DOI QR코드

DOI QR Code

Analyzing the Relationship between Dynamic Capability of Project-Based Organization and the Competitive Advantage in the E&C Companies

프로젝트 조직의 동적역량과 건설기업 경쟁우위와의 상관관계 분석

  • Jin, Sangjoon (Graduate School of Business Administration, Hanyang University) ;
  • Oh, Minjeong (Graduate School of Business Administration, Hanyang University) ;
  • Kim, Seungchul (Department of Business Administration, Hanyang University)
  • Received : 2018.09.05
  • Accepted : 2018.10.15
  • Published : 2019.01.31

Abstract

Since the beginning of a new century, many Korean construction and engineering companies are facing a very dynamic and fast changing business environment which includes severe competition, higher risk, economic depression, declining revenues and profits, etc. In order to cope with these challenges, they need to secure special capabilities to actively adapt to the paradigm changes. One of those capabilities could be project management capability which allows us to manage organizational resources dynamically and integratively based on project portfolio management concept. The objective of this study is to investigate how the dynamic capability of a project-based organization to control the resource affects the firm performance and the competitive advantages. Data was collected from the construction and engineering companies in South Korea by using survey questionnaire, and analyzed for empirical tests by using statistical methods such as structural equation modelling and path analysis. The results showed that the organizational resources, if they had the VRIN characteristics, would have positive impacts on creating the dynamic capabilities for project organization. In turn, the dynamic capabilities of a project organization would have impacts on improving business performance and creating competitive advantages. Also, it was found that the organizational resources may have direct impact on business performance and competitive advantages. The academic contribution of this study is that it attempts to integrate resource based view and the dynamic capability theory about creating competitive advantages for project based organization. This study also provided practical implications to the companies in construction industry by showing how to use organizational resources strategically to create competitive advantages.

2000년대 이후 많은 한국의 건설 및 엔지니어링 기업들은 급속하게 변화하는 동적환경에서 경쟁 심화, 높은 리스크, 경기 침체, 실적 부진, 이윤 감소 등의 어려움에 직면해 있다. 이러한 도전을 극복하기 위해서는 패러다임 변화에 적극적으로 대응할 수 있는 특별한 역량의 확보가 요구된다. 그 중 하나가 프로젝트 포트폴리오 기반에서 기업 내 조직자원을 적극적이고 통합적으로 관리할 수 있는 프로젝트관리 역량이라고 할 수 있다. 본 연구의 목적은 기업 내 프로젝트 조직자원의 동적역량이 기업의 경쟁우위와 성과에 어떤 영향을 미치는 지를 조사하는 데 있다. 국내 건설 및 엔지니어링 기업의 프로젝트 조직에서 근무하는 직원을 대상으로 설문 자료를 분석하고 구조방정식 모형과 경로분석 등의 통계분석을 통해서 이를 실증하였다. VRIN 조직자원과 조직 동적역량간의 영향을 분석한 결과, VRIN 특성의 프로젝트 조직자원을 보유하고 있다면 프로젝트 조직의 동적역량에 유의한 영향을 미치는 것으로 나타났고, 프로젝트 조직의 동적역량도 기업의 경영성과를 개선하고 경쟁우위를 창출하는데 긍정적인 영향을 미치는 것으로 나타났다. 또한 조직자원은 기업의 경쟁우위와 성과에 직접적인 영향을 끼치며 조직 동적역량이 VRIN 속성의 조직자원과 경쟁우위 사이에서 매개효과의 영향이 있는 것으로 확인되었다. 본 연구가 학문적으로는 자원기반관점과 동적역량관점을 통합하는 입장에서 프로젝트 조직자원이 기업의 경쟁우위에 미치는 영향을 실증하고 프로젝트관리의 학문적 영역을 확장하는데 기여하였다. 실무적으로는, 건설 및 엔지니어링 산업에서 경쟁우위를 확보하기 위하여 기업들이 전략적으로 어떻게 프로젝트 조직자원을 활용해야 하는지에 대한 구체적인 방안을 제시하였다.

