참고문헌
- Abanda, F.H., Tah, J.H.M., Cheung, F.K.T. (2017). BIM in off-site manufacturing for buildings. Journal of Building Engineering, 14, pp.89-102. https://doi.org/10.1016/j.jobe.2017.10.002
- Lu, N., Korman, T. (2010). Implementation of building information modeling (BIM) in modular construction: Benefits and challenges. In Construction Research Congress 2010: Innovation for Reshaping Construction Practice, pp.1136-1145
- Nawari, N.O. (2012). BIM standard in off-site construction. Journal of Architectural Engineering, 18(2), pp.107-113. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000056
- Lee, M.D. (2019). Analysis of BIM Utilization for On-site Construction Planning in Modular Construction Project. Journal of the Korea Institute of Building Construction, 19(3), pp.263-272. https://doi.org/10.5345/JKIBC.2019.19.3.263
- Shin, H.K., Ahn, Y.H. (2018). Building Information Modeling (BIM) Application for Modular Construction Projects in the Pre-construction Stage. Proceeding of Annual Conference of Korea Institute of Construction Engineering and Management, 11, pp.149-150.
- Eastman, C., Teicholz, P., Sacks, R., Liston, K. (2011). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. John Wiley & Sons. 611p.
- Lee, J.S. (2017). BIM-based 4D simulation framework to improve module manufacturing productivity for modular construction projects [Ph.D. thesis]. Hanyang University, Korea.
- Alwisy, A., Al-Hussein, M. (2010). Automation in drafting and design for modular construction manufacturing utilizing 2D CAD and parametric modeling. In Proc., Computing in Civil and Building Engineering, Proc., Int. Conf.
- Ezcan, V., Isikdag, U., Goulding, J. (2013). BIM and off-site manufacturing: recent research and opportunities. In 19th CIB World Building Congress Brisbane, Australia.
- Han, S.H. (2014). BIM-based motion planning of mobile crane operation in modular-based heavy construction sites [Ph.D. thesis]. University of Alberta, USA.
- Han, S.H., Al-Hussein, M., Al-Jibouri, S., Yu, H. (2012). Automated post-simulation visualization of modular building production assembly line. Automation in construction, 21, pp.229-236. https://doi.org/10.1016/j.autcon.2011.06.007
- Han, S.H., Hasan, S., Bouferguene, A., Al-Hussein, M., Kosa, J. (2014). Utilization of 3D visualization of mobile crane operations for modular construction on-site assembly. Journal of Management in Engineering, 31(5), 04014080. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000317
- Samarasinghe, T., Mendis, P., Ngo, T., Fernando, W. J. B. S. (2015). BIM software framework for prefabricated construction: case study demonstrating BIM implementation on a modular house. In 6th International Conference On Structural Engineering And Construction Management, pp.154-162.
- Korman, T.M., Lu, N. (2011). Innovation and improvements of mechanical, electrical, and plumbing systems for modular construction using building information modeling. In AEI 2011: Building Integration Solutions, pp.448-455.
- Moghadam, M., Alwisy, A., Al-Hussein, M. (2012). Integrated BIM/Lean base production line schedule model for modular construction manufacturing. In Construction Research Congress 2012: Construction Challenges in a Flat World, pp.1271-1280.
- Solnosky, R.L., Memari, A.M., Ramaji, I.J. (2014). Structural BIM processes for modular multi-story buildings in design and construction. In 2nd residential building design & construction conference, pp.201-215.
- Min Woong Kim, In Ho Hwang, Jong Ho Ock. (2013). A Study on Modular System Efficiency usign 5D BIM Tool. Proceeding of Annual Conference of Korea Institute of Building Construction, 13(1), pp.208-209.
- Kim, M.W., Jo, B.S., Ock, J.H. (2013). BIM based Life Cycle Mangement Plan for the Unit Modular Method. Korea Institute of Construction Engineering and Management, 11, pp.113-114
- Yoon, S.H., Choi, J.W., Cho, S.Y. (2013). A Design and Development of a Temporary Housing System Based on BIM in Advance of Disasters. Journal of the Korean housing association, 24(1), pp.69-78. https://doi.org/10.6107/JKHA.2013.24.1.069
- Bong, G.S., Seong, J.B., Seok, H.Y. (2013). A Study on the Reduction Plan About Prefabricated Wall Construction Error Rates for BIM-based Modular Construction. Proceeding of Annual Conference of The Korea Institute of Building Construction, 13(1), pp.213-214.
- Jung, Y.H., Ham, N.H., Kim, J,J. (2012). BIM-based modular housing Study on the strategies and deriving techniques. Proceeding of Annual Conference of the Architectural Institute of Korea,, 32(2), pp.185-186.
- Cho, S.Y., Choi, J.W., Yun, S.H. (2012). A System Development of Modular Housing and Town for Disaster Based on Building Information Modeling. Proceeding of Annual Conference of Korean Housing Association, 4. pp.261-266.
- Seo, B.K., Yun, S.H. (2014). BIM based Optimize Method of Finish Material Placing for Modular Unit. Journal of the Architectural Institute of Korea Structure & Construction, 30(3), pp.97-104. https://doi.org/10.5659/JAIK_SC.2014.30.3.097
- Choi, C.S., Jung, J.H., Koh, C.K. (2016) Basic Research on the Modular-based BIM Library customized for the Elderly Housing. Journal of the Korean Institute of Culture Architecture, 55, pp.145-152.
- Sel, U.J., Wang, U.C., Jung, J.S., Back, J.H., Lim, S.H. (2016). A Study on Considerations for BIM planning of Modular Building. Proceeding of Annual Conference of the Architectural Institute of Korea, pp.25-26.
- Lee, G.K., Lim, S.H. (2011). A Study on the Development of BIM Library about Modular Urban-type Housing. Proceeding of Annual Conference of Korean Housing Association, pp.39-44.
- Lee, C.J., Lim, S.H. (2012). A Study on Development of BIM Library for Unit Modular Housing - Focused on Small-sized Urban-life-housing. The Korean Housing Association. 23(6), pp.11-21
- Anumba, C., Dubler, C., Goodman, S., Kasprzak, C., Kreider, R., Messner, J., Saluja, C., Zikic, N. (2010). The BIM project execution planning guide and templates-version 2.0. University Park, PA: CIC Research Group, Department of Architectural Engineering, The Pennsylvania State University.
- Public Procurement Service. Basic guidelines of the facility business BIM Application v1.31. Korea: Public Procurement Service.
- Field, A. (2009). Discovering statistics using SPSS. 3rd ed. London: Sage, 854p.
- Jun, K.H., Yun, S.H. (2011). Development construction object library for BIM based building construction planning. Journal of the Architectural Institute of Korea Structure and Construction. 27(9), pp.143-51.
- Lee, J.W., Cho, K.M., Kim, T.H. (2017). Identifying construction engineering tasks at the design phase for enhancing constructability in high-rise building construction-focused on temporary work. Journal of the Architectural Institute of Korea Structure and Construction. 17(5), pp.453-63.