DOI QR코드

DOI QR Code

A Study on the Establishment of Reliability Growth Planning for One-shot System

원샷시스템의 신뢰도 성장 계획 설정 방안

  • Received : 2020.03.03
  • Accepted : 2020.04.27
  • Published : 2020.06.30

Abstract

In this paper we proposed to develop the reliability growth planning for the One-shot system using the PM2-Discrete model. The PM2-Discrete is the methodology specifically developed for discrete systems and is the first quantitative method available for formulating detailed plans in the discrete usage domain. First, the parameters RG, RI, T, MS and d of the PM2-Discrete model are set. Second, the case analysis was performed on One-shot system A. Third, the input parameter values were applied to drive the R(t) equation. Finally, using RGA 11 Software, the reliability Growth Planning Curve of One-shot system A was constructed. Also, the sensitivity analyses are performed for the changes of model parameters. The results of this study can be usefully used in establishing the reliability growth planning curve of the One-shot system.

Keywords

References

  1. MIL-HDBK-189C, Reliability Growth Management, Department of Defense Handbook, pp. 2, 8, 26, 29-30, 2011.
  2. J. Emahiser/ADUSD(L), Life Cycle and O&S Costs, DA ILS Symposium, pp. 5-7, 1997.
  3. JCIDS Manual, Manual for the operation of the joint capabilities integration and development system, pp. B-A 2-3, 2012.
  4. Lee, S. J., and Choi, Y. C., A Study on the application of Computerized Systems Engineering Tool to Support RAMS Activities for Light Rail Transit Project, Journal of the Korean Society of Systems Engineering, Vol. 10, No. 2, pp. 33-42, 2014.
  5. Chung, I. H., Lee, H. Y., and Park, Y. I., Reliability Evaluation of Weapon System Using Field Data: Focusing on Case Study of K-series Weapon System, Journal of the Korean Society for Quality Management, Vol. 40, No. 3, pp. 278-285, 2012. https://doi.org/10.7469/JKSQM.2012.40.3.278
  6. Kim, M. S., Chung, J. W., Lee, J. S., A Reliability Growth Prediction for a One-Shot System Using AMSAA Model, Journal of Applied Reliability, Vol. 14, No. 4, pp. 225-229, 2014.
  7. Jo, B. R., A case study on reliability growth analysis for a missile system composed of all up round missile and launcher, Journal of the Korea Academia-Industrial cooperation Society, Vol. 20, No. 2, pp. 329-335, 2019. https://doi.org/10.5762/KAIS.2019.20.2.329
  8. Kim, S. B., Park, W. J., You, J. W., Lee, J. K., Yong, H. Y., Reliability Prediction Based Reliability Growth Management : Case Study of Surveillance System, Journal of the Korean Society for Quality Management Vol. 47, No.1 pp. 187-198, 2019. https://doi.org/10.7469/JKSQM.2019.47.1.187
  9. U.S. Department of Defense, Operation of the Defense Acquisition System, DoD Instruction 5000.02, p. 19, 2008.
  10. DoD Guide for achieving Reliability, Availability & Maintainability, Department of Defense, Chapter 3 Understand and Document User Needs and Constraints, p. 3, 2005.
  11. Ellner, P. M., and Trapnell, B., AMSAA Reliability Growth Data Study, The Army Materials Systems Analysis Activity, Aberdeen Proving Ground, AMSAA Interim Note IN-R-184, 1990.