References
- 김영근, 지하공사에서의 프로젝트 리스크 및 안전관리 시스템(2017), 한국프로젝트경영협회 2017 PM 심포지엄.
- 김영근, 선진국형 터널공사 건설시스템(2018), KTA 정책연구보고서, 한국터널지하공학회.
- 김영근, 선진국 지하대심도 개발에서의 핵심이슈와 대책(2019), 지하대심도 건설기술세미나.
- 김영근, 지하터널공사에서의 리스크 안전관리 시스템 분석과 국내적용방안(2019), 한국건설관리학회 2019 학술발표대회.
- British Tunnelling Society (BTS) (2003) Joint code of practice for risk management of tunnel works in the UK.
- Chiriotti E, Grasso P, Xu S (2003) Analyses of tunnelling risks: state-of-the-art and examples. Gallerie, n. 69.
- Chiriotti E, Grasso P, Gaj F, Giacomin G (2004) Risk control for mechanized tunnelling in urban areas. In: Proceedings of IX national geotechnical congress, Aveiro, Portugal.
- Clayton CRI (2001) Managing geotechnical risk. Improving productivity in UK building and construction. Thomas Telford Publishing, London.
- Flyvbjerg B (2014) What you should know about megaprojects and why: an overview. Project Manag J 45(2):6-19. https://doi.org/10.1002/pmj.21409
- Grasso P, Mahtab AM, Kalamaras GS, Einstein HH (2002) On the development of a risk management plan for tunneling. In: Proceedings world tunnel congress ITA 2002, Sydney.
- Grasso P, Mahtab MA, Kalamaras G, Einstein HH (2002) On the development of a Risk Management Plan for Tunnelling. In: Proceedings world tunnel congress and 31st ITA assembly, Sydney.
- Grasso P, Xu S, Pescara M, Russo G, Repetto L (2006) A methodology for the geotechnical design of long high-speed rail tunnels under the conditions of uncertainty. In: ITA-sponsored 2006 China international symposium on high speed railway tunnels, Beijing.
- Guglielmetti V, Grasso P, Mathab A (2007) Mechanized tunnelling in urban areas: design methodology and construction control. Taylor & Francis, Routledge.
- Hartmut R (2011) Developments in the tunneling industry following introduction of the tunneling code of practice. In: IMIA Annual Conference, Amsterdam.
- ITIG Int. Tunnelling Insurance Group (2006, 2012) Code of practice for risk management of tunnel works.
- Merrow E (2011) Industrial megaprojects: concepts, strategies & practices for success. Wiley, New York.
- Piergiorgio Grasso, Luca Soldo (2017) Risk analysis-driven design in tunnelling: the state-of-the-art, learnt from past experiences, and horizon for future development, Innov. Infrastruct. Solut. 2:49. https://doi.org/10.1007/s41062-017-0087-2
- Piergiorgio Grasso (2008) Risk Management Applied to Mechanized Tunnelling in Urban Areas, ITA-CBT Seminario ASAT2008.
- Vittorio Guglielmetti, Piergiorgio Grasso, Ashraf Mahtab, Shulin Xu(2007), Mechanized Tnnelling in Urban Areas - Design Methodology and Construction Control, Taylor & Francis/Balkema.