References
- Autodesk. (2020). Revit Help. About Modifying Elements. Retrieved from https://help.autodesk.com/
- Choi, H., Jang, K., & Lee, Y. (2020). Study on 3D Stratum model generation and Tunnel quantity using BIM, Journal of Korean Society of Road Engineers, 22(3), 59-65.
- Choi, H., Joo, H. J., Kim, H. J., & Yoon, S. J. (2012). Structural Behavior of Slab in the Partial Demolition for the Apartment Remodeling, Journal of The Korea Institute for Structural Maintenance and Inspection, 16(2), 19-30. https://doi.org/10.11112/jksmi.2012.16.2.019
- Choi, H., Joo, H. J., Lee, S., & Yoon, S. J. (2010). An Analytical Study on the Behavior of Slab Structure Considering the Remodeling. Journal of The Korea Institute for Structural Maintenance and Inspection, 14(2), 106-112. https://doi.org/10.11112/jksmi.2010.14.2.106
- Choi, J. P. Kim, H. J. & Lee, Y. J. (2011). Design Guidelines for the Extension of Aged Apartment Remodeling, Journal of the Architectural Institute of Korea, 27(1), 19-28.
- Graphisoft. (2020). Help Center. Solid Operations. Retrieved from https://helpcenter.graphisoft.com/user-guide-chapter
- Hong, G.-H., & Jung, W. K. (2007). An Analysis on the Seismic Performance of Additional Shear-Wall Construction for the Remodeling of Shear-Wall Apartment Buildings, Journal of The Korea Institute for Structural Maintenance and Inspection, 11(1), 153-162.
- Hong, J. H., Yeom, D. J., Choi, S. J., & Kim, Y. S. (2017). A Study of the Decision Support Model to Select an Appropriate Alternative Plan in Apartment Remodeling. Journal of the Architectural Institute of Korea Structure & Construction, 33(3), 41-50. https://doi.org/10.5659/JAIK_SC.2017.33.3.41
- Hur, M.-W., Y. H., L., & Lee, S. H. (2019). The Optimal Isolation Period of Vertically Story-added Remodeling Apartment Building with Seismic Isolation System, Journal of The Korea Institute for Structural Maintenance and Inspection, 23(3), 65-74.
- Hyoun, C. K. (2013). Structural Analysis and Design for Remodeling of Apartment Building, Review of Architecture and Building Science, 57(10), 27-33.
- Joo, S. U., Kim, C. K., Kim, S. U., & Noh, J. O. (2017). BIM-Based Quantity Takeoff and Cost Estimation Guidelines for Reinforced Concrete Structures, Journal of the Computational Structural Engineering Institute of Korea, 30(6), 567-576. https://doi.org/10.7734/COSEIK.2017.30.6.567
- Jung, G. Y., Woo, J. W., Kang, K. D., & Shin, J. C. (2013). Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume, KIBIM Magazine, 3(3), 9-18. https://doi.org/10.13161/kibim.2013.3.3.009
- Kim, G. J., Hong, E. H., Lee, J. S., Chun, J. Y., & Kim, B. S. (2015). A Performance Assessment Process and Systemization for Apartment Housing Remodeling, Journal of the Architectural Institute of Korea Structure & Construction, 31(10), 47-55. https://doi.org/10.5659/JAIK_SC.2015.31.10.47
- Kim, H.-J., Choi, J.-S., Kim, H.-S., & Kim, I.-H. (2013). The Development of Data Model for Open BIM-Based Schematic Estimates, Journal of the Architectural Institute of Korea 29(3), 61-70.
- Kim, H. S., & Lee, D. G. (2001). Efficient Seismic Analysis of High-Rise Shear Wall Building Structures considering the Flexural Stiffness of Floor Slabs, Journal of the Computational Structural Engineering Institute of Korea, 14(2), 193-202.
