참고문헌
- ABS Consulting Ltd, GPSA 2009 Gesamtdokumentation, R-1699596-1751, 2008.
- ABS Consulting, GPSA 2015 Gosgen Probabilistic Safety Assessment, R-2129227-1853, 2015.
- P. Baraldi, L. Podofillini, L. Mkrtchyan, E. Zio, V.N. Dang, Comparing the treatment of uncertainty in Bayesian networks and fuzzy expert systems used for a human reliability analysis application, Reliab. Eng. Syst. Saf. 138 (2015) 176-193. https://doi.org/10.1016/j.ress.2015.01.016
- T. Bedford, C. Bayley, M. Revie, Screening, sensitivity, and uncertainty for the CREAM method of human reliability analysis, Reliab. Eng. Syst. Saf. 115 (2013) 100-110. https://doi.org/10.1016/j.ress.2013.02.011
- M. Cepin, Importance of human contribution within the human reliability analysis (IJS-HRA), J. Loss Prev. Process. Ind. 21 (3) (2008) 268-276. https://doi.org/10.1016/j.jlp.2007.04.012
- M. Cepin, A. Prosek, Success criteria time windows of operator actions using RELAP5/MOD3.3 within human re-liability analysis, J. Loss Prev. Process. Ind. 21 (3) (2008) 260-267. https://doi.org/10.1016/j.jlp.2007.06.010
- H. Fujimoto, M. Fukuda, H. Tabata, Sensitivity study of human errors as a basis for human error reductions on new safety system design, Reliab. Eng. Syst. Saf. 45 (1-2) (1994) 215-221. https://doi.org/10.1016/0951-8320(94)90088-4
- G.W. Hannaman, D.H. Worledge, Some developments in human reliability analysis approaches and tools, Reliab. Eng. Syst. Saf. 22 (1-4) (1988) 235-256. https://doi.org/10.1016/0951-8320(88)90076-2
- IAEA, Human Reliability Analysis in Probabilistic Safe-Ty Assessment for Nuclear Power Plants, Safety Series No. 50-P-10, Vienna, 1995.
- IAEA, Attributes of Full Scope Level 1 Probabilistic Safety Assessment (PSA) for Applications in Nuclear Power Plants, IAEA-TECDOC-1804, Vienna, 2016.
- D. Kancev, S. Heussen, J.U. Kluegel, P. Drinovac, T. Kozlik, Human reliability analysis in NPP: a plant-specific sensitivity analysis considering dynamic operator actions versus accident management actions, in: Proceedings of the European Safety and Reliability Conference ESREL 2018, 2018. Trondheim, Norway, 2018.
- M. Khalaquzzaman, H.G. Kang, M.C. Kim, P.H. Seong, Quantification of unavailability caused by random failures and maintenance human errors in nuclear power plants, Reliab. Eng. Syst. Saf. 44 (1-2) (2010) 27-55. https://doi.org/10.1016/0951-8320(94)90105-8
- M.C. Kim, P.H. Seong, A computational method for probabilistic safety assessment of I&C systems and human operators in nuclear power plants, Reliab. Eng. Syst. Saf. 91 (5) (2006) 580-593. https://doi.org/10.1016/j.ress.2005.04.006
- B.O.Y. Lydell, Human reliability methodology. A discussion of the state of the art, Reliab. Eng. Syst. Saf. 36 (1) (1992) 15-21. https://doi.org/10.1016/0951-8320(92)90145-B
- P. Moieni, A.J. Spurgin, A. Singh, Advances in human re-liability analysis methodology. Part I: frameworks, models and data, Reliab. Eng. Syst. Saf. 44 (1-2) (1994) 27-55. https://doi.org/10.1016/0951-8320(94)90105-8
- L. Podofillini, V.N. Dang, A Bayesian approach to treat expert-elicited probabilities in human reliability analysis model construction, Reliab. Eng. Syst. Saf. 117 (2013) 52-64. https://doi.org/10.1016/j.ress.2013.03.015
- U.S. NRC, Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications, 1983. NUREG/CR-1278.
- U.S. NRC, Accident Sequence Evaluation Program Human Reliability Analysis Procedure, 1983. NUREG/CR-4772.
- U.S. NRC, A Procedure for Conducting Human Reliability Analysis for Nuclear Power Plants, 1983. NUREG/CR-2254.