References
- Nooteboom, U, "Interface Management improves on time, on-budget delivery of mega projects", JPT Online, Society of Petroleum Engineers, 2004.
- Wideman, R.M, "Wideman comparative glossary of project management terms", Vol 3, no: 1 ,2002.
- Froese, T.M.," The impact of emerging information technology on project management for construction", Automation in Construction, Vol. 19, no. 5, pp. 531-538,2010. https://doi.org/10.1016/j.autcon.2009.11.004
- David & Myriam,"Use of WBS matrix to Improve Interface management in Projects", ASCE-Journal of Construction Engineering and Management, Vol. 132, no. 1, pp. 67-79, Jan 2006. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:1(67)
- Youngcheol Kang.,William J. O'Brien.,and James T. O'Connor, "IOP Tool: Assessing the Benefits and Hindrances of Informat. on Integration Implementation Opportunities", ASCE-Journal of Management in Engineering, Vol. 28, no. 2, pp. 160-169, 2012. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000066
- Xuelian.," Influencing Factors for project Interface management", ASCE-ICCREM, pp. 448-456, 2013.
- Kalyan&Mundoli (2015)," Technology Enablers For Construction Information Supply Chain Management", Proceedings of Indian Lean Construction Conference.
- Li-Ren Yang. , Jieh-Haur Chen., Hsiao-Wen Wang,"Assessing impacts of information technology on project success through knowledge management practice", Elsevier-Automation in Construction, vol. 22, pp. 182-191, 2012. https://doi.org/10.1016/j.autcon.2011.06.016
- Shokri, "Current State of Interface Management in Mega Construction Projects", ASCE- Construction Research Congress, pp. 2266-2275, 2014.
- Shokri, S., Ahn, S., Lee, S., Haas, C. T., Haas, R. C G, "Current Status of Interface Management in Construction: Drivers and Effects of Systematic Interface Management", ASCE-Journal of Management in Engineering, vol. 142, no. 2, 2015.
- Qian Chen., Georg Reichard and Yvan Beliveau. "Interface management -A Facilitator of Lean Construction and Agile Project Management"-Proceedings IGLC-15, 2007.
- Corey Daniels, Clifton B. Farnsworth, and Justin Weidman, "Interface management on Mega Projects: A Case study", 50th ASC Annual International Conference Proceedings. 2014.
- Yang J.B and S.F. Ou, "Using structural equation modelling to analyze relationships among key causes of delay in construction", Canadian Journal of Civil Engineering, pp.321-332,2008.
- Molenaar, K., Washington, S. & Diekmann, J., "Structural equation model of contract dispute potential", Journal of construction engineering and management, Vol.126, No. 4, pp. 268-277,2000. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:4(268)
- Barclay, D., Higgins, C. , Thompson, R. "The Partial Least Squares (PLS) approach to causal modeling: personal computer adoption and use as an illustration", Technology Studies, pp. 285-309,1995.
- Cronbach, L.J. Coefficient alpha and the internal structure of tests", Psychometrika, pp. 297-334,1951.
- Werts, C.E., Linn, R.L., and Joereskog, K.G., "Intraclass reliability estimates: testing structural assumptions", Educational and Psychological Measurement,pp.25-33,1974.
- Fornell, C., & Larcker, D. F, "Structural equation models with unobservable variables and measurement error: Algebra and statistics". Journal of Marketing Research, Vol.18, No.3, pp. 328-388, DOI: 10.2307/3150980,1981.
- Abiniu, A. A and Odeyinka, H. A, "Construction delays and their causative factors in Nigeria", Journal of Construction Engineering and Management", pp. 667-677,2006.
- Cohen, J.,Statistical power analysis for the behavioural sciences", Lawrence Erlbaum Associates Hillsdale, NewJersey,1988.
- Chin, W. W. " The partial least squares approach to structural equation modelling", Modern Methods for Business Research Erlbaum, Mahwah, NJ, pp. 295-336,1998.
- Akter, S., Ambra, J. D., & Ray, P. "Trustworthiness in mHealth Information Services: An Assessment of a Hierarchical Model with Mediating and Moderating Effects Using Partial Least Squares (PLS)", Journal Of The American Society For Information Science And Technology, Vol. 62, no. 1, pp. 100-116, 2011. https://doi.org/10.1002/asi.21442
- Cohen, J.,Cohen, P.,West, S. G., & Aiken, L. S. "Applied Multiple Regression/Correlation Analysis for the Behavioral Sciences", Lawrence Erlbaum Associates, Publishers, Mahwah, New Jersey, London, 2003.
- Qian Chen., Georg Reichard and Yvan Beliveau. "Multiperspective approach to Exploring Comprehensive Cause Factors for Interface Issues", ASCE -Journal of Construction Engineering and Management, Vol. 134, no. 6, pp. 432-441, June 2008. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:6(432)