Development and Analysis of Fuzzy Overall Equipment Effectiveness (OEE) in TPM

TPM에서 퍼지 OEE 모형의 개발 및 분석

  • 최성운 (가천대학교 산업경영공학과)
  • Received : 2018.10.01
  • Accepted : 2018.12.31
  • Published : 2018.12.31

Abstract

This paper introduces the method to develop two main types of the fuzzy OEE (Overall Equipment Effectiveness) models via triangular membership function for measuring uncertainty. The fuzzy OEE includes model type 1 and model type 2. The model type 1 is used when the theoretical machine speed only reflects the time loss whereas model type 2 is used when the actual machine speed reflects both time and speed loss. Model type 2 has shown to perform a lower availability rate and a higher performance rate compared to model type 1. In addition, the fuzzy UPH (Unit Per Hour) which is derived from using the fuzzy OEE is presented to satisfy demand uncertainty. The fuzzy UPH can easily measure the fuzzy tact time and cycle time by reciprocating itself. Finally, this study demonstrates the fuzzy OEE models using IVIFS (Interval-Valued Intuitionistic Fuzzy Set) based on the characterization via membership function, non-membership function and hesitant function. For the purpose of analyzing the fuzzy system OEE, the OEE for each machine of plant structure is considered triangular interval-valued intuitionistic fuzzy number. Regardless of plant structure, the validity degree of fuzzy membership function of system OEE decreases when the number of machine with worst value of the validity degree increases. Corresponding examples are presented in this paper for practitioner to understand the applicability and practicability of the proposed fuzzy OEE methods.

