DOI QR코드

DOI QR Code

Geometry-to-BIM Mapping Rule Definition for Building Plane BIM object

건축물 평면 형상에 대한 형상-to-BIM 맵핑 규칙 정의

  • Kang, Tae-Wook (Department of Future Technology and Convergence Research, Korea Institute of Civil Engineering and Building Technology)
  • 강태욱 (한국건설기술연구원 미래융합연구본부)
  • Received : 2019.05.08
  • Accepted : 2019.10.04
  • Published : 2019.10.31

Abstract

Recently, scanning projects have been carried out in various construction and construction fields for maintenance purposes. The point cloud generated by the scan results is composed of a number of points representing the object to be scanned. The process of extracting the necessary information, including dimensions, from such scan data is called paradox. The reverse engineering process of modeling a point cloud as BIM involves considerable manual work. Owing to the time-consuming reverse engineering nature of the work, the costs increase exponentially when rework requests are made, such as design changes. Reverse engineering automation technology can help improve these problems. On the other hand, the reverse design product is variable depending on the use, and the kind and detail level of the product may be different. This paper proposes the G2BM (Geometry-to-BIM mapping) rule definition method that automatically maps a BIM object from a primitive geometry to a BIM object. G2BM proposes a process definition and a customization method for reverse engineering BIM objects that consider the use case variability.

최근 유지보수 등의 목적으로 다양한 건설 및 건축 분야에서 스캔 프로젝트가 수행되고 있다. 스캔된 결과로 생선된 포인트 클라우드는 스캔 대상물을 표현하는 수많은 점들로 구성되어 있다. 이런 스캔 데이터에서 치수를 포함한 필요한 정보를 추출하는 과정을 역설계라 한다. 포인트 클라우드를 BIM으로 모델링하는 역설계 과정은 수많은 수작업이 포함되어 있다. 시간이 많이 소모되는 역설계 작업 특성상 설계변경 같은 재작업 요청이 발생되면 비용은 기하급수적으로 증가한다. 역설계 자동화 기술이 이런 문제를 개선하는 데 도움을 줄 수 있다. 하지만, 역설계 산출물은 유스케이스에 따라 가변성을 가지며, 산출물의 종류와 상세수준은 달라질 수 있다. 이런 점을 고려해, 본 연구는 건축물 평면객체 기본 형상(primitive geometry)에서 BIM객체로 자동 맵핑하는 G2BM(Geometry-to-BIM mapping) 규칙 정의 방법을 제안한다. G2BM는 사용자 활용사례 가변성을 고려한 건축물 평면 BIM객체 역설계 프로세스 정의와 사용자화 방안을 제안한다. 그리고, 프로토타입을 통해 이에 대한 효과를 확인한다.

Keywords

References

  1. T.W. Kang, "BIM-based Smart Facility Management Framework for Existing Buildings", Review of Architecture and Building Science, Vol.62, No.6 pp.37-42, 2018.
  2. S.S. Lee, S.W. Kwon, "A Study on Optimal Laser Scanning method for Reverse Engineering at Interior Remodeling Project", Korea Journal of Construction Engineering and Management, Vol1.5, No.3, pp.3-11, 2014. DOI: http://dx.doi.org/10.6106/KJCEM.2014.15.3.003
  3. T.W. Kang, J.E. Kim, T.S. Jung, "Study on 3D Reverse Engineering-based MEP Facility Management Improvement Method", Journal of the Korea Academia-Industrial Society, Vol1.7, No.8, pp.38-45, 2016. DOI: http://dx.doi.org/10.5762/KAIS.2016.17.8.38
  4. T.W. Kang, "System Architecture for Point Cloud-based Reverse Engineering of Architectural MEP Object", Korea Journal of Construction Engineering and Management, Vol.2, pp.1-10, 2014. DOI: http://dx.doi.org/10.5762/KAIS.2014.15.9.5870
  5. J.E. Kim, "Large Point Cloud-based Pipe Shape Reverse Engineering Automation Method", Journal of the Korea Academia-Industrial Society, Vol1.7, No.3, pp.692-698, 2016. DOI: http://dx.doi.org/10.5762/KAIS.2016.17.3.692
  6. T.W. Kang, "Study on 3D Image Scan-based MEP Facility Management Technology", Korea Institute of BIM, Vol.6, No.4, pp.18-26, 2016 DOI: http://dx.doi.org/10.13161/kibim.2016.6.4.018
  7. J.H Chae, J.Y. Lee, "Definition of 3D Modeling Level of Detail in BIM Regeneration Through Reverse Engineering - Case Study on 3D Modeling Using Terrestrial LiDAR", Korea Institute of BIM, Vol.7, No.4, pp.8-20, 2018 DOI: https://doi.org/10.13161/kibim.2017.7.4.008
  8. K.R. Jung, B.D. Lee, T.H. Kim, "Engineering Construction With High-Precision Survey Equipment (3D laser scanner, 3D photo scanner, drone)", The Korea Institute of Building Construction, Vol.9, No.1, pp.133-134