DOI QR코드

DOI QR Code

Failure Probability Analysis of Concrete Cofferdam Considering the Overflow in Flood Season

홍수시 월류를 고려한 콘크리트 가물막이댐의 파괴확률 산정

  • Hong, Won Pyo (Department of Safety Engineering, Incheon National University) ;
  • Song, Chang Geun (Department of Safety Engineering, Incheon National University)
  • Received : 2020.07.27
  • Accepted : 2020.10.13
  • Published : 2020.10.31

Abstract

In order to construct a dam, the diversion facility such as cofferdam and a diversion tunnel should be installed in advance. And size of a cofferdam depends on type of a main dam. According to the Korea Dam Design Standard, if the main dam is a concrete dam, design flood of the cofferdam is 1~2 years flood frequency. This means that overflow of the cofferdam occurs one time for 1 or 2 years, therefore, stability of the cofferdam should be secured against any overflow problem. In this study, failure probability analysis for the concrete cofferdam is performed considering the overflow. First of all, limit state function of the concrete cofferdam is defined for overturning, sliding and base pressure, and upstream water levels are set as El. 501 m, El. 503 m, El. 505 m, El. 507 m. Also, after literature investigation research, probabilistic characteristics of various random variables are determined, the failure probability of the concrete cofferdam is calculated using the Monte Carlo Simulation. As a result of the analysis, when the upstream water level rises, it means overflow, the failure probability increases rapidly. In particular, the failure probability is largest in case of flood loading condition. It is considered that the high upstream water level causes increase of the upstream water pressure and the uplift pressure on the foundation. In addition, among the overturning, the sliding and the base pressure, the overturing is the major cause for the cofferdam failure considering the overflow.

Keywords

References

  1. Dam Design Standard, Korea Water Resources Association, 2011.
  2. ANCOLD Guidelines on Dam Safety Management, Austallian National Committee on Large Dams, 2003.
  3. S. J. Cho, S, W, Shin, S. H. Sim and J. Y. Lim, "Failure Probability Assessment for Risk Analysis of Concrete Dam Under Flood", J. Korean Soc. Saf., Vol. 31, No. 6, pp. 58-66, 2016. https://doi.org/10.14346/JKOSOS.2016.31.6.58
  4. J. Y. Kim, J. G. Kim, B. H. Choi and H. H. Kwon, "A Development of Hydrologic Dam Risk Analysis Model Using Bayesian Network(BN)", Journal of the Korea Water Resource Associate, Vol. 48, No. 10, pp. 781-791, 2015. https://doi.org/10.3741/JKWRA.2015.48.10.781
  5. I. S. Ha, S. G. Lee, N. R. Kim and J. Y. Lim, "A Proposal of Seismic Failure Probability Estimation Chart of the Korean Small and Medium Sized Earthfill Dams", Journal of the Korean Geo-Environmental Society, Vol. 18, No. 3, pp. 31-38, 2017. https://doi.org/10.14481/jkges.2017.18.1.31
  6. J. S. Lee, "Application of Risk Analysis for Dam Safety Assessment", Journal of the Korea Water Resource Associate, Vol. 35, No. 6, pp. 651-664, 2002. https://doi.org/10.3741/JKWRA.2002.35.6.651
  7. A. A. Alla, "The Role of Fusegates in Dam Safety", International Journal on Hydropower and Dams, Issue 6, 1996.
  8. U. Merkel, and B. Westrich, "PC-River - Probabilistic Reliability Analysis for River Dikes", 4th International Symposium on Flood Defence, pp. 110-116, 2008.
  9. M. Mazzoleni, B. Bacchi, S. Barontini, G. Di Baldassarre, M. Pilotti and R. Ranzi, "Flooding Hazard Mapping in Floodplain Areas Affected by Piping Breaches in the Po River, Italy", Journal of Hydraulic Engineering, Vol. 19, No. 4, 2014.
  10. R. Ranzi, B. Barontini, M. Mazzoleni, M. Ferri and B. Bacchi, "Levee Breaches and 'Geotechnical Uncertainty' in Flood Risk Mapping", Proc., Int. Association for Hydro-Environment Engineering and Research (IAHR) Conf., Madrid, Spain, 2012.
  11. Y. C. Hue, Y. K. Tung and J. T. Kuo, "Evaluation of Dam Overtopping Probability Induced by Flood and Wind", Stochastic Environmental Research and Risk Assessment, Vol. 25, No. 1, pp. 35-45, 2012. https://doi.org/10.1007/s00477-010-0435-7
  12. S. M. Kim and S. Y. Ok, "Dynamic Response based Reliability Analysis of Structure with Passive Damper - Part 1: Assessment of Member Failure Probability", J. Korean Soc. Saf., Vol. 31, No. 4, pp. 90-96, 2016. https://doi.org/10.14346/JKOSOS.2016.31.4.90
  13. ICOLD Bulletin 130 : Risk Assessment in Dam Safety Management, International Commission on Large Dam, Paris, 2003.
  14. ICOLD Bulletin 99 : Dam failure - Statistical Analysis, International Commission on Large Dam, Paris, 1995.
  15. EM 1110-2-2200 Gravity Dam Design, US Army Corps of Engineers, 1995.
  16. K. H. Min, Risk Analysis and Decision Making, Eretec, 2018.
  17. L. Altarejos-Garcia, I. Escuder-Bueno, A. Serrano-Lombillo and M. G. de Membrilera-Ortuno, "Methodology for Estimating the Probability of Failure by Sliding in Concrete Gravity Dams in the Context of Risk Analysis", Structural Safety, Vol. 36-37, pp. 1-13, 2012. https://doi.org/10.1016/j.strusafe.2012.01.001
  18. C. Bernstone, M. Westberg and J. Jeppsson, "Structural Assessment of a Concrete Dam Based on Uplift Pressure Monitoring", Geotechnical and Geoenvironmental Engineering, Vol. 135, pp. 133-142, 2009. https://doi.org/10.1061/(ASCE)1090-0241(2009)135:1(133)
  19. L. Peyras, P. Royet, L. Deroo, R. Albert, J. Becue, S. Aigouy, E. Bourdarot, D. Loudiere and J. Kovarik, "French Recommendations for Limit-State Analytical Review of Gravity Dam Stability", European Journal of Environmental and Civil Engineering, Vol. 12, pp. 1137-1164, 2008. https://doi.org/10.1080/19648189.2008.9693071
  20. ACI 214R-02, Evaluation of Strength Test Results of Concrete, American Concrete Institute, USA, 2002.