An Overview of Time Estimation in the Appraisal of Completeness for Software

  • Kim, Yukyong (Division of Basic Engineering, Sookmyung Women's University)
  • Received : 2020.05.20
  • Accepted : 2020.06.19
  • Published : 2020.06.30

Abstract

The completeness appraisal of software is performed in various forms, such as assessing the completion level in the development process, calculating the defect rate, estimating the development cost, and calculating the redevelopment cost. Along with this, the problem that is often dealt with is estimation of the development time. Even in a dispute over completeness due to delays in software development, issues of calculating an appropriate development time required to develop a delivery software or a development time required for change requests are often included in the appraisal request. In this paper, we introduce the procedure and method for estimating the appropriate project time of software development so that the appraiser can be applied to the appraisal work for determining the completeness. The method is based on the manual for calculating the appropriate project period of software development project.

Keywords

References

  1. K. T. Kwon, "Overview of the Appraisal of Completeness for Software", Journal of Korea Software Assessment and Valuation Society, vol.11, no.2, pp.1-8, Dec. 2015. http://www.i3.or.kr/html/paper/2015-2/(1)2015-2.pdf
  2. K. T. Kwon, "Problem of SW Cost Estimation Guideline for the Appraisal of Software Development Cost", Journal of Korea Software Assessment and Valuation Society, vol.12, no.1, p.11-19, June 2016. http://www.i3.or.kr/html/paper/2016-1/(2)2016-1.pdf
  3. Korea Copyright Commission, "Collection of cases of disputes such as SW copyright, vol. 1", Feb. 2011. http://www.copyright.or.kr/information-materials/publication/research-report
  4. National IT Industry Promotion Agency, "Manual for Calculating the Appropriate Project Period of Software Development Project", July 2016. https://www.swit.or.kr/IS/web/isCbmRefView.jsp?ref_sq=662
  5. Korea Software Industry Association, "SW Business Price Estimation Guidelines (2019 Revision)", June 2019. http://www.kdata.or.kr/info_05_download
  6. Korea Software Industry Association, "International Standards-Based Function Point Calculation Guidelines", Nov. 2014. http://kdata.or.kr/info_05_download
  7. S. Oligny, P. Bourque and A. Abran, "An Empirical Assessment of Project Duration Models in Software Engineering", Proceedings of the 8th European Software Control and Metrics Conference (ESCOM'97), 24-29; Berlin, Germany, May, 1997.
  8. S. Oligny, P. Bourque, A. Abran and B. Fournier, "Exploring the Relation Between Effort and Duration in Software Engineering Projects", Proceedings of 16th World Computer Congress 2000 (WCC 2000), 175-178; Beijing, China. August, 2000. https://pdfs.semanticscholar.org/416b/66f0c3969f12d922b6b3758795f17a71b928.pdf
  9. B. A. Kitchenham, "Empirical Studies of Assumptions That Underlie Software Cost estimation Models", Information and Software Technology, vol.34, no.4, pp. 211-218, April 1992. DOI: https://doi.org/10.1016/0950-5849(92)90077-3
  10. O. K. Harfoushi, "Software project scheduling techniques: A comparison study", International Review on Computers and Software, vol.8, no.3, pp.876-880, March 2013.