Keywords

GGRHC4_2019_v20n1_73_f0001.png 이미지

Fig. 1. Research Model

Table 1. Comparison between RBV and DCV

GGRHC4_2019_v20n1_73_t0001.png 이미지

Table. 2. Operational definition of variables

GGRHC4_2019_v20n1_73_t0002.png 이미지

Table. 3. Operational characteristics of respondents (n=167)

GGRHC4_2019_v20n1_73_t0003.png 이미지

Table 4. Confirmatory factor & convergent validity analysis

GGRHC4_2019_v20n1_73_t0004.png 이미지

Table 5. Reliability analysis

GGRHC4_2019_v20n1_73_t0005.png 이미지

Table 6. Discriminant validity analysis

GGRHC4_2019_v20n1_73_t0006.png 이미지

Table 7. Path analysis

GGRHC4_2019_v20n1_73_t0007.png 이미지

Table. 8. Result of regression : H8

GGRHC4_2019_v20n1_73_t0008.png 이미지

Table 9. Result of regression : H9

GGRHC4_2019_v20n1_73_t0009.png 이미지

References

  1. Ambrosini, V., Bowman, C., and Collier, N. (2009). "Dynamic capabilities: an exploration of how firms renew their resource base." British Journal of Management, 20, pp. 9-24. https://doi.org/10.1111/j.1467-8551.2008.00610.x
  2. Aubry, M., and Hobbs, B. (2011). "A fresh look at the contribution of project management to organizational performance." Project Management Journal, 42(1), pp. 3-16. https://doi.org/10.1002/pmj.20213
  3. Barney, J. B. (1986). "Organizational culture: can it be a source of sustained competitive advantage?" Academy of management review, 11(3), pp. 656-665. https://doi.org/10.5465/amr.1986.4306261
  4. Barney, J. (1991). "Firm resources and sustained competitive advantage." Journal of management, 17(1), pp. 99-120. https://doi.org/10.1177/014920639101700108
  5. Barney, Jay B., and Clark, Delwyn N. (2007). Resource-based theory: Creating and sustaining competitive advantage. Oxford University Press on Demand.
  6. Barney, J. B., and Hesterly, W. S. (2013). Strategic management and competitive advantage. 4th Edition, Upper Saddle River, NJ: Pearson Prentice Hall.
  7. Bredin, K. (2008). "People capability of project-based organisations: A conceptual framework." International Journal of Project Management, 26(5), pp. 566-576. https://doi.org/10.1016/j.ijproman.2008.05.002
  8. Burgelman, R. A. (1991). "Intraorganizational ecology of strategy making and organizational adaptation: Theory and field research." Organization science, 2(3), pp. 239-262. https://doi.org/10.1287/orsc.2.3.239
  9. Cardeal, N., and Antonio, N. S. (2012). "Valuable, rare, inimitable resources and organization (VRIO) resources or valuable, rare, inimitable resources (VRI) capabilities: What leads to competitive advantage?"
  10. Cepeda, G., and Vera, D. (2007). "Dynamic capabilities and operational capabilities: A knowledge management perspective." Journal of business research, 60(5), pp. 426-437. https://doi.org/10.1016/j.jbusres.2007.01.013
  11. Chandler, A. D. (1990). Strategy and structure: Chapters in the history of the industrial enterprise, 120, MIT press.
  12. Cho, Y. S. (2010). "The Influence of Resource and Dynamic Capability on Competitive Advantage." Journal of Korea Trade, 35(5), pp. 275-301.
  13. Dai, C. X., and Wells, W. G. (2004). "An exploration of project management office features and their relationship to project performance." International Journal of Project Management, 22(7), pp. 523-532. https://doi.org/10.1016/j.ijproman.2004.04.001
  14. Davies, A., and Brady, T. (2000). "Organisational capabilities and learning in complex product systems: towards repeatable solutions." Research policy, 29(7-8), pp. 931-953. https://doi.org/10.1016/S0048-7333(00)00113-X
