DOI QR코드

DOI QR Code

ARIMA모델 기반 생활 기상지수를 이용한 동·하계 최대 전력 수요 예측 알고리즘 개발

Development of ARIMA-based Forecasting Algorithms using Meteorological Indices for Seasonal Peak Load

  • 투고 : 2018.05.09
  • 심사 : 2018.09.04
  • 발행 : 2018.10.01

초록

This paper proposes Autoregressive Integrated Moving Average (ARIMA)-based forecasting algorithms using meteorological indices to predict seasonal peak load. First of all, this paper observes a seasonal pattern of the peak load that appears intensively in winter and summer, and generates ARIMA models to predict the peak load of summer and winter. In addition, this paper also proposes hybrid ARIMA-based models (ARIMA-Hybrid) using a discomfort index and a sensible temperature to enhance the conventional ARIMA model. To verify the proposed algorithm, both ARIMA and ARIMA-Hybrid models are developed based on peak load data obtained from 2006 to 2015 and their forecasting results are compared by using the peak load in 2016. The simulation result indicates that the proposed ARIMA-Hybrid models shows the relatively improved performance than the conventional ARIMA model.

키워드

참고문헌

  1. Hee-Man Shin, Gi-Hyun Bang, Hyo-Seok Cho, Jae-Hyun Park, "Gis-based Regional Load Forecasting System Using Grid Bigdata", The Annual Spring Conference of the Korean Society for Geospatial Information System, pp. 139-140, May. 2017.
  2. Hak-Loh Lee, Jin-Hyun Han, Myung-Hoon Yi, "Electricity Peak Equation: Estimation and Prediction", Korean Energy Economic Review, Vol. 9, No. 2, pp. 83-99, Sep. 2010
  3. Korea power exchange, The 7th Basic Plan for Electricity Supply and Demand, https://www.kpx.or.kr
  4. Z. J. Qiao, F. L. Li, Y. Li, "Mid-long-Term Regional Load Forecasting based on Census X12-SARIMA Model", Przeglad Elektrotechniczny, pp. 224-227, 2013.
  5. G. Juberias, R. Yunta, J. G. Moreno, C. Mendivil, "A new ARIMA model for hourly load forecasting", Transmission and Distribution Conference, IEEE, pp. 314-319, 1999.
  6. Hyun-Woo Jung, Kyung-Bin Song, "Daily Maximum Electric Load Forecasting for the Next 4 Weeks for Power System Maintenance and Operation", The Transactions of The Korean Institute of Electrical Engineers, Vol. 63, No. 11, pp. 1497-1502, Nov. 2014. https://doi.org/10.5370/KIEE.2014.63.11.1497
  7. Bong-Woo Nam, Kyung-Bin Song, Kyu-Ho Kim, Jun-Min Cha, "The Spatial Electric Load Forecasting Algorithm using the Multiple Regression Analysis Method", Journal of the Korean Institute of Illuminating and Electrical Installation Engineers, Vol. 22, No. 2, pp. 63-70, Feb. 2008. https://doi.org/10.5207/JIEIE.2008.22.2.063
  8. Korea electric power corporation, Electrical supply terms and conditions, http://cyber.kepco.co.kr, 2018.
  9. Woo-Ri Lee, Time series analysis and forecasting, Tamjn, p. 3, 2014.
  10. M. Y. Cho, J. C. Hwang, C. S. Chen, "Customer short term load forecasting by using ARIMA transfer function model", IEEE Conference on Energy Management and Power Delivery, Vol. 1, pp. 317-322, Nov. 1995.
  11. Woo-Ri Lee, Time series analysis and forecasting, Tamjn, pp. 7-8, 2014.
  12. Sung-Wan Bang, Engineering Numerical Analysis to Learn with MATLAB, Hanbit academy, pp. 136, 2016.
  13. Woo-Ri Lee, Time series analysis and forecasting, Tamjn, p. 15, 2014.
  14. Korea Meteorological Administration, Life Weather Index(Discomfort index), http://www.weather.go.kr, 2009.
  15. Korea Meteorological Administration, Life Weather Index(Sensible temperature), http://www.weather.go.kr, 2009.
  16. Korea Energy Economics Institute, Yearbook of Regional Energy Statistics, http://www.keei.re.kr, 2017.
  17. B. Ratner, "The correlation coefficient: Its values range between +1/-1, or do they?", Journal of Targeting, Measurement and Analysis for Marketing, Vol. 17, Issue. 2, pp. 139-142, Jun. 2009. https://doi.org/10.1057/jt.2009.5