Acknowledgement
이 연구는 2020년도 국토교통과학기술진흥원(20RERP-B082884-7)의 연구비 지원에 의한 결과의 일부임.
References
- ACI Innovation Task Group 5 (2007). Acceptance Criteria for Special Unbonded Post-Tensioned Precast Structural Walls Based on Validation Testing (ACI ITG-5.1-07) and Commentary. American Concrete Institute, USA.
- Architectural Institute of Korea (2016). Korea Building Code (KBC2016 / KBC2009), Seoul, Korea.
- Kang, S.M., Oh, J.K., Kim, O.J., Lee, D.B., & Park, H. G. (2010). Development of a Precast Concrete Structural Wall Adopting Improved Connections in the Plastic Hinge Region, Journal of the Korea Concrete Institute, 14(2), 15-26.
- Kim, S.K., Seo, S.Y., Kim, S.H., Lim, B.H., & Cha, J. W. (2019). Hysteretic Characteristic of Precast Concrete Wall with Box Type Connector for Vertical Bars under Horizontal Load, Journal of the Korea Concrete Institute, 31(2), 153-163. https://doi.org/10.4334/jkci.2019.31.2.153
- Kim, S.K., Seo, S.Y., Lim, B.H., Kim, S.H., Woo, J.W. & Cha, J.W. (2017). Structural Performance of Precast Concrete Horizontal Joint Connected Vertically by Corrugate Pipe Joint Method, Proceedings of Autumn Conference of the Architectural Institute of Korea, 37(2), 683-686.
- Kim, M.S., Kim, M.J., Lee, Y.H., Kim, H.C., & Kim, K.S. (2010). Experimental Study on Structural Performance of Joints for Precast Concrete Segment under Cyclic Lateral Loading, Journal of the Architectural Institute of Korea, Structure and Construction Section, 26(12), 65-72.
- Lim, W.Y., & Hong, S.G. (2014). Seismic Performance of T-Shaped PC Walls with Wet Cast Joint, Journal of the Korea Concrete Institute, 26(3), 255-266. https://doi.org/10.4334/JKCI.2014.26.3.255
- Ling, J.H., Ahmad, A.B., & Ibrahim, I.S. (2014). Feasibility study of grouted splice connector under tensile load. Construction and Building Materials, 50, 530-539. https://doi.org/10.1016/j.conbuildmat.2013.10.010
- Oh, Y.H., & Moon, J.H. (2013). Analytical and Experimental Studies on Splice Sleeves for SD500 Rebars, Journal of the Korea Concrete Institute, 25(2), 165-173. https://doi.org/10.4334/JKCI.2013.25.2.165
- Seifi, P., Henry, R.S., & Ingham, J.M. (2019). In-plane cyclic testing of precast concrete wall panels with grouted metal duct base connections, Engineering Structures, 184, 85-98. https://doi.org/10.1016/j.engstruct.2019.01.079
- Singhal, S., Chourasia, A., Chellappa, S., & Parashar J. (2019). Precast reinforced concrete shear walls: State of the art review, Structural Concrete, 20, 886-898. https://doi.org/10.1002/suco.201800129
- Tolsma K.V. (2010). Precast concrete cores in high-rise buildings, Master Thesis, Delft University of Technology.
- Zhi, Q., Song, J., & Guo, Z. (2015). Experimental study on behavior of precast shear wall using post-cast at the connection, International Conference on Civil Engineering and Transportation (ICCET2015), 1089-1092.