참고문헌
- Allahverdi, A. and Soroush, H.M., The significance of reducing setup time/setup costs, European Journal of Operational Research, 2008, Vol. 187, No. 3, pp. 978-984. https://doi.org/10.1016/j.ejor.2006.09.010
- Barker, J.R. and McMahon, G.B., Scheduling the general jobshop, Management Science, 1985, Vol. 31, No. 5, pp. 594-598. https://doi.org/10.1287/mnsc.31.5.594
- Choi, J.S., Kang, I.S., and Park, C.W., Dispatching rule of automated guided vehicle to minimize makespan under jobshop condition, Journal of Society of Korea Industrial and Systems Engineering, 2001, Vol. 24, No. 62, pp. 97-109.
- Choi, Y.C., Dispatching rule-based scheduling algorithms in a single machine with sequence-dependent setup times and energy requirements, Procedia CIRP, 2016, Vol. 41, pp. 135-140. https://doi.org/10.1016/j.procir.2015.12.109
- Defersha, F.M. and Chen, M.Y., Jobshop lot streaming with routing flexibility, sequence-dependent setups, machine release dates and lag time, International Journal of Production Research, 2012, Vol. 50, No. 8, pp. 2331- 2352. https://doi.org/10.1080/00207543.2011.574952
- Floudas, C.A. and Lin, X., Continuous-time versus discrete- time approaches for scheduling of chemical processes : A review, Computers and Chemical Engineering, 2004, Vol. 28, No. 11, pp. 2109-2129. https://doi.org/10.1016/j.compchemeng.2004.05.002
- Floudas, C.A. and Lin, X., Mixed integer linear programming in process scheduling : modeling, algorithms, and applications, Annals of Operations Research, 2005, Vol. 139, No. 1, pp. 131-162. https://doi.org/10.1007/s10479-005-3446-x
- French, S., Sequencing and scheduling : An introduction to the mathematics of the job-shop, New York : Ellis Horwood, 1982.
- Garey, M.R., Johnson, D.S., and Sethi, R.R., The complexity of flowshop and jobshop scheduling, Mathematics of Operations Research, 1976, Vol. 1, No. 2, pp. 117-129. https://doi.org/10.1287/moor.1.2.117
- Graves, S.C., A review of production scheduling, Operations Research, 1981, Vol. 29, No. 4, pp. 646-675. https://doi.org/10.1287/opre.29.4.646
- Ingimundardottir, H. and Runarsson, T.P., Supervised learning linear priority dispatch rules for job-shop scheduling, International Conference on Learning and Intelligent Optimization, 2011, Berlin : Springer, pp. 263-277 (http://link.springer.com/chapter/10.1007%2F978-3-642-25566-3_20).
- Johnson, S.M., Optimal two and three stage production schedules with setup times included, Naval Research Logistics Quarterly, 1954, Vol. 1, No. 1, pp. 61-68. https://doi.org/10.1002/nav.3800010110
- Ju, Q.Y., Planning and scheduling optimization of jobshop in intelligent manufacturing system [dissertation], [Nanjing, China] : Nanjing University of Aeronautics and Astronautics, 2007.
- Kim, J.K. and Bang J.Y., Dispatching rule based jobshop scheduling algorithm with delay schedule for minimizing total tardiness, Journal of Society of Korea Industrial and Systems Engineering, 2019, Vol. 42, No. 1, pp. 33-40. https://doi.org/10.11627/jkise.2019.42.1.033
- Lin et al., Network modeling and evolutionary optimization for scheduling in manufacturing, Journal of Intelligent Manufacturing, 2012, Vol. 23, No. 6, pp. 2237-2253. https://doi.org/10.1007/s10845-011-0569-6
- Manikas, A. and Chang, Y.L., Multi-criteria sequencedependent job shop scheduling using genetic algorithms, Computers and Industrial Engineering, 2009, Vol. 56, No. 1, pp. 179-185. https://doi.org/10.1016/j.cie.2008.05.002
- Morton, T. and Pentico, D.W., Heuristic scheduling systems : With applications to production systems and project management, London : Wiley, 1993.
- Panwalker, S.S. and Iskander, W., A survey of scheduling rules, Operations Research, 1977, Vol. 25, No.1, pp. 45-61. https://doi.org/10.1287/opre.25.1.45
- Paul, M., Sridharan, R., and Ramanan, T.R., A multiobjective decision-making framework using preference selection index for assembly job shop scheduling problem, International Journal of Management Concepts and Philosophy, 2016, Vol. 9, No. 4, pp. 362-387. https://doi.org/10.1504/IJMCP.2016.079843
- Pinedo, M., Scheduling : Theory, Algorithms and Systems, Englewood Cliffs : Prentice-Hall, 1995.
- Sharma, P. and Jain, A., Analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent setup times, Frontiers of Mechanical Engineering, 2014, Vol. 9, No. 4, pp. 380-389. https://doi.org/10.1007/s11465-014-0315-9
- Sharma, P. and Jain, A., New setup-oriented dispatching rules for a stochastic dynamic job shop manufacturing system with sequence-dependent setup times, Concurrent Engineering Research Applications, 2016, Vol. 24, No. 1, pp. 58-68. https://doi.org/10.1177/1063293X15599814
- Thenarasu, M., Rameshkumar, K., Anbuudayasankar, S. P., Arjunbarath, G., and Ashok, P., Development and selection of hybrid dispatching rule for dynamic job scheduling using multi-criteria decision making analysis (MCDMA), IJQR, 2020, Vol. 14, No. 2, pp. 340-364.
- Zahmani et al., Multiple priority dispatching rules for the job shop scheduling problem, In 2015 3rd international conference on control, engineering and information technology (CEIT) IEEE, 2015, pp. 1-6.
- Zhang, J., Ding, G., Zou, Y., Qin, S., and Fu, J., Review of job shop scheduling research and its new perspectives under Industry 4.0, Journal of Intelligent Manufacturing, 2017, Vol. 30, No. 4, pp. 1809-1830.