Fig. 1. Daily Generation pattern of WP & PV (’14~’16). 그림 1. WP와 PV의 일일발전량 패턴(’14~’16)
Fig. 2. Algorithm of setting scheme of constraints. 그림 2. 출력량 분배방안 알고리즘
Fig. 3. Pro-rate of constraints by power source. 그림 3. 발전원별 제한량 배분
Fig. 4. Pro-rate of constraints by generation unity. 그림 4. 발전소별 제한량 배분
Table 1. Installation capacity of WP and PV in Jeju. 표 1. 제주지역 WP와 PV의 설치 용량
Table 2. Case of curtailment of WP in Jeju. 표 2. 제주지역 풍력발전의 출력 제한 사례
Table 3. Order of curtailment in US. 표 3. 미국의 출력 제한 순서
Table 4. Installation capacity and CF of RE(’18~’21). 표 4. 재생에너지의 설치용량과 이용률(’18~’21)
Table 5. Pro-rate of constraints by power source(2018). 표 5. 발전원별 출력제한 할당(2018)
Table 6. Plant-specific allocation by criterion in 2018. 표 6. 기준에 의한 출력 제한의 분배(2018)
Table 7. Redistribution by over-allocation 2018. 표 7. 과잉할당에 대한 재분배(2018)
Table 8. Pro-rate of constraints by power source(2021). 표 8. 발전원별 출력제한 분배(2021)
Table 9. Estimation of constraint of WPi by criteria in 2021. 표 9. 기준에 의한 WPi에 대한 출력제한의 산정(2021)
Table 10. Estimation of constraint of PVi by criteria in 2021. 표 10. 기준에 의한 PVi에 대한 출력제한의 산정(2021)
Table 11. Allocation of constraint of PVi(2021). 표 11. PVi 출력제한 할당(2021)
References
- Lori Bird, "wind and solar energy curtailment: A review of international experience," Renewable and sustainable Energy Review, pp. 577-586, 2016. DOI: 10.1016/j.rser.2016.06.082
- H. S Myung, S. H Kim, "Analysis of the Load Contribution of Wind Power and Photovoltaic Power to Power system in Jeju," KSES Vol. 38, No. 1, pp. 13-24, 2018. DOI: 10.7836/kses.2018.38.1.013
- Korea Power Exchange, Operational Report of Power System in Jeju, KPX, 2018.
- Report of Installation capacity of PV in jeju, Jeju office, 2018.
- Carbon Free Island Jeju by 2030, Jeju Special Self-Governing Province, 2017.
- Y. H Kim, S. H Kim, Operation Plan of ESS for Increase of Acceptable Product of Renewable Energy to Power System, KIEE, Vol. 67, No. 11, pp. 1401-1407, 2018.
- Lori Bird, "Wind and Solar Energy Curtailment: Experience and Practices in the US," NREL, 2014.