References
- Choi, S.I. (2015). "Construction Trend Briefing_2015 Start of the year Standard market unit price and Standard itemization change." Construction Economy Research Institute of Korea, CERIK, 527(-), pp. 1-11.
- JI, S.H. (2006). "Problems of Turnkey Bidding and Improvement Plan." Construction Association of Korea, CAK, pp. 1-10.
- Ha, M.S. (2008). "A Study on the Improvement of Historical Cost Data for the Application of Rational Construction Cost." Master's thesis, Kyung-il National University, Korea.
- Kim, S.J. (2001). "A Study on the Improvement of Total Cost Change Control in Private Investment Projects." Korean Journal of Construction Engineering and Management, KICEM, 11(2), pp. 119-126.
- Kim, B.Y. (2012). "The Analysis of the Major Cost-increasing Risk Factors from the Perspective of Construction Management-Focusing on Pre-construction Phases." Korean Journal of Construction Engineering and Management, KICEM, 13(2), pp. 111-121.
- Kim, Y.J., and Kim, K.R. (2010). "Improvements on the Total Project Cost Management System for SOC Projects." Korean Journal of Construction Engineering and Management, KICEM, 11(3), pp. 105-114. https://doi.org/10.6106/KJCEM.2010.11.3.105
- Kim, S.J., and Kim, N.G. (2013). "Improvement on the Total Project Cost Management System for Public Construction Project in Civil Engineering field." Korean Institute of Information Scientists and Engineers, KIISE, pp. 17-18.
- Kim, S.B. (2014). "A Study on the Improvement of Performance Cost System in Korea." Construction Economy Research Institute of Korea, CERIK, pp. 1-183.
- Lee, S.H. (2005). "Situation and Problems of Total Cost Management System-focusing on overseas cases." Korea Research Institute for Human Settlements, KRIHS, pp. 52-62.
- Lee, Y.S. (2010). "A Study on the Estimation of Construction Cost for the Efficient Financing Project." Korea Research Institute for Human Settlements, KRIHS, 62, pp. 56-69.
- Lee, Y.S., and Han, C.H. (2000). "Analysis of Project Cost Determining Process in Public Sector." Architectural Institute of Korea, AIK, 15(9), pp. 75-82.
- Yoo, I.H., and Hong, S.H. (2012). "A Study on the Need for Upgrading the Bidding Lower Rate of Qualification Review." Korea Research Institute For Construction Policy, RICON, pp. 1-50.
- William, O., and Martin, F. (2000). "Importance of Capacity Constraints to Construction Cost and Schedule." American Society of Civil Engineers, ASCE, 126(5), pp. 366-373.
- Abdelrahman, O.E., Saleh, A., and Eyad, A. (2014). "Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey." Advance in Civil Engineering, ACEM, pp. 1-11.
- Savas, B. (2017). "Duration prediction models for construction projects: In terms of cost or physical characteristics?" Korean Society of civil engineers, KSCE, 21(6), pp. 2049-2060.
- Alavipour, S.M., and David, A. (2018). "Optimizing Financing Cost in Construction Projects with Fixed Project Duration." Journal of Construction Engineering and Management, 144(4), pp. 1-13.