Abstract
The cooperation with other work types and designing procedure in plant industry and engineering showed clear differences from general construction industries. Current problems are that design's consistency is reduced because of the false system of interface and it ultimately causes frequency changes of design and delayed submission of final book. To solve the problems, the improvements of designing procedure were studied by focusing on the field of architectural designing and the range was limited from power plant construction industry to engineering designing field. If combining GA with the field of architectural designing and receiving data previously, it's possible to conduct expectable designing on small changes in the future, so it's expected to improve greatly cooperation with interface among the work types of power plant engineering received previously from the aspect of consistency. For the application of designing tool, a checklist, interim check will be conducted if progressed by list's division in the designing procedure, not book's completing period. In the interface among the designing work types, direct confirmation and revision must be conducted. In case of 3D modeling, the reflection of input data must be conducted from the basic designing so as to solve interferences intensively.