Abstract
Recently, as the number of years of operation has increased for more than 30 years, interest in evaluating the remaining life of major power facilities such as transformers and ultra-high voltage cables is increasing. In particular, the risk of failure is increasing because the underground transmission XLPE cable has been built since 1980 and has been operating in excess of 30 years of design life or close proximity. Therefore, it is necessary to develop an algorithm to evaluate the residual life of the XLPE cable considering the load to determine the risk of failure. Since load data is large amount of data, it is necessary to make the variable load information equivalent to the time unit first in order to calculate the remaining life of the system quickly. In overseas literature, transformers are reported to be standardized for variable load equivalent conversion formulas, but they have not been reported for ultra-high voltage cables. Therefore, in this paper, whether the equivalent conversion formula of a transformer can be applied to XLPE cables was reviewed through accelerated degradation tests under equivalent and variable temperature conditions, and considerations were studied when evaluating the remaining operating life of XLPE cables based on the experimental results.