Abstract
An emergency generator is key equipment for fire-fighting to supply power to fire-fighting facilities, which protect property and people in cases of fire accidents. A rated load test for emergency generators must be carried out by connecting an emergency load to the generator in accordance with related regulations. However, a no-load test has been performed for emergency generators in general since serious problems can occur when the main power is cut off, including the damage of customer devices and shut down of critical loads. Therefore, this paper proposes a load test method for an emergency generator using energy storage system (ESS) without the interruption of main power. The emergency power system was also modeled based on PSCAD/EMTDC software, and a 200-kW scale ESS load test device was implemented. The simulation and test results show that the load test method is useful and practical for an emergency power supply system.
소방용 비상발전기는 화재 시 인명과 재산을 보호하는 소방 시설에 전원을 공급하는 중요한 설비이다. 이러한 중요성에 따라 관련 법규에서는 의무적으로 비상발전기에 비상용 부하를 연결하여 시험하도록 규정하고 있다. 그러나 실 계통에서는 비상전원계통의 부하운전 시험을 위해 상용 전원을 차단하는 경우 저압기기의 파손, 병원과 같은 중요시설의 응급부하 정지 등 심각한 문제점이 발생할 수 있어, 무부하로 비상발전기를 형식적으로 시험하고 있는 실정이다. 따라서, 본 논문에서는 상기의 문제점을 개선하기 위하여, 상용 전원의 차단 없이 비상발전기에 전기저장장치를 연계하여, 비상용부하의 동작특성과 동일하게 ESS가 충전동작을 수행함으로서 비상발전기의 성능 및 상태를 시험할 수 있는 방안을 제시한다. 또한, 배전계통 상용 해석 프로그램인 PSCAD/EMTDC를 이용하여, 비상발전기, 비상용부하, ESS 부하시험장치로 구성된 비상전원계통의 모델링을 제시하고, 20kW급 ESS 부하시험장치를 구현하여, 이를 바탕으로 다양한 시나리오에 따른 시뮬레이션과 시험을 수행하여 본 논문에서 제안한 ESS 부하시험 장치와 모델링의 유용성을 확인한다.