훈 (국토안전관리원 터널실) ;
  • 노은철 (국토안전관리원 터널실)
  • Received : 2021.12.18
  • Accepted : 2022.01.12
  • Published : 2022.01.31

Abstract

The precise inspection for safety and diagnosis (PISD) of tunnel has been conducted by the special act on safety control of public structures. However, the present assessment for the segmental lining of TBM tunnel has limitation such as: NDTs for integrity, segmental configuration for field inspection, and consideration for jacking system. Even if the number of TBM tunnel is less than 1% of enrolled facility in FMS, more attention to maintenance should be necessary due to its usage such as multi-use facility and national important facility. Compared to NATM tunnel, excavated by drilling and blasting and then installed lining by cast-in-place within 6~12 m, TBM tunnel is cut out ground by disk and cutter-bit and then assembled 7 pieces of precast segment, 1.2~1.4 m wide. Different features of design, construction, and maintenance should be considered to be more exact evaluation of TBM tunnel. The characteristics of defect is categorized and analyzed with 11 operational TBM tunnels in domestic subway. To be more comprehend various particular defects, foreign studies have been also adapted. Crack and leakage are categorized in 7 patterns. Breakage/spalling and corrosion are also grouped into 3 patterns. Patterned defects or damages are fed back in design, construction, and are useful guidelines for maintenance stage in future.

시설물안전법에 의한 터널의 정밀안전진단은 세부지침에 의거하여 수행되나, 현재의 TBM터널 세그먼트라이닝 평가체계에는 유압잭 사용의 장비특성, 세그먼트를 고려한 외관조사, 건전도를 위한 비파괴 시험방법 등의 결함특성을 반영하지 못하는 한계를 지닌다. 시설물정보관리시스템에 등재된 TBM터널은 1% 미만이지만 다중이용시설 및 국가 중요시설의 사용을 감안하여 많은 유지관리가 필요하다. 발파로 굴착하며 터널 축을 따라 6~12 m의 라이닝을 연속하여 현장 타설하는 NATM터널과 비교하여 TBM터널은 디스크커터와 커터비트가 달린 원형의 회전판을 회전하여 굴진하며 공장 제작된 폭 1.2~1.4 m 세그먼트를 조립하여 구조체를 형성한다. TBM터널에 대한 정확한 평가를 위해서는 설계, 시공, 운용단계의 특징이 고려되어야 한다. 11개 구간에서 운용중인 국내 지하철 TBM터널의 결함특성을 유형별로 분석하였으며 TBM터널 세그먼트라이닝의 공통된 결함 특성 이외에 특수한 결함에 대해서는 해외 논문 연구내용을 발췌하여 이해를 돕고자 하였다. 균열과 누수는 위치 및 형상에 따라 7가지 유형으로 구분하였으며, 박락 및 파손과 부식에 대해서는 3가지 유형으로 구분하여 분석하였다. 향후 설계, 시공의 피드백과 유지관리에 도움이 되고자 한다.

Keywords

Acknowledgement

현장조사 및 사진을 공유해주신 터널실 직원 모두에게 감사의 마음을 전합니다.

