References
- Amiri, M. and Mohtashami, A., "Buffer Allocation in Unreliable Production Lines based on Design of ⇒ Experiments, Simulation, and Genetic Algorithm", The International Journal of Advanced Manufacturing Technology, Vol. 62, No. 1-4, pp. 371-383, 2012. https://doi.org/10.1007/s00170-011-3802-8
- Barton, R.R. and Meckesheimer, M., "Metamodel-based Simulation Optimization", Handbooks in Operations Research and Management Science, vol. 13. pp. 535-574, 2006. https://doi.org/10.1016/S0927-0507(06)13018-2
- Bezerra, M.A., Santelli, R.E., Oliveira, E.P., Villar, L.S., Escaleira L.A., "Response Surface Methodology (RSM) as a Tool for Optimization in Analytical Chemistry", Talanta, Vol. 76, No. 5, pp. 965-977, 2008. https://doi.org/10.1016/j.talanta.2008.05.019
- Can, B, and Heavey, C., "Comparison of Experimental Designs for Simulation-based Symbolic Regression of Manufacturing Systems", Computers & Industrial Engineering, Vol. 61, No. 3, pp. 447-462, 2011. https://doi.org/10.1016/j.cie.2011.03.012
- Demir, L., Tunali, S., and Eliiyi, D.T., "The State of the Art on Buffer Allocation Problem: a Comprehensive Survey", Journal of Intelligent Manufacturing, Vol. 25, No. 3, pp. 371-392, 2014. https://doi.org/10.1007/s10845-012-0687-9
- Dengiz, B. and Akbay, K.S., "Computer Simulation of a PCB Production Line: Meta-modeling Approach", International Journal of Production Economics, Vol. 63, No. 2, pp. 195-205, 2000. https://doi.org/10.1016/S0925-5273(99)00013-4
- Durieux, S. and Pierreval, H., "Regression Metamodeling for the Design of Automated Manufacturing System Composed of Parallel Machines Sharing a Material Handling Resource", International Journal of Production Economics, Vol. 89, No. 1, pp. 21-30, 2004. https://doi.org/10.1016/S0925-5273(03)00199-3
- Geem, Z.W., Kim, J.H. and Loganathan, G.V., "A New Heuristic Optimization Algorithm: Harmony Search", Simulation, Vol. 76, No. 2, pp. 60-68, 2001. https://doi.org/10.1177/003754970107600201
- Gershwin, S.B., Manufacturing System Engineering, Prentice-Hall International, London, U.K., 1994.
- Kaveh, A., Shakouri Mahmud Abadi, A. and Zolfaghari Moghaddam, S., "An Adapted Harmony Search Based Algorithm for Facility Layout Optimization," International Journal of Civil Engineering, Vol. 10, No. 1, pp. 37-42, 2012.
- Kim, H.S., Wang, G., Shin, Y.W. and Moon, D.H., "Comparison of the Two Layout Structures in Automotive Body Shops Considering Failure Distributions", Journal of the Korean Institute of Industrial Engineers, Vol. 41, No. 5, pp. 470-480, 2015. https://doi.org/10.7232/JKIIE.2015.41.5.470
- Lee, Y.H., Shin, Y.W. and Moon, D.H., "Buffer Allocation Problem Using Meta-Model in an Automotive Body Shops with Mixed-model Production", Journal of the Korean Institute of Industrial Engineers, Vol. 46, No. 3, pp. 296-308, 2020. https://doi.org/10.7232/JKIIE.2020.46.3.296
- Manjarres, D., Landa-Torres, I., Gil-Lopez, S., Del Ser, J., Bilbao, M. N., Salcedo-Sanz, S. and Geem, Z. W., "A Survey on Applications of the Harmony Search Algorithm," Engineering Applications of Artificial Intelligence, Vol. 26, No. 8, pp. 1818-1831, 2013. https://doi.org/10.1016/j.engappai.2013.05.008
- Moon, D.H., Cho, H.I., Kim, H.S., Sunwoo, H. and Jung, J.Y., "A Case Study of the Body Shop Design in an Automotive Factory using 3D Simulation", International Journal of Production Research, Vol. 44, No. 18-19, pp. 4121-4135, 2006. https://doi.org/10.1080/00207540600806430
- Moon, D.H., Nam, Y.S. and Shin, Y.W., "Effects of Additional Sub-lines and Buffer Allocation on the System Performance in an Automotive Body Shop", Journal of the Korean Society of Supply Chain Management, Vol. 16, No. 2, pp. 135-145, 2016.
