Acknowledgement
Supported by : 인천대학교
이 연구는 2018년도 인천대학교 교내학술연구비 지원에 의한 연구결과의 일부임
References
- Ministry of Employment and Labor (2018). Analysis of Industrial Accident Status 2017
- Ministry of Employment and Labor (2017). Analysis of Industrial Accident Status 2016
- Ministry of Employment and Labor (2016). Analysis of Industrial Accident Status 2015
- Korea Occupational Safety & Health Agency (2018). 2. A Guide of Risk Assessment Model for Explanation.
- Korea Occupational Safety & Health Agency (2011). Risk Assessment Model for Construction Work Types 8th
- Department of Defense Standard Practice System Safety (2012). MIL-STD-882E, Department of Defense United States of America
- An, S. J., & Song, S. H. (2012). "Integrated Safety Risk Assessment and Response Preparation on Construction Site Formwork Using FMECA Method", Korea Journal of Business Admimistration, vol.14, no.3, pp.39-48
- Lee, H. S., Kim, H. S., Park, M. S., Lee, K. P., & Lee, S. B. (2009). "Construction Risk Assessment Methodology Using Site Risk Influence Factors", Korean Journal of Construction Engineering and Management, KICEM, vol.10, no. 6, pp.117-126
- Ko, S.S., Song, H., & Lee, J. Y. (2004). "A Study on the Hazard of Work Types for Building Construction", Journal of the Architectural Institute of Korea, Planning and Design Section, vol. 20, no. 5, pp. 136-143
- Yu, Y. S., Choi, J. W., Kim, T. W., & Lee, C. S. (2019). "A risk Assessment Method using Disaster Influence Factors on Construction Project", Journal of Architectural Institute of Korea, planning and Design Section Vol.35, no.06
- Choi, J. W., Kim, T. W., & Lee, C. S. (2019). "Effects of Weather Factors on the Work Loss Days of the Elderly Workers" Korean Journal of Construction Engineering and Management, KICEM, vol.20, no. 1, pp. 41-51 https://doi.org/10.6106/KJCEM.2019.20.1.041
- Sin, W. S., & Son, C. S. (2018). "An Analysis on the Accident Influence Factor and Severity of Construction General Workers", Journal of Architectural Institute of Korea, Structure and Construction Section, vol. 34, no. 3, pp. 69-76
- Sin, W. S., & Son, C. S. (2018). "An Analysis on the Safety Accident Network and Risk Level of Construction Machine and Equipment", Journal of Architectural Institute of Korea, Structure and Construction Section, vol. 34, no. 5, pp. 35-42
- Kim, E. J. (2018). "Analysis on the Factors of Construction Disaster Applying the AHP" Journal of Architectural Institute of Korea, vol. 20, no.1
- Go, S., Song, H., & Lee, J. (2004). "A Study on the Hazard of Work Types for Building Construction", Journal of Architectural Institute of Korea, Structure and Construction Section, vol. 20, no. 5, pp. 137-144
- Cho, J. H. (2017). "A Study on the Application Plan of the Optimized Risk Assessment Model in Construction Field", Journal of Korea Safety Management & Science, vol. 19, no. 4,
- Peak, C. H., & Cho, U. R. (2015). "A Study on the Perception Level of Health and Safety among the Participants for Optimization of Risk Assessment in Construction Industry", Journal of Korea Safety Management & Science, vol. 17, no. 3
- Yu, Y. J., Sin, D. S., & Kim, S. G. (2009). "A Risk Assessment Method for the Small and Medium Construction Companies", Journal of Academic Conference of the Construction Management Association of Korea, pp. 428-432