- Kim, K., Yoon, Y., & Kim, C. (2016). Improvements in the Business Process Model for the Aged Apartment Remodeling Project, Korean Journal of Construction Engineering and Management, 17(5), 45-53. https://doi.org/10.6106/KJCEM.2016.17.5.045
- Kim, S.-A., Park, G., Song, B.-S., Choi, C.-H., & Chin, S.-Y. (2016). A Study on Setting Up Work Conditions for Improving Productiviyt of BIM-based Cost Estimation. Korean Journal of Construction Engineering and Management, 17(1), 56-65. https://doi.org/10.6106/KJCEM.2016.17.1.056
- Kim, S.-A., Ryu, H. M. & Kim, J. Y. (2021). Automated and qualitative structural evaluation of floor plans for remodeling of apartment housing, Journal of Computational Design and Engineering, 8(1), 376-391. https://doi.org/10.1093/jcde/qwaa085
- Kim, S.-C. (2013). The Building Structural Problems and Solutions for the Remodeling of Vertical Extension. Review of Architecture and Building Science, 57(10), 23-26.
- Kim, Y.-J., Kim, S.-A., & Chin, S.-Y. (2012). A Study of BIM based estimation Modeling data reliability improvement. Korean Journal of Construction Engineering and Management, 13(3), 43-55. https://doi.org/10.6106/KJCEM.2012.13.3.043
- Koo, S. B., Kim, C. H., Sim, J.-S., Lee, D.-B., & Kim, J. Y. (2018). "Automatic Quantitative Evaluation System for Apartment Complex Remodeling." The 12th International Symposium on Architectural Interchanges in Asia (ISAIA), Pyeongchang, Korea.
- Lee, D. G., Lee, H. C., & Park, J. Y. (2019). A Study on the Estimation Accuracy through BIM-Based Detailed Cost Estimation, Journal of the Korean housing association, 30(5), 1-8. https://doi.org/10.6107/jkha.2019.30.5.001
- Lee, D.-G., & Cha, H. (2016). A Probabilistic Risk-based Cost Estimation Model for Initial-Stage Decision Making on Apartment Remolding Projects, Korean Journal of Construction Engineering and Management, 17(2), 70-79. https://doi.org/10.6106/KJCEM.2016.17.2.070
- Lee, J.-C., Jung, J.-H., & Lim, N.-G. (2005). Analysis of Stress Variation According to Removal of Shear Wall At the Remodeling of Shear Wall Type Apartment, Korean Journal of Construction Engineering and Management, 6(3), 72-80.
- Lee, J.-H., Lee, S.-W., & Kim, T.-Y. (2019). A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering, Journal of the Korea society of computer and information, 24(2), 127-137. https://doi.org/10.9708/JKSCI.2019.24.02.127
- Lee, J. S., Song, J. K. & H. G. H. (2005). A Study on the Remodeling Design Guidelines through Reviewing of Structural Performances in Apartment, Journal of the Architectural Institute of Korea, 21(11), 21-28.
- Lee, S.-W., Kim, J.-S., & Jeon, B.-K. (2015). Structural Alternatives for Remodeling of the Vertical Extension of Three Floors. Journal of the Architectural Institute of Korea Structure & Construction, 31(12), 11-22. https://doi.org/10.5659/JAIK_SC.2015.31.12.11
- Oh, S. H. (2014). Effective Seismic Structural System for Vertical Extension Remodeling of Apartment. Magazine of the Korea Institute for Structural Maintenance and Inspection, 18(1), 3-8. Retrieved from http://www.riss.kr/link?id=A100389339
- Park, Y.-J., Won, S.-K., Han, C.-H., & Lee, J. B. (2011). A Study on 3D BIM Collaborative Approximate Estimating Model of Structural Work for Apartment Projects, Journal of the Architectural Institute of Korea, 27(6), 123-130.
- Shin, H. C., Choi, K. B., & Yoon, S. C. (2018). A Study on the Optimization of Field Sampling Number of the Durability Evaluation Method for the Extension Remodeling of the Apartment Housing, Journal of The Korea Institute for Structural Maintenance and Inspection, 22(3), 60-68. https://doi.org/10.11112/JKSMI.2018.22.3.060
- Shin, J. C., Hwang, J. H., Lee, S. G., & Lee, S. W. (2012). BIM based Reliability Analysis and Automated Quantity Calculation. Journal of Korean Society of Disaster & Security, 12(3), 49-56.
- Yoon, J.-D., Cho, H.-S., Lee, J.-H., Shin, J.-Y., & Kim, E.-S. (2020). A Comparison of Quantity Take-Offs of RC Structures based on BIM. Journal of the Computational Structural Engineering Institute of Korea, 33(1), 35-44. https://doi.org/10.7734/COSEIK.2020.33.1.35