DOI QR코드

DOI QR Code

Revision of Feasibility Evaluation Guideline for Agricultural Infrastructure Improvement Project Using AHP Approach

AHP를 이용한 농업생산기반정비사업 타당성평가 개선방안

  • Yun, Sung-wuk (Department of Food and Resource Economics, Pusan National University) ;
  • Lee, Seok-joo (Rural Research Institute) ;
  • Lee, Han-sung (Department of Food and Resource Economics, Pusan National University) ;
  • Chung, Won-ho (Department of Food and Resource Economics, Pusan National University)
  • 윤성욱 (부산대학교 식품자원경제학과) ;
  • 이석주 (농어촌연구원) ;
  • 이한성 (부산대학교 식품자원경제학과) ;
  • 정원호 (부산대학교 식품자원경제학과)
  • Received : 2019.03.12
  • Accepted : 2019.04.11
  • Published : 2019.05.31

Abstract

This study revises current feasibility evaluation guideline for agricultural infrastructure improvement project considering recent changes in social and economic environment in rural area. We use an AHP(Analytic Hierarchy Process) approach to consider qualitative evaluation items in policy enforcement and balanced regional development as well as quantitative items in current economic analysis in the process of feasibility evaluation and decision making. The criteria system is composed of three level hierarchy. In the first level which consists of economic analysis, policy analysis, and regional development analysis, economic analysis was ranked top with relative weight of 0.45 and regional development analysis the lowest with 0.22. In the second level which consists of three evaluation items under policy analysis, consistency in policy enforcement, risk factors, and special evaluation factors, consistency in policy enforcement was ranked top. Finally, 13 detailed evaluation items in the third level were surveyed and ranked by using a comprehensive criticality vector. The result shows that the three most important evaluation items are 'degree of underdevelopment', 'spill-over effect of regional economy' and 'consistency with related planning and policy direction'.

Keywords

References

  1. National Institute of Meteorological Research, 2018, "Climate change over 100 years on the Korean Peninsula".
  2. Lim, J. H., Han, S. H., 1999, "Analysis of Industrial Linkage Effects for Farm Land Base Development Project", Korean Journal of Agricultural Science.
  3. Yun, J. W., Chae, Y. W., 2018, "A Priority Analysis on the Agricultural R&D Projects by using Analytic Hierarchy Process", Korean journal of food marketing economics.
  4. Seo, D. S. et al., Kim, Y. J., 2016, "A Study on Priority of Policy for Smart Farming System Using AHP Approach", Journal of the Korea Academia-Industrial cooperation Society.
  5. Thomas L. Saaty, 1990, "Decision making for leaders" RWS Publications.
  6. Lee, S. K., 2014, "Public investment Analysis", Jyphyunjae, p.396.
  7. Cho, D. H., Shin, Y. C., 2004, "Preliminary Feasibility Study for the National Asian Culture Exhibition".
  8. Kang H. G. et al., 2015, "Preliminary Feasibility Evaluation for Building Innovative Clusters on the Internet of Things in Bitgaram".
  9. Cheon J. Y. et al., 2016, "A Study on Prioritizing Food Policy: Application of AHP", Korea Journal of Agricultural Management and Policy, 43(1): 130-151.
  10. Saaty, T. L., 1980, The Analytic Hierarchy Process, New York.
  11. Yeom, J. H., Park, G. H., 1991, "Policy inconsistency and dilemma", The Korean Association for Public Administration Academic Publications, 141-168.
  12. Ministry of Agriculture, Food and Rural Affairs, 2012, "2012 General Rural and Fishing Village Development Business manual".
  13. Kim, S. J. et al., 2013, "A Study on Development of Vulnerability Assessment Criteria for Agricultural Infrastructure According to Climate Change", Journal of Agriculture & Life Sciences, 47(1): 205-213.
  14. Lee, H. S., 2006, "An Analysis on Priority Determining Criteria among Integrated Development Projects in Rural Villages Using AHP", Korea Journal of Agricultural Management and Policy, 33(1): 183-197.
  15. The Korean Society of Agricultural Engineers.Korea Rural Community Corporation.Ministry of Agriculture and Forestry, 1998, "Code for design of agricultural production-based readjustment project plan : Waterway".
  16. The Korean Society of Agricultural Engineers, 2006, "Code for design of agricultural production-based readjustment project plan : Cultivation".