터널 에너지 라이닝 시스템의 활용에 관하여 - 해외 사례를 중심으로 -

  • Published : 2019.03.16

Abstract

Keywords

References

  1. Adam D. and Markiewicz R. (2009), Energy from earth-coupled structures, foundations, tunnels and sewers. Geotechnique 59(3): 229-236. https://doi.org/10.1680/geot.2009.59.3.229
  2. Brandl, H. (2006), Energy foundation and other thermos-active ground structures, Geotechnique, vol. 56(2): 81-122. https://doi.org/10.1680/geot.2006.56.2.81
  3. Jan Niklas Franzius and Norbert Pralle (2011), Turning segmental tunnels into sources of renewable energy. Proceedings of Institute of Civil Engineers 164: 35-40.
  4. Jan Niklas Franzius(2011), Energy lining segment design & construction for harvesting energy from TBM tunnels, Geothermal workshop Londong.
  5. Nicholson, D. (2017), Taking the heat part 1.
  6. Nicholson, D. (2017), Taking the heat part 2.
  7. United Nations, Department of Economic and Social Affairs, Population Division (2014). World Urbanization Prospects: The 2014 Revision, Highlights (ST/ESA/SER.A/352).
  8. Zhang, G. (2014), Experimental study on the thermal performance of tunnel lining ground heat exchangers. Energy and buildings, 77:149-157. https://doi.org/10.1016/j.enbuild.2014.03.043