  15. Dierickx, I., and Cool, K. (1989). "Asset stock accumulation and sustainability of competitive advantage." Management science, 35(12), pp. 1504-1511. https://doi.org/10.1287/mnsc.35.12.1504
  16. Drouin, N., and Jugdev, K. (2013). "Standing on the shoulders of strategic management giants to advance organizational project management." International Journal of Managing Projects in Business, 7(1), pp. 61-77. https://doi.org/10.1108/IJMPB-04-2013-0021
  17. Eisenhardt, K. M., and Martin, J. A. (2000). "Dynamic capa bilities: what are they?" Strategic management Journal, 21(10-11), pp. 1105-1121. https://doi.org/10.1002/1097-0266(200010/11)21:10/11<1105::AID-SMJ133>3.0.CO;2-E
  18. Fornell, C., and Larcker, D. F. (1981). "Evaluating structural equation models with unobservable variables and measurement error." Journal of marketing research, pp. 39-50.
  19. Gibson, Cristina B., and Birkinshaw, Julian. (2004). "The antecedents, consequences, and mediating role of organizational ambidexterity." Academy of management Journal, 47(2), pp. 209-226. https://doi.org/10.2307/20159573
  20. Helfat, Constance E. (2007). Stylized facts, empirical research and theory development in management.
  21. Jugdev, K., Mathur, G., and Fung, T. S. (2007). "Project management assets and their relationship with the project management capability of the firm." International Journal of Project Management, 25(6), pp. 560-568. https://doi.org/10.1016/j.ijproman.2007.01.009
  22. Jung, Y. G., and Yoon, J. K (2013). "Test of an integrative model of the resource-based view and the dynamic capability one." Korea Business Review. 42(1), pp. 53-83.
  23. Keegan, A., and Turner, J. R. (2002). "The management of innovation in project-based firms. Long range planning." 35(4), pp. 367-388. https://doi.org/10.1016/S0024-6301(02)00069-9
  24. Killen, C. P., Hunt, R. A., and Kleinschmidt, E. J. (2008). "Project portfolio management for product innovation." International Journal of Quality & Reliability Management, 25(1), pp. 24-38. https://doi.org/10.1108/02656710810843559
  25. Killen, C. P., Jugdev, K., Drouin, N., and Petit, Y. (2012). "Advancing project and portfolio management research: Applying strategic management theories." International Journal of Project Management, 30(5), pp. 525-538. https://doi.org/10.1016/j.ijproman.2011.12.004
  26. Killen, C. P., and Hunt, R. A. (2013). "Robust project portfolio management: capability evolution and maturity." International Journal of Managing Projects in Business, 6(1), pp. 131-151. https://doi.org/10.1108/17538371311291062
  27. Kim, L. (1998). "Crisis construction and organizational learning: Capability building in catching-up at Hyundai Motor." Organization science, 9(4), pp. 506-521. https://doi.org/10.1287/orsc.9.4.506
  28. Lee, D. H. (2006). "An anatomy of dynamic capability in strategy theory." Korea business review, 35(6), pp. 1913-1937.
  29. Lin, Y., and Wu, L. Y. (2014). "Exploring the role of dynamic capabilities in firm performance under the resource-based view framework." Journal of business research, 67(3), pp. 407-413. https://doi.org/10.1016/j.jbusres.2012.12.019
  30. Lindkvist, L. (2004). "Governing project-based firms: promoting market-like processes within hierarchies." Journal of Management and Governance, 8(1), pp. 3-25. https://doi.org/10.1023/B:MAGO.0000015392.75507.ad
  31. Makadok, R. (2001). "Toward a synthesis of the resource-based and dynamic-capability views of rent creation." Strategic management Journal, 22(5), pp. 387-401. https://doi.org/10.1002/smj.158
  32. Mathur, G., Jugdev, K., and Shing Fung, T. (2014). "The relationship between project management process characteristics and performance outcomes." Management Research Review, 37(11), pp. 990-1015. https://doi.org/10.1108/MRR-05-2013-0112
