DOI QR코드

DOI QR Code

Seismic performance of precast joint in assembled monolithic station: effect of assembled seam shape and position

  • Liu, Hongtao (Key Laboratory of Urban Security and Disaster Engineering of the Ministry of Education, Beijing University of Technology) ;
  • Du, Xiuli (Key Laboratory of Urban Security and Disaster Engineering of the Ministry of Education, Beijing University of Technology)
  • 투고 : 2019.04.04
  • 심사 : 2019.11.09
  • 발행 : 2019.12.25

초록

Precast concrete structure has many advantages, but the assembled seam will affect potentially the overall seismic performance of structure. Based on the sidewall joint located in the bottom of assembled monolithic subway station, the main objectives of this study are, on one hand to present an experimental campaign on the seismic behavior of precast sidewall joint (PWJ) and cast-in-place sidewall joint (CWJ) subjected to low-cycle repeated loading, and on the other hand to explore the effect of shape and position of assembled seam on load carrying capacity and crack width of precast sidewall joint. Two full-scale specimens were designed and tested. The important index of failure pattern, loading carrying capacity, deformation performance and crack width were evaluated and compared. Based on the test results, a series of different height and variably-shape of assembled seam of precast sidewall joint were considered. The test and numerical investigations indicate that, (1) the carrying capacity and deformation capacity of precast sidewall and cast-in-place sidewall were very similar, but the crack failure pattern, bending deformation and shearing deformation in the plastic hinge zone were different obviously; (2) the influence of the assembled seam should be considered when precast underground structures located in the aquifer water-bearing stratum; (3) the optimal assembled seam shape and position can be suggested for the design of precast underground concrete structures according to the analysis results.

키워드

과제정보

연구 과제 주관 기관 : National Natural Science Foundation of China

참고문헌

  1. Akkose, M., Sunca, F. and Turkay, A. (2018), "Pushover analysis of prefabricated structures with various partially fixity rates", Earthq. Struct., 14(1), 21-32. https://doi.org/10.12989/eas.2018.14.1.021.
  2. Ameli, M.J., Parks, J.E. Brown, D.N. and Pantelides, C.P. (2014), "Grouted splice sleeve connection alternatives for precast reinforced concrete bridge piers in moderate-to-high seismic regions", NCEE 2014 - 10th U.S. National Conference on Earthquake Engineering: Frontiers of Earthquake Engineering, Earthquake Engineering Research Institute, Anchorage.
  3. Beilic, D., Casotto, C., Nascimbene, R., Cicola, D. and Rodrigues, D. (2017), "Seismic fragility curves of single storey RC precast structures by comparing different Italian codes", Earthq. Struct., 12(3), 359-374. https://doi.org/10.12989/eas.2017.12.3.359.
  4. Belleri, A. and Riva, P. (2012), "Seismic performance and retrofit of precast concrete grouted sleeve connections", PCI J., 57, 97-109. https://doi.org/10.15554/pcij.01012012.97.109
  5. Choi, H.K., Choi, Y.C. and Choi, C.S. (2013), "Development and testing of precast concrete beam-to-column connections", Eng. Struct., 56, 1820-1835. https://doi.org/10.1016/j.engstruct.2013.07.021.
  6. Haber, Z.B., Saiidi, M.S. and Sanders, D.H. (2014), "Seismic performance of precast columns with mechanically spliced column-footing connections", ACI Struct. J., 111(3), 639-650. https://doi.org/10.14359/51686624
  7. Hawileh, R.A., Rahman, A. and Tabatabai, H. (2010), "Nonlinear finite element analysis and modeling of a precast hybrid beam-column connection subjected to cyclic loads", Appl. Math. Model., 34(9), 2562-2583. https://doi.org/10.1016/j.apm.2009.11.020.
  8. Kim, T.H., Lee, H.M. Kim, Y.J. and Shin, H.M. (2010), "Performance assessment of precast concrete segmental bridge columns with a shear resistant connecting structure", Eng. Struct., 32(5), 1292-1303. https://doi.org/10.1016/j.engstruct.2010.01.007.
  9. Kim, Y.M. (2000), "A study of pipe splice sleeves for use in precast beam-column connections", MA. Sc. Dissertation, University of Texas, Dallas, Austin.
  10. Kremmyda, G.D., Fahjan, Y.M. and Tsoukantas S.G. (2014), "Nonlinear FE analysis of precast RC pinned beam-to-column connections under monotonic and cyclic shear loading", Bull. Earthq. Eng., 12(4), 1615-1638. https://doi.org/10.1007/s10518-013-9560-2.
  11. Liu, H.T., Han, Q., Bai, Y.L., Xu, C.X. and Du, X.L. (2018), "Connection performance of restrained deformed grouted sleeve splice", Adv. Struct. Eng., 21(3), 488-499. https://doi.org/10.1177/1369433217719987.
  12. Ma, C., Lu, D.C. and Du, X.L. (2018), "Effect of buried depth on seismic response of rectangular underground structures considering the influence of ground loss", Soil Dyn. Earthq. Eng., 106, 278-297. https://doi.org/10.1016/j.soildyn.2017.12.021.
  13. Nzabonimpa, J.D. and Hong, W. (2019), "Experimental and nonlinear numerical analysis of precast concrete column splices with high-yield metal plates", J. Struct. Eng., 145(2), 1-15. https://doi.org/10.1061/(ASCE)ST.1943-541X.0002233.
  14. Pantelides, C.P., Reaveley, L.D. and McMullin, P.W. (2003), "Design of CFRP composite connector for precast concrete elements", J. Reinf. Plast. Compos., 22(15), 1335-1351. https://doi.org/10.1177/073168403035581.
  15. Park, R. (1995), "A perspective on the seismic design of precast concrete structures in new zealand", PCI J., 40(3), 40-59. https://doi.org/10.15554/pcij.05011995.40.60
  16. Popa, V., Papurcu, A., Cotofana, D. and Pascu, R. (2015), "Experimental testing on emulative connections for precast columns using grouted corrugated steel sleeves", Bull. Earthq. Eng., 13(8), 2429-2447. https://doi.org/10.1007/s10518-014-9715-9.
  17. Rave-Arango, J.F., Blandon, C.A., Restrepo, J.I. and Carmona, F. (2018), "Seismic performance of precast concrete column-to-column lap-splice connections", Eng. Struct., 172, 687-699. https://doi.org/10.1016/j.engstruct.2018.06.049.
  18. Riva, P. (2006), "Seismic behaviour of precast column-to-foundation grouted sleeve connections", International Conference on Advances in Engineering Structures, Mechanics and Construction, Springer Netherlands, Ontario.
  19. Soudki, K.A., Rizkalla, S.H. and Daikiw, R.W. (1995a), "Horizontal connections for precast concrete shear walls subjected to cyclic deformations part 2: prestressed connections", PCI J., 40(5), 82-96.
  20. Soudki, K.A., Rizkalla, S.H. and LeBlanc, B. (1995b), "Horizontal connections for precast concrete shear walls subjected to cyclic deformations part 1: mild steel connections", PCI J., 40(4), 78-96. https://doi.org/10.15554/pcij.07011995.78.96
  21. Zhang, W.J., Guo, Y.Y. and Liu, S.W. (2016), "Experimental research on seismic behavior of precast RC columns with steel bars spliced by compressive sleeves", Eng. Mech., 33(12), 119-127.

피인용 문헌

  1. Influence of Precast Member Corbels on Seismic Performance of Precast Beam-Slab-Column Joints vol.2021, 2019, https://doi.org/10.1155/2021/7107569