Acknowledgement
This work was supported by research fund of Chungnam National University
References
- Cho, S.I. (2020), A Study on Estimation of Earthwork Volume Using UAV for BIM, Ph.D. dissertation, Chungnam National University, Daejeon, Korea, 1p., 132p.
- Cho, M., Kim, N., Chae, J.H. (2016), A study on automated quantity take-off methods of earth works in road design using 3D design concept, KSCE Journal of Civil and Environmental Engineering Research, Vol. 36, No. 2, pp. 277-283. (in Korean with English abstract)
- Cho, S.I., Lim, J.H., Lim, S.B., Yun, H.C. (2020), A study on DEM-based automatic calculation of earthwork volume for BIM application, Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography, Vol. 38, No. 2, pp. 131-140. https://doi.org/10.7848/KSGPC.2020.38.2.131
- Korea Expressway Corporation (2016), Ex-BIM Design Standard Model Establishment Research Report, No. OTKCRK170471, Korea Expressway Corporation design department, Kimcheon, Korea, pp. 4-9. (in Korean)
- Naver Map (2021), NAVER, https://map.naver.com (last date accessed: 3 January 2021).
- National Geographic Information Institute (2018a), Public Surveying Work Regulations Using Unmanned Aerial Vehicles. (in Korean)
- National Geographic Information Institute (2018b), Press Release. (in Korean)
- Pix4D (2021), PIX4D, https://support.pix4d.com/hc/en-us (last date accessed: 10 January 2021).
- Ulsan Metropolitan City (2021), Construction Design Guidelines, 57-6310000-0000-9610. (in Korean)
- Xu, C.X., Lim, J.H., Jin, X.M., Yun, H.C. (2018), Land cover mapping and availability evaluation based on drone images with multi-spectral camera, Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography, Vol. 36, No. 6, pp. 589-599. (in Korean with English abstract) https://doi.org/10.7848/KSGPC.2018.36.6.589