과제정보
연구 과제 주관 기관 : 한국연구재단
참고문헌
- Byun, N. H., Lim, Y. K., Lee, H. Y., & Gwak, S. N. (2017). Planning Issues and Suggestions for Improvement of Public Office Building, Architecture & Urban Research Institute.
- Department of Defense of United States of America (2014). Unified Facilities Criteria(UFC) 4-610-01: Administration Facilities.
- Department of the Air-Force of United States of America (2016). Air-Force Manual 32-1084: Civil Engineering Facility Requirements.
- Department of the Army of United States of America (2006). Army Regulation 405-70: Real Estate Utilization of Real Property.
- Department of the Navy & Marine of United States of America (2017). Unified Facilities Criteria(UFC) 2-000-05N: Facility Planning for Navy and Marine Corps Shore Installations: Appendix F, Austere Facilities(Navy).
- Go, S. S., Song, H., Lee, H. M., & Lee, H. C. (2007). A Study on the Priority of Residents' Demands during Apartment House Remodeling Stage using AHP(Analytic Hierarchy Process): Focused on Apartment Houses in Gwangju City, Journal of the Architectural Institute of Korea, 23(6), 163-170.
- Jang, M. H., & Lee, H. S. (2002). A Method of Evaluating and Selecting Alternatives of Temporary Facility Planning in High-rise Building Projects, Journal of Architectural Institute of Korea, 18(12), 143-150.
- Kim, H. S. (2012). Analyzing Housing Determinants of Seoul Residents Using AHP, Journal of the Architectural Institute of Korea, 28(1), 227-235.
- Kim, S. H., & Um, W. J. (2010). A Study on the Design Quality of Public Buildings with Indicator Management System, Architecture & Urban Research Institute.
- Kwon, S. J., & Joo, S. H. (2011). A Study on the proportion of functional Areas in the ward of General Hospitals, Journal of the Korea Institute of Healthcare Architecture, 17(4), 49-55. https://doi.org/10.15682/JKIHA.2011.17.4.049
- Law of the Ministry of the Interior and Safety No. 1, (2017). Criteria of the Government Office Building's Space Acquisition and Allocation.
- Lee, D. U., & Kim, Y. S. (2003). A Study on the Cost Risk Analysis for Construction Projects using Fuzzy-AHP Method, Journal of the Architectural Institute of Korea, 19(4), 169-176.
- Lee, J. S., Yang, S. H., & Lee, J. W. (2013). A Study on the User's Satisfaction on the Circulation and Allocation of Facilities According to the Location according to tracks and Types of Railroad Station, Journal of the Regional Association of Architectural Institute of Korea, 15(6), 13-20.
- Lee, S. M., Kim, J. W., & Lee, M. W. (2009). The Study on Management Strategy with Public Buildings for Efficient Creation, Architecture & Urban Research Institute.
- Ministry of National Defense (2018). Defense Military Facilities Criteria 3-30-10: Architectural Floor Space Criteria.
- Saaty, T. L. (1980). The Analytic Hierarchy Process: Planning, Priority, Setting, Resource Allocation, New York: McGraw-Hill International Book Co.
- Shen, Q., Lo, K. K., & Wang, Q. (1998). Priority Setting in Maintenance Management: A Modified Multi-Attribute Approach using Analytic Hierarchy Process, Construction Management and Economics, 16, 693-702. https://doi.org/10.1080/014461998371980
- Shin, D. J., Lee, S. H., & Lim, C. Z. (2009). A Study on the Lay-out Type of Faculty Space in Library, Journal of the Korean Biblia Society for Library and Information Science, 20(1), 165-179.
- Skibniewski, M. J., & Chao, L. C. (1992). Evaluation of Advanced Construction Technology with AHP Method, Journal of Construction Engineering and Management, 118(3), 577-593. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:3(577)
- Tchah, C. Y., & Kim, E. H. (2014). A Study on Improvement of Planning Criteria for Public Office Buildings, Architecture & Urban Research Institute.
- Youm, C. H., & Lim, H. S. (2010). Establishment of Architectural Process Design Guideline for Public Office Buildings, Architecture & Urban Research Institute.