Acknowledgement
The national project "Development of the Simulation-Based Production Management System for Middle-Sized Shipbuilding Companies" (no. 10050495), which is supported by the industry core technology development business of the Ministry of Trade, Industry and Energy (Rep. of Korea), supported this research. The national project “Development of Smart Factory with Artificial Intelligent Forming Machine” (no. 10077588), which is supported by the industry core technology development business of the Ministry of Trade, Industry and Energy (Rep. of Korea), supported this research. This research was also a product of the “Development of Production Strategy for Optimizing Cost of Marine Ships and Execution Simulation Technology” (no. S1106-16-1020) of the ICT Convergence Industry 4.0S (Naval Architecture & Ocean Engineering) Technology Development Projects supported by the Ministry of Science, ICT and Future Planning (Rep. of Korea).
References
- Cho, K.K., Oh, J.S., Ryu, K.R., Choi, H.R., 1998. An integrated process planning and scheduling system for block assembly in shipbuilding. CIRP Annal. 47 (1), 419-422. https://doi.org/10.1016/S0007-8506(07)62865-0
- Jeong, K.Y., 2000. Conceptual frame for development of optimized simulation-based scheduling systems. Expert Syst. Appl. 18 (4), 299-306. https://doi.org/10.1016/S0957-4174(00)00011-7
- Jeong, Y.K., Woo, J.H., Oh, D.K., Shin, J.G., 2016. A shipyard simulation system using the process-centric simulation modeling methodology: case study of the simulation model for the shipyard master plan validation. Korean J. Comp. Des. Eng. 21 (2), 204-214. https://doi.org/10.7315/CADCAM.2016.204
- Kim, H., Lee, S.S., Park, J.H., Lee, J.G., 2005. A model for a simulation-based shipbuilding system in a shipyard manufacturing process. Int. J. Comput. Integr. Manuf. 18 (6), 427-441. https://doi.org/10.1080/09511920500064789
- Koenig, P.C., Narita, H., Baba, K., 2002. Lean production in the Japanese shipbuilding industry. J. Ship Prod. 18 (3), 167-174. https://doi.org/10.5957/jsp.2002.18.3.167
- Kutanoglu, E., Sabuncuoglu, I., 2001. Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop. J. Manuf. Syst. 20 (4), 264-279. https://doi.org/10.1016/S0278-6125(01)80046-7
- Lee, J.K., Lee, K.J., Hong, J.S., Kim, W., Kim, E.Y., Choi, S.Y., Kim, H.D., Yang, O.R., Choi, H.R., 1995. Das: Intelligent scheduling systems for shipbuilding. AI Mag. 16(4), 78-94.
- Lee, J.K., Lee, K.J., Park, H.K., Hong, J.S., Lee, J.S., 1997. Developing scheduling systems for Daewoo Shipbuilding: DAS project. Eur. J. Oper. Res. 97 (2), 380-395. https://doi.org/10.1016/S0377-2217(96)00205-6
- Lee, D.K., Kim, Y., Hwang, I.H., Oh, D.K., Shin, J.G., 2014. Study on a process-centric modeling methodology for virtual manufacturing of ships and offshore structures in shipyards. Int. J. Adv. Manuf. Technol. 71 (1-4), 621-633. https://doi.org/10.1007/s00170-013-5498-4
- Liu, Z., Chua, D.K.H., Yeoh, K.W., 2011. Aggregate production planning for shipbuilding with variation-inventory trade-offs. Int. J. Prod. Res. 49 (20), 6249-6272. https://doi.org/10.1080/00207543.2010.527388
- Lynch, N., Vaandrager, F., 1995. Forward and backward simulations. Inf. Comput. 121(2), 214-233. https://doi.org/10.1006/inco.1995.1134
- Musselman, K., O'Reilly, J., Duket, S., 2002. Supply chain planning: the role of simulation in advanced planning and scheduling. In: Proc. 2002 Winter Simul. Conf., pp. 1825-1830.
- Nam, S.H., Shen, H.Q., Ryu, C.H., Shin, J.G., 2018. SCP-Matrix based shipyard APS design: application to long-term production plan. Int. J. Nav. Archit. Ocean. Eng. 10 (6), 741-761. https://doi.org/10.1016/j.ijnaoe.2017.10.003
- Neumann, R.J., McQuaide, D.J., 1991. Implementation of PC-Based Project Management in an Integrated Planning Process (The National Shipbuilding Research Program) (No. NSRP-0340). National Steel And Shipbuilding Co., San Diego, CA.
- Park, B.C., Park, E.S., Choi, B.K., Kim, B.H., Lee, J.H., 2008. Simulation based planning and scheduling system for TFT-LCD fab. In: Proc. 2002 Winter Simul. Conf., pp. 2271-2276.
- Seo, J.C., Chung, Y.H., Kim, B.H., Park, S.C., 2016. Backward capacity-filtering for electronics Fabs. Prod. Plann. Contr. 27 (11), 925-933. https://doi.org/10.1080/09537287.2016.1164349
- Spicknall, M.H., 1997. Scheduling Methods for Ship Build Strategy Development. Literature Search and Research Report.
- Watson, E.F., Medeiros, D.J., Sadowski, R.P., 1995. Order-release planning using variable lead times based on a backward simulation model. Int. J. Prod. Res. 33(10), 2867-2888. https://doi.org/10.1080/00207549508904850
- Woo, J.H., Lee, K.K., Jung, H.R., Kwon, Y.D., Shin, J.G., 2005. A framework of plant simulation for a construction of a digital shipyard. J. Soc. Nav. Archit. Korea 42(2), 165-174. https://doi.org/10.3744/SNAK.2005.42.2.165
- Zhu, D.F., Zheng, Z., Gao, X.Q., 2010. Intelligent optimization-based production planning and simulation analysis for steelmaking and continuous casting process. Int. J. Iron Steel Res. 17 (9), 19-30.
Cited by
- Simulation-based planning system for shipbuilding vol.33, pp.6, 2020, https://doi.org/10.1080/0951192x.2020.1775304