  33. Melkonian, T., and Picq, T. (2011). "Building project capabilities in PBOs: Lessons from the French special forces." Internationa Journal of Project Management, 29(4), pp. 455-467. https://doi.org/10.1016/j.ijproman.2011.01.002
  34. Petit, Y. (2012). "Project portfolios in dynamic environments: Organizing for uncertainty." International Journal of Project Management, 30(5), pp. 539-553. https://doi.org/10.1016/j.ijproman.2011.11.007
  35. Priem, R. L., and Butler, J. E. (2001). "Is the resource-based "view" a useful perspective for strategic management research?" Academy of management review, 26(1), pp. 22-40. https://doi.org/10.2307/259392
  36. Porter, M. E. (1980). Competitive strategy: techniques for analyzing industries and competitors.
  37. Porter, M. E., and Advantage, C. (1985). Creating an sustaining superior performance. Competitive advantage, 167.
  38. Raisch, S., and Birkinshaw, J. (2008). "Organizational ambidexterity: Antecedents, outcomes, and moderators." Journal of management, 34(3), pp. 375-409. https://doi.org/10.1177/0149206308316058
  39. Rumelt, R. P., and Lamb, R. (1984). Competitive strategic management. Toward a Strategic Theory of the Firm, pp. 556-570.
  40. Soderlund, J. (2005). "Developing project competence: empirical regularities in competitive project operations." International Journal of Innovation Management, 9(04), pp. 451-480. https://doi.org/10.1142/S1363919605001344
  41. Song, J. Y., and Sung, H. S (2015). "A study on relation between strategic attributes of technological resources and competitive advantage." Journal of Korea technology innovation society, 18(3), pp. 416-443.
  42. Teece, D. J., Pisano, G., and Shuen, A. (1997). "Dynamic capabilities and strategic management." Strategic management journal, 18(7), pp.509-533. https://doi.org/10.1002/(SICI)1097-0266(199708)18:7<509::AID-SMJ882>3.0.CO;2-Z
  43. Teece, D. J. (2007). "Explicating dynamic capabilities: the nature and micro foundation of (sustainable) enterprise performance." Strategic management journal, 28(13), pp. 1319-1350. https://doi.org/10.1002/smj.640
  44. Thomas, J., and Mullaly, M. (2007). "Understanding the value of project management: First steps on an international investigation in search of value."Project Management Journal, 38(3), pp. 74-89. https://doi.org/10.1002/pmj.20007
  45. Wang, C. L., and Ahmed, P. K. (2007). "Dynamic capabilities: A review and research agenda." International journal of management reviews, 9(1), pp. 31-51. https://doi.org/10.1111/j.1468-2370.2007.00201.x
  46. Wernerfelt, Birger. (1984). "A resource-based view of the firm." Strategic management journal, 5(2), pp. 171-180. https://doi.org/10.1002/smj.4250050207
  47. Yu, J, E., (2018). Innovative organizational behavior for the fourth industrial revolution. Sinasa, pp. 245-260
  48. Zhan, W., and Luo, Y. (2008). "Performance implications of capability exploitation and upgrading in international joint ventures." Management International Review, 48(2), pp. 227-253. https://doi.org/10.1007/s11575-008-0013-0
  49. Zoiopoulos, I. I. (2013). "Organizational Configurations and Project Capability Development: Lessons from Construction." Procedia-Social and Behavioral Sciences, 74, pp. 81-90. https://doi.org/10.1016/j.sbspro.2013.03.025
  50. Zollo, M., and Winter, S. G. (2002). "Deliberate learning and the evolution of dynamic capabilities." Organization science, 13(3), pp. 339-351. https://doi.org/10.1287/orsc.13.3.339.2780