A Study on Improvement of Architectural Design Process on the Interface in Designing of Power Plant

발전플랜트 설계 인터페이스 중심의 건축설계절차 개선에 관한 연구

  • Lee, Gang-Ok (Division of Mechanical Engineering. Daegu University) ;
  • Kim, Da-Hee (Division of Architecture. Jungang University)
  • Received : 2019.12.24
  • Accepted : 2020.01.02
  • Published : 2020.02.28

Abstract

The cooperation with other work types and designing procedure in plant industry and engineering showed clear differences from general construction industries. Current problems are that design's consistency is reduced because of the false system of interface and it ultimately causes frequency changes of design and delayed submission of final book. To solve the problems, the improvements of designing procedure were studied by focusing on the field of architectural designing and the range was limited from power plant construction industry to engineering designing field. If combining GA with the field of architectural designing and receiving data previously, it's possible to conduct expectable designing on small changes in the future, so it's expected to improve greatly cooperation with interface among the work types of power plant engineering received previously from the aspect of consistency. For the application of designing tool, a checklist, interim check will be conducted if progressed by list's division in the designing procedure, not book's completing period. In the interface among the designing work types, direct confirmation and revision must be conducted. In case of 3D modeling, the reflection of input data must be conducted from the basic designing so as to solve interferences intensively.

Keywords

References

  1. Gu, B. H., Kim, T, H., "How to improve the use of standard codes for plant design," Korea Institute of Construction Engineering and Management. (2007)
  2. No, J. S., "Overseas plant builders plan to strengthen international competitiveness." A Thesis for a Master's, Chung-Ang University. Republic of Korea. (2005)
  3. Park, E. S., "Risk analysis and management of ePC business of overseas power plant." A Thesis for a Master's, Hanyang University. Republic of Korea. (2011)
  4. Seo, J. C., Kim, H. J., Kim, I. H., "Open BIM-based quality control measures to improve design quality during the architectural design phase." Korea Institute of Construction Engineering and Management. (2005)
  5. Son, J. H., Lee, S. H., Han, C. H., Kim, J. E., "Research on the creation of key success factors (CSF) in plant design phase, Korea Institute of Construction Engineering and Management. (2007)
  6. Oh, K. S., "Research on how to streamline collaborative design by specialization of architectural projects." A Thesis for a Master's, Chung-Ang University. Republic of Korea. (2004)
  7. Yun, J. Y., "Research on the international competitiveness of the Korean plant industry." A Thesis for a Master's, Jeonbuk National University. Republic of Korea. (2011)
  8. Lee, D. C., "Research on plant engineer training and management." A Thesis for a Master's, Hanyang University. Republic of Korea. (2004)
  9. Jun, S. H., Kang, H. W., Min, B. J., "Problems and improvement plans for each field of overseas plant EPCM work." Korea Institute of Construction Engineering and Management. (2009)