References
- Kim SJ, Yoon MO. A study on the improvement program of bridge safety management through public-private governance. Journal of the Korean Society of Hazard Mitigation. 2018 Jan 31;18(1):145-56. https://doi.org/10.9798/KOSHAM.2018.18.1.145
- Hong SW, Kim HI, Ahn YS. A study on development and real situation analysis for the risk management of domestic construction companies. Journal of Architectural Institute of Korea. 2003 May;19(5):153-60.
- Odeyinka HA. An evaluation of the use of insurance in managing construction risks. Construction Management and Economics. 2000 Oct;18(5):519-24. http://dx.doi.org/10.1080/014461900407329
- Ha SG, Kim TH, Son KY, Kim IM, Son SH. Quantification model development of human accidents on external construction site by applying probabilistic method. Journal of the Korea Institute of Building Construction. 2018 Dec;18(6):611-9. https://doi.org/10.5345/JKIBC.2018.18.6.611
- Everett JG, Frank JrPB. Costs of accidents and injuries to the construction industry. Journal of Construction Engineering and Management. 1996 Jun;122(2):158-64. https://doi.org/10.1061/(ASCE)0733-9364(1996)122:2(158)
- Kim DC, Kim HJ. A plan of the accident classification system for the analysis of disaster information in construction projects. Journal of the Architectural Institute of Korea (Structure & Construction). 2001 Dec;17(11):139-45.
- Ahn HS. A study on the development of the accident classification systems for construction industry. Journal of the Architectural Institute of Korea. 1996 Jun:12(6):241-54.
- Lee JS, Hong JS, Kim JJ. A self-control safety management activity model in construction sites through analysis of success factors. Journal of the Korea Institute of Building Construction. 2008 Oct;8(5):109-17. https://doi.org/10.5345/JKIC.2008.8.5.109
- Lee JS, Ahn BJ, Kim JJ. Evaluating and suggesting key risk factors according to risk hierarchy of occurrence field of occurrence field in the overseas development projects. Korean Journal of Construction Engineering and Management. 2012 May;13(2):70-9. https://doi.org/10.6106/KJCEM.2012.13.2.070
- Kim JM, Son K, Yoo Y, Lee D, Kim DY. Identifying risk indicators of building damage due to typhoons. Focusing on Cases of South Korea. Sustainability. 2018 Nov;10(11):3947. https://doi.org/10.3390/su10113947
- Kim JM, Kim T, Son K, Yum SG, Ahn S. Measuring Vulnerability of Typhoon in Residential Facilities: Focusing on Typhoon Maemi in South Korea. Sustainability. 2019 Jan;11(10):2768. https://doi.org/10.3390/su11102768
- Kunreuther H, Meyer R, Vandenbulte C. Risk analysis for extreme events: Economic incentives for reducing future losses. New York (USA): National Institute of Standards and Technology; 2004 Oct. 103 p. Report No.: NIST GCR 04-871
- Wang YM, Elhag TM. A fuzzy group decision making approach for bridge risk assessment. Computers & Industrial Engineering. 2007 Aug;53(1):137-48. https://doi.org/10.1016/j.cie.2007.04.009
- Seo SE, Gang GS. Risk index computation of work type for bridge construction using accident cases and the AHP method. Proceedings of the Safety Management and Science Conference; 2009 Nov 21; Yongin, Korea. Incheon (Korea): Korea Safety Management and Science; 2009. p. 441-59.
- Hashemi H, Mousavi SM, Mojtahedi SMH. Bootstrap technique for risk analysis with interval numbers in bridge construction projects. Journal of Construction Engineering and Management. 2011 Jan;137(8):600-8. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000344
- Li QF, Li ZX, Niu J. Application of factor analysis to risk evaluation of bridge construction. Advanced Materials Research. 2011 May;243-249:1848-53. https://doi.org/10.4028/www.scientific.net/AMR.243-249.1848
- Choudhry RM, Aslam MA, Hinze JW, Arain FM. Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines. Journal of Construction Engineering and Management. 2014 Mar;140(7):401-20. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000857
- Crichton, D. Role of insurance in reducing flood risk. The Geneva Papers on Risk and Insurance-Issues and Practice, 2008 Dec;30(1):117-32. https://doi.org/10.1057/palgrave.gpp.2510151
- Yun SY, Kim CH, Kang LS. Development of model for selecting superstructure type of small size bridge using dual classification method. Journal of The Korean Society of Civil Engineers. 2015 Nov;35(6):1413-20. https://doi.org/10.12652/Ksce.2015.35.6.1413
- Jo BW, Park JC, Kim CH. Wind characteristics of existing long span bridge based on measured data. KSCE Journal of Civil Engineering. 2005 May;9(3):219-24. https://doi.org/10.1007/BF02829053
- Giroux RP. Relevance of roebling. Journal of Performance of Constructed Facilities. 2009 Feb;23(1):2-4. https://doi.org/10.1061/(ASCE)0887-3828(2009)23:1(2)
- Kim BI, Yoon KY, Lee SH. Field investigation of scour-protection methods for bridges in small size streams of central region of Korea. Journal of Korean Society of Hazard Mitigation. 2005 Mar;5(1):45-53.
- Kim KW, Park MH, Chang CH. Research on the optimum design for PSC box girder bridges using the full staging method. Journal of the Korea Institute for Structural Maintenance and Inspection. 2004 Feb;8(3):159-67.
- Lee HW, Jang JY. Design formula for launching nose of ILM bridge considering the interaction behavior with superstructure sections. Journal of the Computational Structural Engineering Institute of Korea. 2010 Aug;23(1):53-60.
- Kim SB, Cho JH. Development of the approximate cost estimating model for PSC box girder bridge based on the breakdown of standard work. Journal of the Korea Society of Civil Engineers. 2013 Mar;33(2):791-800. https://doi.org/10.12652/Ksce.2013.33.2.791
- Choi, HH, Mahadevan. S. Construction project risk assessment using existing database and project-specific information. Journal of Construction Engineering and Management. 2008 Nov;134(11):894-903. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:11(894)
- Kuo YC, Lu ST. Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects. International Journal of Project Management. 2013 Nov;31(4):602-14. https://doi.org/10.1016/j.ijproman.2012.10.003
- Chan DW, Chan AP, Lam PT, Yeung JFY, Chan JHL. Risk ranking and analysis in target cost contracts: Empirical evidence from the construction industry. International Journal of Project Management. 2011 Aug;29(6):751-63. https://doi.org/10.1016/j.ijproman.2010.08.003
- Kim JM, Kim TH, Bae JS, Son KY, Ahn SJ. Analysis of plant construction accidents and loss estimation using insurance loss records. Journal of Asian Architecture and Building Engineering. 2019 Dec;18(6):507-16. https://doi.org/10.1080/13467581.2019.1687089
- Canamares MS, Escribano BMV, Garcia MNG, Barriuso AR, Saiz AR. Occupational risk-prevention diagnosis: A study of construction SMEs in Spain. Safety science. 2017 Feb;92:104-15. https://doi.org/10.1016/j.ssci.2016.09.016