참고문헌
- Park, J. M., Lee, H. C., Jang, J. S. and Park, S. C, “Determination of the Initial Test Year for Ons-shot System using Validity Assessment of Drugs,” Journal of the Applied Reliability, Vol. 17, No. 1, pp. 1-10, 2017.
- Navy Headquarters, "Naval Rules of ILS(Integrated Logistics Support)," p. 46, 2015.
- Lawless, J. F, “Statistical Methods in Reliability,” Technometrics, Vol. 25, No. 4, pp. 305-316, 1983. https://doi.org/10.1080/00401706.1983.10487887
- Suzuki, K, “Estimation of Lifetime Parameters from Incomplete Field Data,” Technometrics, Vol. 27, No. 3, pp. 263-272, 1985. https://doi.org/10.1080/00401706.1985.10488050
- Lawless, J. F., “Adjustments for Reporting Delays and the Prediction of Occurred but Not Reported Events,” The Canadian Journal of Statistics, Vol. 22, No. 1, pp. 15-31, 1994. https://doi.org/10.2307/3315826.n1
- Baik, J. W. and Jo, J. N, “Predicting the Future Number of Failures based on the Field Failure Summary Data,” Journal of the Korean Data & Information Science Society, Vol. 22, No. 4, pp. 755-764, 2011.
- Baik, J. W. and Jo, J. N, "Reliability Analysis of Warranty Returns Data," Journal of the Korean Data & Information Science Society, Vol. 24, No. 3, pp. 893-901, 2014.
- Song, I. S, "Quality Bible," Lee dam Books, Korea, p. 77, 2017.
- Robert B. Abernethy, "The New Weibull Handbook," Robert B. Abernethy, Florida, USA, pp. 2.2-2.4, 2006.
- Robert B. Abernethy, "The New Weibull Handbook," Robert B. Abernethy, Florida, USA, p. 2.8, 2006.
- Kim, S. H, "A Study on the Economic Life Cycle Decision Method of Aircraft Direct Support Equipment," Journal of Korea Industrial and Systems Engineering, Vol. 37, No. 4, pp. 193-201, 2016.