Acknowledgement
This work was supported by the Nuclear Safety Research Program through the Korea Foundation Of Nuclear Safety (KoFONS) using the financial resource granted by the Nuclear Safety and Security Commission (NSSC) of the Republic of Korea. (No 1705001)
References
- M. K. Ravindra and C. R. Sundararajan, "Seismic Risk Assessment, Probabilistic Structural Mechanics Handbook-Theory and Industrial Applications", Chapter 19, Springer Science+Business Media Dordrecht, 1995.
- Kennedy, R.P., Cornell, C.A., Campbell, R.D., Kaplan, S., Perla, H.F., "Probabilistic Seismic Safety Study of an Existing Nuclear Power Plant", Nucl. Eng. & Des., 59(2), pp.315-338, 1980 . https://doi.org/10.1016/0029-5493(80)90203-4
- S. K. Park and W. S. Jung, "A New Quantification Method for Multi-Unit Probabilistic Safety Assessment", J. Korean Soc. Saf., Vol. 35, No. 1, pp. 97-106, 2020. https://doi.org/10.14346/JKOSOS.2020.35.1.97
- Electric Power Research Institute, "Seismic Probabilistic Risk Assessment Implementation Guide", EPRI 1002989, 2003.
- American Society of Mechanical Engineers/American Nuclear Society (ASME/ANS), "Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications Standard for Probabilistic Risk Assessment for Nuclear Power Plant Applications", ASME/ANS-RA-Sa-2009, Addenda to ASME/ANS RA-S-2008, 2009.
- Korea Atomic Energy Research Institute, "AIMS-PSA Release 2 Reference Manual", KAERI-ISA-MEMO-AIMS-03-KOR, 2012.
- Electric Power Research Institute, "FTREX 1.9 Software Manual", EPRI 3002012968, 2018.
- H. K. Lim, "A Study of System Analysis Method for Seismic PSA of Nuclear Power Plants", J. Korean Soc. Saf., Vol. 34, No. 5, pp. 159-166, 2019.
- W. S. Jung, "BeEAST Version 1.1 User Manual", Sejong University, 2017.
- Nuclear Safety and Security Committee, "A Study on System Modeling of Seismic PSA to Prevent Overestimation of Seismic CDF", NSTAR-19NS42-91, 2019.
- P. Zvonceka and O. Nusbaumera, "Comparison of MCUB and MCS BDD Fault Tree Solution Algorithms using Leibstadt Nuclear Power Plant Model", Probabilistic Safety Assessment and Management PSAM 14, Los Angeles, CA, USA, 2018.