- Moon, D.H., Nam, Y.S., Kim, H.S. and Shin, Y.W., "Effect of Part Transfer Policies in Two Types of Layouts in Automotive Body Shops", International Journal of Industrial Engineering: Theory, Applications and Practice, Vol. 24, No. 2, pp. 194-206, 2017.
- Moon, D.H., Lee, Y.H. and Shin, Y.W., "The Effect of Mixed-Model Production in Automotive Body Shops Considering Assembly Methods and Part Transfer Policies", Journal of the Korean Institute of Industrial Engineers, Vol. 44, No. 5, pp. 391-403, 2018. https://doi.org/10.7232/jkiie.2018.44.5.391
- Motlagh, M.M., Azimi, P., Amiri, M. and Madraki, G., "An Efficient Simulation Optimization Methodology to Solve a Multi-objective Problem in Unreliable Unbalanced Production Lines", Expert Systems With Applications, Vol. 138, 112836, 2019. https://doi.org/10.1016/j.eswa.2019.112836
- Nahas, N., "Buffer Allocation and Preventive Maintenance Optimization in Unreliable Production Lines", Journal of Intelligent Manufacturing, Vol. 28, No. 1, pp. 85-93, 2017. https://doi.org/10.1007/s10845-014-0963-y
- Pan, Q.K., Wang, L. and Gao, L., "A Chaotic Harmony Search Algorithm for the Flow Shop Scheduling Problem with Limited Buffers," Applied Soft Computing, Vol. 11, No. 8, pp. 5270-5280, 2011. https://doi.org/10.1016/j.asoc.2011.05.033
- Papadopoulos, C.T., Li, J. and O'Kelly, M.E.J., "A Classification and Review of Timed Markov Models of Manufacturing Systems", Computers & Industrial Engineering, Vol. 128, pp. 219-244, 2019. https://doi.org/10.1016/j.cie.2018.12.019
- Remiel, F.M., Cauvin, A. and Ferrarini, A., "Conceptual Design and Simulation of an Automotive Body Shop Assembly Line", IFAC Proceedings Volumes, Vol. 47, No. 3, pp. 760-765, 2014. https://doi.org/10.3182/20140824-6-ZA-1003.01576
- Simpson, T.W., Peplinski, J.D., Koch, P.N., Allen, J.K., "Metamodels for Computer-based Engineering Design: Survey and recommendations", Engineering with Computers, Vol. 17, No. 2, pp. 129-150, 2001. https://doi.org/10.1007/PL00007198
- Spieckermann, S., Gutenschwager, K., Heinzel, H. and VoB, S., "Simulation-based Optimization in the Automotive Industry - A Case Study on Body Shop Design", Simulation, Vol. 75, No. 5, pp. 276-286, 2000.
- Standridge, C. and Kleijnen, J. P. C. (1988), Experimental Design and Regression Analysis, European Journal of Operational Research, Vol. 33, No. 3, pp. 257-261, 1988. https://doi.org/10.1016/0377-2217(88)90168-3
- Ulgen, O., Gunal, A., Grajo, E. and Shore, J., "The Role of Simulation in Design and Operation of Body and Paint Shops in Vehicle Assembly Plants", Proceedings of the European Simulation Symposium, Society of Computer Simulation International, Istanbul, Turkey, pp. 124-128, 1994.
- Weiss, S., Schwarz, J.A. and Stolletz, R., "The Buffer Allocation Problem in Production Lines: Formulations, Solution Methods, and Instances", IISE Transactions, Vol. 51, No. 5, pp. 456-485, 2019. https://doi.org/10.1080/24725854.2018.1442031
- Yang X. S., "Harmony Search as a Metaheuristic Algorithm", In: Geem Z.W. (eds) Music-Inspired Harmony Search Algorithm. Studies in Computational Intelligence, Vol. 191, pp.1-18, Springer, Berlin, Heidelberg, 2009.
- Zandieh, M., Joreir-Ahmadi, M.N. and Fadaei-Rafsanjani, A., "Buffer Allocation Problem and Preventive Maintenance Planning in Non-homogenous Unreliable Production Lines", The International Journal of Advanced Manufacturing Technology, Vol. 91, No. 5-8, pp. 2581-2593, 2017. https://doi.org/10.1007/s00170-016-9744-4
- MATLAB® Ver.R2018a
- MINITAB® Ver.19.2020.1