Acknowledgement
본 연구는 한국전력공사 자체연구개발 과제(R18SA04)의 지원과, 정부(과학기술정보통신부)의 재원으로 한국연구재단의 지원을 받아 수행된 연구(NRF-2020R1F1A1075881)임.
References
- Itasca Consulting Group (2019), PFC3D, User's Manual. Inc, Minneapolis, USA.
- KICT (2007), Development of optimized excavation model for mechanized construction of rapidly tunnel, Research Report, Retrieved from KR.
- KICT (2015), Development of optimized TBM cutterhead design method and high-performance disc cutter, Retrieved from KR.
- KTA (2008), Tunnel Mechanization Construction Design (1 ed.), CIR, Seoul, pp. 255-313.
- Lee, S.Y., Song, K.I., Jung, J.H. (2020), "A numerical study on the optimum spacing of disc cutters considering rock strength and penetration depth using discrete element method", Journal of Korean Tunnelling and Underground Space Association, Vol. 22, No. 4, pp. 383-399. https://doi.org/10.9711/KTAJ.2020.22.4.383
- Potyondy, D.O., Cundall, P.A. (2004), "A bonded-particle model for rock", International Journal of Rock Mechanics and Mining Sciences, Vol. 41, No. 8, pp. 1329-1364. https://doi.org/10.1016/j.ijrmms.2004.09.011
- Qi, G., Zhengying, W., Hao, M. (2016), "An experimental research on the rock cutting process of the gage cutters for rock tunnel boring machine (TBM)", Tunnelling and Underground Space Technology, Vol. 52, pp. 182-191. https://doi.org/10.1016/j.tust.2015.12.008
- Rostami, J. (1997), "Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure", Doctorate, Colorado School of Mines, pp. 1-242.
- Rostami, J., Ozdemir, L. (1993), "A new model for performance prediction of hard rock TBMs", Proceedings of the 1993 Rapid Excavation and Tunneling Conference, Boston, pp. 793-809.
- Shin, J.H. (2015), Geomechanics & Engineering-Analysis and Design II: CIR Co. Inc., Seoul, pp. 159-350.
- Zhang, Z., Aqeel, M., Li, C., Sun, F. (2019), "Theoretical prediction of wear of disc cutters in tunnel boring machine and its application", Journal of Rock Mechanics and Geotechnical Engineering, Vol. 11, No. 1, pp. 111-120. https://doi.org/10.1016/j.jrmge.2018.05.006