설계단계 시공엔지니어링 업무별 주요 시공성 정보 및 설계요인 분석 - 고층 건축 프로젝트의 가설공사를 중심으로 -

Analysis on Constructability Information and Design Elements by Construction Engineering Task at the Design Phase - Concentrated on Temporary Work in High-rise Building Projects -

  • 투고 : 2018.11.13
  • 심사 : 2018.11.28
  • 발행 : 2018.12.25

초록

Recently, as the shape and function of high-rise buildings have become more complex, engineering for reflecting the constructability in the design phase has the increasing importance. However, engineering tasks are not performed at the appropriate level and timing in most projects, which leads to inefficient work such as design changes and reworks. Hence, this study investigated the constructability knowledge, design elements, and supporting tools required to conduct engineering tasks related to temporary work at the design phase, and also analyzed the relationship between these factors using the correlation analysis. As a result, when the engineering tasks are applied in the design phase, constructability knowledge related to 'construction method and process' is the most important and the design factor related to 'layout/arrangement' should be considered as the most important factor. Based on the results of this study, the project participants can efficiently use necessary constructability knowledge during the design phase and facilitate effective decision-making and design alternatives for enhancing constructability.

키워드

과제정보

연구 과제 주관 기관 : 국토교통부

참고문헌

  1. Kim, M.H. (2006). Management and Organization of the Building Construction. Kimoondang, 425.
  2. Shin, J.W., Ryu, H.G., Lee, D.R. (2008). Informationcentered Design Work Process for Effective Design Management. Journal of the Architectural Institute of Korea, 24(4), pp.133-141.
  3. Lee, J.W. (2018). A Process for Integrating Constructability Information into the Design Phase in High-rise Building Construction [Dissertation]. Chosun University, 73, Korea.
  4. Kim, T.H., Cho, K.M. (2018). Factors Influencing the Constructability of Temporary Work in the Design Phase of Building Construction. Proceedings of the 12th ISAIA, pp.1878-1881.
  5. Lee, J.W., Cho, K.M., Kim, T.H. (2017). Identifying Construction Engineering Tasks at the Design Phase for Enhancing Constructability in High-rise Building Construction. Journal of the Korea Institute of Building Construction, 17(5), pp.453-463 https://doi.org/10.5345/JKIBC.2017.17.5.453
  6. Sohn, Y.J., Jang, K.S. (2008). Understanding of the Temporary Engineering. The Korean Structure Engineers Association, 15(3), pp.80-85.
  7. Fischer, M., Tatum, C.B. (1997). Characteristics of Design-relevant Constructability Knowledge. Journal of Construction Engineering and Management, 123(3), pp.253-260. https://doi.org/10.1061/(ASCE)0733-9364(1997)123:3(253)
  8. Pulaski, M.H., Horman, M.J. (2005). Organizing Construct ability Knowledge for Design. Journal of Construction Engineering and Management, 131(8), pp.911-919. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:8(911)
  9. Park, M.S., Ham, Y.J., Lee, H.S., Kim, W.Y. (2010). Development of Design Process Management Model using Dependency Structure Matrix for Constructability. Korean Journal of Construction Engineering and Management, 11(5), pp.65-74.
  10. Park, J.S., Hyun, C.T., Hong, T.H., Park, S.H., Moon, H.S. (2009). Development of Checklist for Improving Constructability in Steel Structure Construction. Journal of the Architectural Institute of Korea, 25(12), pp.197-206.