References
- Bae, Kyung-Won, Mynung-Chan Park (2013), "Management Performances of Korean Plant/Construction Firms in Central and South America", Korea Trade Review, 38(2), 463-492.
- Cha, Hee-Sung and Gang-Yong Shin (2006), "Risk Assessment Methodology By Analyzing Degree of Perception for Project Characteristic Factors on Cost Performance", Journal of The Architectural Institute Of Korea Structure & Construction, 22(8), 125-132.
- Choi, Doo-Hoi, Hong-Soon Bang and Ok-Kyue Kim (2018), "Proposal of Risk Management Process in the Order Phase of Overseas Plant Projects", Journal of the Regional Association of Architectural Institute of Korea, 20(4), 53-62.
- Crawford, L. (2000), "Profiling the Competent Project Manager", In Proceedings of PMI Research Conference (pp. 3-15), Newton Square, PA: Project Management Institute.
- e-korea index (2020), overseas plant order trend (Webpage). Available from http://www.index.go.kr/potal/stts/idxMain/selectPoSttsIdxMainPrint.do?idx_cd=1139&board_cd=INDX_001
- Jeon, Jong-Nam (2017), "Risk Factor Identification and Assessment by the Project Stage for Overseas Plant Projects", (Master' Thesis), Seoul: Ching-And University, 1-72.
- Jung, Yoon-Jung, Su-Han Woo and Keun-Sik Park (2015), "The Importance of Plant Location Decision-Making in the Petrochemical Industry", Journal of Korea Port Economic Association, 31(1), 127-145.
- Jurison, J. (1999), "Software Project Management: The Managers View", Communications of the Association for Information Systems, 2(1), Article 17.
- Katz, R. L. (2009), Skills of an Effective Administrator. Harvard Business Review Press.
- Kim, Eun-Hong and Wha-Young Kim (2006), "The Effects of the Project Managers Competency and Leadership Style on the Performance and the Customer Satisfaction of SI Projects", Journal of the Korean Operations Research and Management Science Society, 31(4), 157-179.
- Kim, Jee-young and Sun-eung Ahn (2011), "Developing a Bayesian Network Model for Real-time Project Risk Management", IE Interfaces, 24(2), 119-127. https://doi.org/10.7232/IEIF.2011.24.2.119
- Kim, Young-Jae, Ju-Yeon Han, Dong-Woo Shin, Kyung-Rai Kim , Chang-Deok Kim and Sang-Wook Seo (2003), "A Tact Planning and Scheduling Process Model for Reduction of Finishing Work Duration in Building Construction Projects", Journal of The Architectural Institute of Korea Structure & Construction, 19(1), 161-168.
- Lee, Byung-woo, Keun-sik Park (2016), "A Study on Risk Management Ability by Freight Forwarder and Project Performance", Korea Logistics Review, 26(3), 49-64.
- Lee, Jae-Min and Jong-Soo Choi (2007), "Procurement Management Impact on Scheduling - Focused on Steel Frame Erection Works", Journal of Architectural Institute of Korea Structure & Construction, 23(12), 141-148.
- Lee, Tae-Won and Won-Il Joh (2017), "Study on the Influence of the Risk Management Factors for Project Performance in the Construction Project", Korea Business Education Review, 32(1), 285-302.
- Lipovetsky, S., A. Tishler, D. Dvir and A. Shenhar (1997), "The Relative Importance of Project Success Dimensions", R&D Management, 27(2), 97-106. https://doi.org/10.1111/1467-9310.00047
- Nam, Jae-deog, Taek-kee Min, Tae-Ho Ahn (2008), "An Empirical Study about the Effects of the Project Managers' Competency and Leadership on the Project Performance", Journal of Social Science, 10, 45-65.
- Park, Bum-Soo (2016), "Risk Assessment and Management in Bidding Phase for Overseas Plant Projects (Master' Thesis)", Seoul: Han-Yang University, 1-39.
- Park, Eui-seung, Ho-seon Yoo, Jae-Heon Lee (2011), "Management in the EPC Business for Overseas Power Plant Projects", Plant Journal, 7(3), 48-64.
- Seo, Jae-Pil (2017), "The Development of Bidding Phase Risk Response System Model for EPC Power Plant Projects (Doctoral Dissertation)", Seoul: Sung-Sil University, 1-182.
- Siew, K. K and Hal Macomber (2007), "Plans Key to Successful Projects", InTech, 56-57
- Smith, N. J. (2003), Appraisal, Risk and Uncertainty, Thomas Telford.
- Sobotka, A. and A. Czarnigowska (2005), "Analysis of Supply System Models for Planning Construction Project Logistics", Journal of Civil Engineering and Management, 11(1), 73-82. https://doi.org/10.3846/13923730.2005.9636335
- Song, Eun-Jung (2016), "Study on Perception of Selection Factors for Project Logistics between Shipper Company and Freight Forwarders (Master' Thesis)", Seoul: Chung-Ang University, 1-77.
- Stevens, J. D. (1996), "Blueprint for Measuring Project Quality", Journal of Management in Engineering, 12(2), 34-39. https://doi.org/10.1061/(ASCE)0742-597X(1996)12:2(34)
- Thamhain, H. J. (1992), "Resource Estimating for Technology-Intensive Projects", AACE International Transactions, 2, P-4.