Keywords

References

  1. Al-Najjar B. Alsyouf I. (2003), "Selecting the Most Efficient Maintenance Approach Using Fuzzy Multiple Criteria Decision Making", International Journal of Production Economics, 84,85-100. https://doi.org/10.1016/S0925-5273(02)00380-8
  2. Atanassov K.T., (2012), On Intuitionistic Fuzzy Sets Theory, Springer.
  3. Atanassov K.T., (2017), Intuitionistic Fuzzy Logics, Springer.
  4. Berrah L., Cliville V. , Foulloy L. (2018), Industrial Objects and Industrial Performance : Concepts and Fuzzy Handling, Wiley.
  5. Cheng A.C., Cheng C.J., Cheng C.Y. (2008), "A Fuzzy Multiple Criteria Comparision of Technology Forecasting Methods for Predicting the New Materials Development", Technological Forecasting and Social Change, 75, 131-141. https://doi.org/10.1016/j.techfore.2006.08.002
  6. Choi S.(2012), "Development and Inplementation of Chain Metrics for Obtaining Lean Overall Equipment Effectiveness Using Availability Measures", Journal of the Korea Safety and Management Science, 14(2), 147-158.
  7. Djatna T., Ihsan M.R. (2015), "A Fuzzy Associative Memory Modeling for Production Equipment Status Assessment", Industrial Engineering and Service Science, 4, 163-167.
  8. Dymova L., Sevastjanov P. (2010), "An Interpretation of Intuitionistic Fuzzy Sets in Terms of Evidence Theroy : Decision Making Aspect", Knowledge-Based Systems, 23, 772-782. https://doi.org/10.1016/j.knosys.2010.04.014
  9. Kahraman C., Yavuz M. (2010), Production Engineering and Management Under Fuzziness, Springer.
  10. Kennedy R.K., (2017), Understanding, Measuring and Improving Overall Equipment Effectiveness : How to Use OEE to Drive Significant Process Improvement, CRC Press.
  11. Mahapatra G.S., Roy T.K. (2009), "Reliability Evaluation Using Triangular Intuitionistic Fuzzy Numbers Arithmetic Operations", World Academy of Science, Engineering and Technology, 26, 574-581.
  12. Mahato S.K., Sahoo L.. Bhunia A.K. (2013),"Effect of Defuzzification Methods in Redundancy Allocation Problem with Fuzzy Valued Reliabilities Via Genetic Algorithm", International Journal of Information and Computer Science, 2(6), 106-115.
  13. Maran M., Manikandan G., Thiagarajan K. (2013) "Overall Equipment Effectiveness Measurement : Weighted Approach Method and Fuzzy Expert System", IAENG Trasactions on Engineering Technology. 186, 231-245.
  14. Naik G.R, Raikar V.A., Naik P.G. (2016), "Cascaded Fuzzy Inference System for Overall Equipment Effectiveness of a Manufacturing Process", International Journal on Recent and Innovation Trends in Computing and Communication, 4(2), 61-69.
  15. Niraj M., Kumar P. (2011), "Selection of Maintenance Practice Through Fuzzy Logic Based Simulation in TPM", International Journal of Scientific and Engineering Research, 2(8), 1-5.
  16. Rao S., Niraj M. (2016), "Evaluation of Overall Equipment Effectiveness(OEE) Through Lean Metrics by a Fuzzy Approach in an Industry", International Journal for Technological Research in Enginerring, 3(9), 2233-2236.
  17. Kobler M.P., Abele E. (2013), "Uncertainty in the Analysis of the Overall Equipment Effectiveness on the Shop Floor", IOP Conference Series : Materials Science and Engineering, 46,1-9.
  18. Saha D., Syamsunder M., Chakraborty S. (2016), Manufacturing Performance Management Using SAP OEE : Implementing and Configuring Overall Equipment Effectiveness, Apress.
  19. Seo H., Seo J., Kim C.(2005), "A Case Study on Application of Six Sigma Process for Effective TPM", Journal of the Korea Society of Maintenance Engineers, 10(2),75-88.
  20. Sharma M.K., Sharma V., Dangwal R. (2012), "Reliability Analysis of a System Using Intuitionistic Fuzzy Sets", International Journal of Soft Computing and Engineering, 2(3), 431-440.
  21. Shaw A.K., Roy T.K. (2012), "Some Arithmetic Operations on Triangular Intuitionistic Fuzzy Number and Its Application on Reliability Evaluation", International Journal of Fuzzy Mathematics and Systems, 2(4), 363-382.
  22. Sonmez V., Testik M.C. (2017), "Using Accurately Measured Production Amounts to Obtain Calibration Curve Corrections Production Line Speed and Stoppage Duration Consisting of Measurement Errors", International Journal of Manufacturing Technology, 88, 3257-3263. https://doi.org/10.1007/s00170-016-9043-0
  23. Sonmez V., Testik M.C., Testik O.M. (2018), "Overall Equipment Effectiveness When Production Speeds and Stoppage Durations are Uncertain", International Journal of Advanced Manufacturing, 95, 121-130. https://doi.org/10.1007/s00170-017-1170-8
  24. Stamatis D.H. (2011), The OEE Primer : Understanding Overall Equipment Effectivenss, Reliability and Maintainability, CRC Press.
  25. Tyagi S.K., Akram M. (2013), "Human Reliability Evaluation for Offshore Platform Musters Using Intuitionistic Fuzzy Sets", IEEE Transatcions on Fuzzy Systems, 2(6), 1115-1122.
  26. Tyagi S.K. (2014), "Reliability Analysis of a Powerloom Plant Using Interval Valued Intuitionistic Fuzzy Sets", Applied Mathematics, 5, 2008-2015. https://doi.org/10.4236/am.2014.513193
  27. Xu Z., Cai X. (2013), Intuitionistic Fuzzy Information Aggregation : Theory and Applications, Springer.
  28. Zammori F., Braglia M., Frosolini M. (2011), "Stochastic Overall Equipment Effectivenss", International Journal of Production Research, 49(21), 6469-6490. https://doi.org/10.1080/00207543.2010.519358
  29. Zammori F. (2015). "Fuzzy Overall Equipment Effectiveness(FOEE) : Capturing Performance Fluctuations Through LR Fuzzy Numbers", Production Planning and Control, 26(6), 451-466. https://doi.org/10.1080/09537287.2014.920545