References

  1. Aggelis, D.G., Shiotani, T., Kasai, K. (2008), "Evaluation of grouting in tunnel lining using impact-echo", Tunnelling and Underground Space Technology, Vol. 23, No. 6, pp. 629-637. https://doi.org/10.1016/j.tust.2007.12.001
  2. Arnau, O. (2012), Structural response of precast concrete segmental tunnel linings, Doctoral Thesis, Ph.D., Universitat Politecnica de Catalunya, pp. 1-125.
  3. Bernhard, M., Martin, H., Ulrich, M., Gerhard, W. (2012), Mechanized Shield Tunnelling, Wilhelm Ernst & Sohn, Berlin, Germany, pp. 1-461.
  4. Cavalro, S.H.P., Blom, C.B.M., Walraven, J.C., Aguado, A. (2011), "Structural analysis of contact deficiencies in segmented lining", Tunnelling and Underground Space Technology, Vol. 26, No. 6, pp.734-749. https://doi.org/10.1016/j.tust.2011.05.004
  5. Chen, J.S., Mo, H.H. (2009), "Numerical study on crack problems in segments of shield tunnel using finite element method", Tunnelling and Underground Space Technology, Vol. 24, No. 1, pp. 91-102. https://doi.org/10.1016/j.tust.2008.05.007
  6. Choo, J.H., Lee, I.M. (2019), "Analysis and cause of defects in reinforced cement concrete lining on NATM tunnel based on the Precise Inspection for Safety and Diagnosis - Part I", Journal of Korean Tunnelling and Underground Space Association, Vol. 21, No. 1, pp. 1-29. https://doi.org/10.9711/KTAJ.2019.21.1.001
  7. Choo, J.H., Yoo, C.K., Oh, Y., C., Lee, I.M. (2019a), "A re-appraisal of scoring items in state assessment of NATM tunnel considering influencing factors causing longitudinal cracks", Journal of Korean Tunnelling and Underground Space Association, Vol. 21, No. 4, pp. 479-499. https://doi.org/10.9711/KTAJ.2019.21.4.479
  8. Choo, J.H., Yoo, C.K., Oh, Y.C., Lee, I.M. (2019b), "Assessment of NATM tunnel lining thickness and its behind state utilizing GPR survey", Journal of Korean Tunnelling and Underground Space Association, Vol. 21, No. 5, pp. 717-733. https://doi.org/10.9711/KTAJ.2019.21.5.717
  9. DAUB (2013), Recommendations for the design, production and installation of segmental rings, pp. 1-46.
  10. Davis, A.G., Lim, M.K., Petersen, C.G. (2005) "Rapid and economical evaluation of concrete tunnel linings with impulse response and impulse radar non-destructive methods", NDT & E International, Vol. 38, No. 3, pp. 181-186. https://doi.org/10.1016/j.ndteint.2004.03.011
  11. Iasiello, C., Caldentey, A.P., Torralbo, J.C.G., Luis, M.T., Molina, R.R. (2018), "Critique of TBM lining design defects: Origin, Characterization, Measurement, and the role of the installation phase", Journal of Performance of Constructed Facilities, Vol. 32, No. 6, pp. 1-15.
  12. KALIS (2021), The precise inspection for safety and diagnosis of tunnel, pp. 1-46.
  13. Kolic, D., Mayerhofer, A. (2009), "Segmental lining tolerances and imperfections", Proceedings of the ITA WTC 2009 Symposium, Budapest, May, pp. 8-15.
  14. Kravitz, B. (2018), Non-destructive evaluation of two-component backfill grouting behind segmental tunnel linings, Master, Colorado School of Mines, pp. 1-106.
  15. Lorenzo, S.G. (2020) "The role of temporary spear blots in gasketed longitudinal joints of concrete segmental linings", Tunnelling and Underground Space Technology, No. 105, pp. 1-23.
  16. Mohtadinia, M., Ahmadi, M.H., Fasaghandis, M.M., Dibavar, B.H., Davarpanah, S.M. (2020), "Statistical and numerical study of chipping and cracking in segmental lining", Periodica Polytechnica Civil Engineering, Vol. 64, No. 3, pp. 869-886.
  17. Shayanfar, M.A., Mahyar, P., Jafari, A., Mohtadinia, M. (2017), "Classification of precast concrete segments damages during production and transportation in mechanized shield tunnels of Iran", Civil Engineering Journal, Vol. 3, No. 6, pp. 412-426. https://doi.org/10.28991/cej-2017-00000101
  18. Sugimoto, M. (2006), "Causes of shield segment damages during construction", Proceedings of the International Symposium on Underground Excavation and Tunneling, Bangkok, Thailand, pp. 67-74.
  19. Wang, M., Dong, Y., Yu, L., Fang, L., Wang, X., Liu, D. (2019) "Experimental and numerical researches of precast segment under radial dislocation conditions", Tunnelling and Underground Space Technology, No. 92, pp. 1-16.
  20. Wu, H.N., Shen, S.L., Chen, R.P., Zhou, A. (2020), "Three-dimensional numerical modeling on localized leakage in segmental lining of shield tunnels", Computers and Geotechnics, No. 122, pp. 1-12.
  21. Yang, Y., Zhou, B., Xie, X., Liu, C. (2018), "Characteristics and causes of cracking and damage of shield tunnel segmental lining in construction stage - a case study in Shanghai soft soil", European Journal of Environmental and Civil Engineering, Vol. 22, No. sup1, pp. s213-s227. https://doi.org/10.1080/19648189.2017.1356243
  22. Zhao, Y., Chu, C., Yi, Y. (2016), "Study on an engineering measure to improve internal explosion resistance capacity of segmental tunnel lining structures", Journal of Vibroengineering, Vol. 18, No. 5, pp. 2997-3009. https://doi.org/10.21595/jve.2016.16730