References
- Hong SW, Kim HI, Ahn YS. A study on development and real situation analysis for the risk management of domestic construction companies. Journal of Architectural Institute of Korea Structure & Construction. 2003 May;19(5):153-60.
- Wood G, Ellis RCT. Risk management practices of leading UK cost consultants. Engineering Construction and Architectural Management. 2003 Aug;10(4):254-62. http://doi.org/10.1108/09699980310489960
- Dikmen I, Birgonul MT, Arikan AE. A critical review of risk management support tools. 20th Annual Conference of Association of Researchers in Construction Management; 2004 Sep 1-3; Edinburgh, UK. Reading (UK): Association of Researchers in Construction Management; 2004. p. 1145-54.
- Emmett JV, Therese MV. Essential of insurance: a risk management perspective. New York: John Wiley & Sons; 1995. 656 p.
- Yu YJ, Son K, Kim T, Kim JM. A risk quantification study for accident causes on building construction site by applying probabilistic forecast concept. Journal of the Korea Institute of Building Construction. 2017 Jun;17(3):287-94. https://doi.org/10.5345/JKIBC.2017.17.3.287
- UNDHA. Internationally agreed glossary of basic terms related to disaster management. Geneva: United Nations Department of Humanitarian Affairs; 1992. 64 p.
- Adams J. Risk. London: University College London Press; 1995. 8 p.
- Smith K. Environmental hazards: assessing risk and reducing disaster. 2nd ed. London: Routledge; 1996. 12 p.
- Crichton D. The risk triangle. Natural Disaster Management, Leicester: Tudor Rose Holdings; c1999. Chapter 5, Risk Assesment; p. 102-3.
- Jones RN, Boer R. Adaptation policy frameworks for climate change: developing strategies, policies and measures. Cambridge: Cambridge University Press, Cambridge; 2004. Chapter 4, Assessing current climate risks; p 91-117 [cited 2019 Sep 3]. Available from: http://www4.unfccc.int/sites/NAPC/Country%20Documents/General/apf%20technical%20paper04.pdf
- Zou PX, Zhang G, Wang J. Understanding the key risks in construction projects in china. International journal of project management. 2007 Aug;25(6):601-14. http://doi.org/10.1016/j.ijproman.2007.03.001
- Baloi D, Price AD. Modelling global risk factors affecting construction cost performance. International Journal of Project Management. 2003 May;21(4):261-9. http://doi.org/10.1016/S0263-7863(02)00017-0
- Laryea S. Risk pricing practices in finance, insurance and construction. COBRA 2008 The Construction and Building Research Conference of the Royal Institution of Chartered Surveyors; 2008 Sep 4-5; Dublin, Ireland. London (UK): The Construction and Building Research Conference of the Royal Institution of Chartered Surveyors; 2008. p. 1-16.
- Baker S, Ponniah D, Smith S. Techniques for the analysis of risks in major projects. The Journal of the Operational Research Society. 1998 Jan;49(6):567-72. http://doi.org/10.2307/3010665
- Wang YM, Elhag TMS. A fuzzy group decision making approach for bridge risk assessment. Computers & Industrial Engineering. 2007 Aug;53(1):137-48. http://doi.org/10.1016/j.cie.2007.04.009
- Elhag TMS, Wang YM. Risk assessment for bridge maintenance projects: neural networks versus regression techniques. Journal of Computing in Civil Engineering. 2007 Nov;21(6):402-9. https://doi.org/10.1061/(ASCE)0887-3801(2007)21:6(402)
- Seo SE, Gang GS. Risk index computation of work type for bridge construction using accident cases and the AHP method. Proceedings of the Safety Management and Science Conference; 2009 Nov 21; Seoul, Korea. Seoul (Korea): Korea Safety Management and Science; 2009. p. 441-59.
- Deco A, Frangopol DM. Risk assessment of highway bridges under multiple hazards. Journal of Risk Research. 2011 Oct;14(9):1057-89. https://doi.org/10.1080/13669877.2011.571789
- Hashemi H, Mousavi SM, Mojtahedi SM. Bootstrap technique for risk analysis with interval numbers in bridge construction projects. Journal of Construction Engineering and Management. 2011 Aug;137(8):600-8. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000344
- Li QF, Li ZX, Niu J. Application of factor analysis to risk evaluation of bridge construction. Advanced Materials Research. 2011 May;243:1848-53. http://doi.org/10.4028/www.scientific.net/AMR.243-249.1848
- Choudhry RM, Aslam MA, Hinze JW, Arain FM. Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines. Journal of Construction Engineering and Management. 2014 Mar;140(7):04014020-1-9. http://doi.org/10.1061/(ASCE)CO.1943-7862.0000857
- Yun SY, Kim CH, Kang LS. Development of model for selecting superstructure type of small size bridge using dual classification method. Journal of The Korean Society of Civil Engineers. 2015 Nov;35(6):1413-20. http://doi.org/10.12652/Ksce.2015.35.6.1413
- Public Procurement Agency [Internet]. Standards for pre-qualification for contractor[cited 2019 Sep 3]. Available from: http://www.law.go.kr/LSW//admRulLsInfoP.do?chrClsCd=&admRulSeq=2100000184412
- Koh HM, Kim HJ, Lim JH, Kang SC, Choo JF. Lifetime design of cable-supported super-long-span bridges. Proceedings of the 5th International Conference on Bridge Maintenance, Safety and Management; 2010 Jul 11-15; Philadelphia, PA, USA. London(UK): International Conference on Bridge Maintenance, Safety and Management; 2010. p. 26-42.
- Kim BI, Yoon KY, Lee SH. Field investigation of scour-protection methods for bridges in small size streams of central region of Korea. Journal of Korean Society of Hazard Mitigation. 2005 Mar;5(1):45-53.
- Giroux RP. Relevance of roebling. Journal of Performance of Constructed Facilities. 2009 Feb;23(1):2-4. https://doi.org/10.1061/(ASCE)0887-3828(2009)23:1(2)
- Jo BW, Park JC, Kim CH. Wind characteristics of existing long span bridge based on measured data. KSCE Journal of Civil Engineering. 2005 May;9(3):219-24. http://doi.org/10.1007/BF02829053
- Kim KW, Park MH, Chang CH. Research on the optimum design for PSC box girder bridges using the full staging method. Journal of the Korea institute for structural maintenance and inspection. 2004 Feb;8(3):159-67.
- Lee HW, Jang JY. Design formula for launching nose of ILM bridge considering the interaction behavior with superstructure sections. Journal of the Computational Structural Engineering Institute of Korea. 2006 Aug;23(1):53-60.
- Kwak HG, Son JK. Determination of design moments in bridges constructed with a movable scaffolding system. Computers and Structures. 2006 Dec;84(31-32):2141-50. http://doi.org/10.1016/j.compstruc.2006.08.044
- Kim SB, Cho JH. Development of the approximate cost estimating model for PSC box girder bridge based on the breakdown of standard work. Journal of the Korean Society of Civil Engineers. 2013 Mar;33(2):791-800. https://doi.org/10.12652/Ksce.2013.33.2.791
- Kim JM, Kim T, Bae J, Son K, Ahn S. Analysis of plant construction accidents and loss estimation using insurance loss records. Journal of Asian Architecture and Building Engineering. 2019 Dec;18(6):507-16. http://doi.org/10.1080/13467581.2019.1687089